| Plan Review Notes For Permit 08010640 |
| Permit Number |
08010640 |
|
| Review Stop |
B |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2008-03-07 09:25:18 | 2004 FBC W/2007 REVISIONS | | | ADDITION | | | | | | DENIED BY BUILDING | | | | | | 1)A RECORDED COPY OF THE NOTICE OF COMMENCEMENT WILL | | | BE REQUIRED. | | | | | | 2) THE ROOF COMPONENT AND CLADDING PRESSURES (WIND | | | LOAD) ON SHEET AO1 ARE INCORRECT. SEE FBC TABLE | | | R301.2(2)OR SUBMIT SIGNED AND SEALED CALCULATIONS | | | INDICATING HOW THE SPECIFIED PRESSURES WERE OBTAINED. | | | FBC 106.1.2* CITY AMENDMENTS. | | | | | | 3) THE FASTENING OPTION SPECIFIED ON PAGE 18 OF THE | | | PRODUCT APPROVAL FOR THE GAF BUILT UP ROOF SYSTEM HAS A | | | MAXIMUM DESIGN PRESSURE OF -75 PSF WHICH IS TOO LOW FOR | | | THE CORNER AREAS OF THE FLAT ROOF WHICH HAVE AN UPLIFT | | | OF -89 PSF PER TABLE R301.2(2). SUBMIT RAS 117 | | | CALCULATIONS FOR ENHANCED FASTENING AS REQUIRED BY | | | LIMITATION #7 OF THE PRODUCT APPROVAL. SEE COMMENT # 18 | | | OF THE FIRST REVIEW. RULE 9B-72 FBC 106.1.2* CITY | | | AMENDMENTS. | | | | | | 4) NOTE: DURING THE COURSE OF THE PROJECT THE | | | CONTRACTOR WILL BE REQUIRED TO PERFORM INVESTIGATIVE | | | WORK TO DETERMINE THAT THE EXISTING FOOTINGS, TIE BEAMS | | | AND STRUCTURE ARE ADEQUATE TO SUPPORT THE SECOND STORY | | | ADDITION. ADDITIONAL DETAILS FROM THE DESIGNER OF | | | RECORD MAY BE REQUIRED. FBC 106.1.2* CITY AMENDMENTS. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|