| 2008-02-05 08:27:06 | *** PROVISO *** |
| | 1) PER 2004 FBC, FUEL GAS - POWERED EQUIPMENT |
| | PERMANENTLY INSTALLED EQUIPMENT POWERED BY INTERNAL |
| | COMBUSTION ENGINES SHALL BE INSTALLED IN ACCORDANCE |
| | WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS AND NFPA |
| | 37.NFPA 37 INSTALLATION & USE OF STATIONARY |
| | COMBUSTION ENGINES & GAS TURBINES: 4.1.4ENGINES |
| | (GENERATORS) LOCATED OUTDOORS SHALL BE MINIMUM OF 5 FT |
| | FROM OPENINGS IN WALLS & AT LEAST 5 FT FROM STRUCTURES |
| | HAVING COMBUSTIBLE WALLS.A MINIMUM CLEARANCE IS NOT |
| | REQUIRED WHEN (1) THE ADJACENT WALL HAS A MINIMUM FIRE |
| | RESISTANCE RATING OF 1 HOUR OR (2) THE WEATHERPROOF |
| | ENCLOSURE IS CONSTRUCTED OF NON-COMBUSTIBLE MATERIALS, |
| | AND IT HAS BEEN DEMONSTRATED THAT A FIRE WITHIN THE |
| | ENCLOSURE WILL NOT IGNITE COMBUSTIBLE |
| | MATERIALS OUTSIDE THE ENCLOSURE. INFORMATIVE: A.8.2.3.1 |
| | EXHAUST SYSTEMS SHOULD NOT TERMINATE UNDER STRUCTURES |
| | OR |
| | WHERE THE EXHAUST MIGHT BE DRAWN INTO THE VENTILATION |
| | INTAKES. |
| | 2004 FMC 804.3.5 #3, WHERE THE TERMINATION IS |
| | LOCATED BELOW AN ADJACENT ROOF STRUCTURE, THE |
| | TERMINATION POINT |
| | SHALL BE LOCATED AT LEAST 3 FT FROM THE ROOF |
| | STRUCTURE. |
| | PLEASE NOTE, WHILE ZONING ALLOWS MECHANICAL |
| | EQUIPMENT TO ENCROACH 4 FT INTO THE REQUIRED SETBACK, |
| | GENERATORS SHALL MAINTAIN THE REQUIRED ABOVE MENTIONED |
| | CLEARANCES TO THE ADJACENT PROPERTY STRUCTURES, I.E. |
| | FENCE, BUILDING, WINDOWS, DOORS, OR OPENINGS. |
| | FOLLOW MANUFACTURER'S RECOMMENDED CLEARANCES |
| | AROUND EQUIPMENT FOR SERVICING,AND PROVIDE |
| | MANUFACTURER'S INSTALLATION INSTRUCTIONS AT THE JOBSITE |
| | FOR THE FIELD INSPECTOR. |
| | MECHANICAL PLAN REVIEW BY; |
| | TOM GORDON (561) 805-6729 |
| | E-MAIL; [email protected] |