Notes
Date Text
2008-04-09 19:00:35DENIED
 REFERENCE: FBC-2004 PLUMBING
 FBC-2004 CHAPTER 1
 FBC-2004 CHAPTER 11
 FBC-2004 BUILDING
 FBC-2004 FUEL GAS
 MUNICIPAL CODE CITY WPB
  
 PLANS IN FOR PLAN REVIEW ONLY AT THIS TIME:
  
 1. SHT G001 PLUMBING FIXTURE COUNT SHOWS SIX LAVS
 REQUIRED. PER TABLE 403.1 SEVEN LAVS ARE REQUIRED.
 PLEASE CORRECT REQUIRED LAV FIXTURE COUNT.
  
 2. SHT G001 FIXTURES PROVIDED SHOWS 3 DRINKING
 FOUNTAINS REQUIRED. 5 DRINKING FOUNTAINS ARE REQUIRED.
 DRINKING WATER AVAILABLE AT THE FOOD SERVICE ONLY
 COUNTS AS ONE FIXTURE EXCEPTION. SHOW 4 DRINKING
 FOUNTAINS. TABLE 403.1 & SECTION 410.1.
  
 3. SHT G001 SHEET INDEX. 3 SHEETS ON THE INDEX WERE NOT
 FOUND & 2 "F" SHEETS & 10 "R" SHEETS SUBMITTED ARE NOT
 SHOWN ON THE INDEX. PLEASE CORRELATE. SECTION 106.1.2.
  
 4. SHT A121 SHOW COMPLIANCE WITH SECTIONS 1210.1 &
 1210.2 OF THE BUILDING CODE FOR FINISHES.
  
 5. SHTS A141 & P111 SUBMIT CALCULATIONS FOR PRIMARY AND
 SECONDARY ROOF DRAINS PER SECTIONS 1106& 1107 WITH
 ALL SUBSECTIONS AND TABLES. INDICATE THE TOTAL AREA TO
 BE DRAINED FOR EACH ROOF DRAIN. INCLUDE IN THE
 CALCULATIONS 1/2 AREA OF ALL VERTICAL WALLS INCLUDING
 PARAPETS AND ANY ROOF AREA THAT DRAINS ON TO THE ROOF
 AREA FROM ABOVE. SUBMIT THE ELEVATION OF THE ROOF AT
 THE HIGH POINTS AND LOW POINTS AS WELL AS THE ELEVATION
 OF THE TOP OF ALL PARAPETS TO VERIFY CALCULATIONS. AS
 SHOWN ON SHT P111 THE SQUARE FOOTAGE INDICATED IS THE
 SAME FOR EACH ROOF DRAIN, BUT THE AREAS ARE DIFFERENT
 PER THE SLOPE AND THE CRICKETS.
  
 6. SHT A313 DETAIL #1 SHOW THE ACCESSIBLE WATER CLOSETS
 IN TOILET ROOMS 108 & 109 TO BE 1'6" OFF THE SIDE WALL
 OF THE STALL PER FIGURE 11-30E.
  
 7. SHT A313 SHOW THE CLEAR FLOOR SPACE FOR ACCESSIBLE
 WATER CLOSETS AND LAVS PER SECTIONS 11-4.16.2 &
 11-4.19.3.
  
 8. SHT A313 DETAIL #20ACCESSIBLE WATER CLOSET IS
 INDICATED AS 1'5" CLEAR OFF THE WALL TO THE CENTERLINE
 OF THE W/C. THE W/C IS REQUIRED TO BE 1'6" OFF THE WALL
 TO THE CENTERLINE OF THE FIXTURE PER FIGURE 11-30E.
 PLEASE CHANGE DETAIL.
  
 9. PLEASE SUBMIT A DETAIL FOR THE ACCESSIBLE DRINKING
 FOUNTAINS SHOWING COMPLIANCE WITH SECTION 11-4.15 AND
 ALL SUBSECTIONS. AT LEAST 50% OF DRINKING FOUNTAINS
 PROVIDED SHALL BE ACCESSIBLE PER SECTION
 11-4.1.3(10)(B).
  
 10. SHT FD1 EQUIPMENT SCHEDULE ITEMS FS0593 & SB0036
 WATER FILTERS SHALL MEET THE REQUIREMENTS OF NSF-42.
 SECTION 611.1. PLEASE SUBMIT MANUF. SPECIFICATION
 SHEETS INDICATING COMPLIANCE.
  
 11. SHT P100 KEY NOTES #2 & #3 ALL PIPING SHALL BE
 SHOWN FOR STORM AND SANITARY WITHIN THE FOOTPRINT OF
 THE BUILDING AND TO 5 FEET OUTSIDE THE BUILDING. THIS
 PIPING SHALL BE INSTALLED BY THE PLUMBING CONTRACTOR
 NOT THE SITE UTILITY CONTRACTOR AS INDICATED PER
 FLORIDA STATUTES 489. SHOW ALL PIPE SIZES, CLEANOUTS,
 OFFSETS, DFU'S FOR SANT. AND ALL PIPE SIZE, OFFSETS,
 C/O'S, SQUARE FOOTAGE ETC. PER TABLES 710.1, 710.2,
 1106.3 AND SECTIONS 708 & 1101.8.
  
 12. SHT P300 DETAIL #4/P300 SHOWS THE TOP OF THE HUB TO
 BE 1/2" ABOVE FINISHED FLOOR. SECTION 802.3.2 REQUIRES
 THE TOP OF THE HUB TO BE 1" ABOVE FINISHED FLOOR.
 PLEASE CORRECT DETAIL.
  
 13. SHT P300 3" FLOOR DRAIN IN MECHANICAL ROOM 003
 INDICATES DETAIL 4/P601. DETAIL 4/P601 IS A GREASE
 INTERCEPTOR DETAIL. PLEASE CLARIFY. SECTION 106.1.1.
  
 14. THE GREASE INTERCEPTOR SHALL BE SIZED BY THE
 UTILITY DEPT. INDUSTRIAL PRETREATMENT, ENVIRONMENTAL
 COMPLIANCE. ALSO THEPHOTO PROCESSING MAY BE REQUIRED
 TO INSTALL A NEUTRALIZING TANK. PLEASE CONTACT RODNEY
 COMPO, ENVIRONMENTAL COMPLIANCE AT (561)644-1821, OR
 BY FAX (561) 822-2287, OR E-MAIL [email protected]. A
 WRITTEN DETERMINATION FOR BOTH ISSUES SHALL BE
 SUBMITTED WITH PLANS INDICATING THE REQUIREMENT
 OUTCOME. ARTICLE III SECTION 90-124(7).
  
 15. SHT P301 DETAIL #5 THERMAL EXPANSION CONTROL IS
 REQUIRED AT THE WATER HEATER PER SECTION 607.3.2.
 PLEASE INDICATE METHOD.
  
 16. SUBMIT AN ISOMETRIC RISER DIAGRAM FOR THE 10" AREA
 DRAINS AT THE TRUCK RAMP/LOADING AREA SHOWN ON SHT
 P110. SHOW ALL PIPE SIZES AND SQUARE FOOTAGE AS IT
 ACCUMULATES IN THE SYSTEM. SHOW THE SQUARE FOOTAGE
 DRAINED BY EACH DRAIN AND SUBMIT CALCULATIONS SHOWING
 THE VERTICAL CONTRIBUTION ADDED TO EACH AREA. SHOW THE
 TERMINATION POINT OF PIPING. SECTIONS 106.3.5.1.3, 1106
 & 1107 WITH ALL SUBSECTIONS & TABLES.
  
 17. SHT P302 FILTERS FOR FCW-F, (FS-0593), SHALL MEET
 THE REQUIREMENTS OF NSF-42. SECTION 611.1. PLEASE
 SUBMIT MANUF. SPECIFICATION SHEETS.
  
 18. SHT P302 THE RO SYSTEM SHALL MEET THE REQUIREMENTS
 OF NSF-58. SECTION 611.2. PLEASE SUBMIT MANUF.
 SPECIFICATION SHEETS.
  
 19. SHT P311 DETAIL #3 THERMAL EXPANSION CONTROL IS
 REQUIRED PER SECTION 607.3.2. PLEASE INDICATE METHOD.
  
 20. SHT P351 DETAIL #5 THERMAL EXPANSION CONTROL IS
 REQUIRED PER SECTION 607.3.2. PLEASE INDICATE METHOD.
  
 21. SHT P501 DETAILS #2 & #5 WATER HAMMER ARRESTORS
 SHALL BE LOCATED NEAR THE FIXTURES IN AN "EFFECTIVE
 RANGE" NOT IN THE CEILING AS SHOWN. PDI-WH 201. PLEASE
 SHOW THE WATER HAMMER ARRESTORS NEAR THE FIXTURES.
  
 22. SHT P501 DETAILS #1, #3 & #4 SUBMIT HORIZONTAL
 BUILDING STORM & SANITARYDRAIN ISOMETRIC RISER
 DIAGRAMS FOR THE UNDERGROUND PIPING TO 5FT OUTSIDE THE
 BUILDING. SHOW ALL PIPE SIZE, CLEANOUTS, OFFSETS DFU'S
 FOR SANT. AND ALL PIPE SIZE, C/O'S, OFFSETS, SQUARE
 FOOTAGE ETC. PER TABLES 710.1, 710.2, 1106.3 AND
 SECTIONS 106.3.5.1.3, 708 & 1101.8.
  
 23. SUBMIT VACUUM/CONDENSATE ISOMETRIC RISER DIAGRAM
 SHOWING ALL PIPE SIZES, OFFSETS, VENTS AS WELL AS THE
 TERMINATION POINT FOR THE SYSTEM. SECTION 106.3.5.1.3.
  
 24. A SEPARATE GAS PERMIT IS REQUIRED. THE FOLLOWING IS
 REQUIRED FOR THE GAS PERMIT.
  
 A. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2004
 FUEL GAS CODE.--LENGHTS OF CUT SECTIONS NOT SHOWN.
  
  
 B. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE IF BEING USED.
  
 C. SHOW THE DISTANCE FROM THE POINT OF
 DELIVERY, (METER), TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM PER
 FBC-2004 FUEL GAS CODE APPENDIX A - USE
 OF CAPACITY TABLES A.3.1(4).--TO BE VERIFIED WHEN
 COMMENT 24(A) SUBMITTED.
  
 D. SUBMIT CALCULATIONS FOR COMBUSTION
 AIR (IF APPLICABLE) PER FBC-2004 FUEL
 GAS CODE SECTION 304.
  
 E. SUBMIT A DETAIL SHOWING THE TYPE,
 LOCATION, SIZE AND TERMINATION OF THE
 GAS VENTS PER FBC-2004 FUEL GAS CODE
 SECS. 502 THRU 505.
  
 F. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2004 FUEL GAS CODE SEC 402.2.
  
 G. THE LOCATION OF THE GAS METER, THE GENERATOR AND
 ASSOCIATED GAS PIPING SHALL BE INDICATED ON THE
 PLUMBING SHEETS TO VERIFY THE GAS ISOMETRIC PIPING.
 SECTION 106.1.2.
  
 25. PLANS ARE NOT 100% COMPLETE AT THIS TIME AND MORE
 COMMENTS MAY FOLLOW.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE
 THE REVISION & REMOVE & REPLACE ANY
 PAGES AS NECESSARY. A TRANSMITTAL LETTER
 LISTING THE ORIGINAL REVIEW COMMENT NUMBER,
 WITH A DESCRIPTION OF THE REVISION MADE, IDENTIFYING
 THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND
 WILL HELP TO EXPEDITE YOUR PERMIT. REMOVE
 ALL VOID SHEETS FROM ALL PLANS AND PLACE
 ONE SET OF THEM LOOSELY ON TOP OF THE
 COLLATED PLANS TO BE REVIEWED.
 THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 805-6731
 E-MAIL [email protected]