| Date |
Text |
| 2008-03-24 15:56:40 | DENIED |
| | REFERENCE: FBC-2004 PLUMBING |
| | FBC-2004 CHAPTER 1 |
| | FBC-2004 CHAPTER 11 |
| | CITY WPB MUNICIPAL CODE |
| | FLORIDA ADMINISTRATIVE CODE |
| | FLORIDA STATUTES |
| | |
| | |
| | 1. PLANS ARE INCOMPLETE AT THIS TIME AND MORE COMMENTS |
| | MAY BE FORTHCOMING WHEN ALL REQUIRED PLANS ARE |
| | SUBMITTED. SECTION 106.1.2. |
| | |
| | 2. SHT G-1.0 THE INDEX OF DRAWING DOES NOT REFLECT THE |
| | SHEETS SUBMITTED. MANY SHEETS SHOWN ON THE INDEX WERE |
| | NOT SUBMITTED AND MANY SHEETS SUBMITTED WERE NOT |
| | INDICATED ON THE INDEX OF DRAWINGS. PLEASE CORRELATE. |
| | SECTION 106.1.1. |
| | |
| | 3. ALL ARCHITECTURAL SHEETS. THE SIGNATURE OF THE |
| | ARCHITECT IS REQUIRED ON EACH SHEET. IT APPEARS THAT |
| | INITIALS HAVE BEEN USED TO SIGN THE PLANS. IF INDEED |
| | THIS IS THE ARCHITECTS LEGAL SIGNATURE, THEN A SIGNED, |
| | SEALED, NOTORIZED LETTER INDICATING THE LEGAL SIGNATURE |
| | OF THE ARCHITECT. FAC 61G1-16.003, 61G1-16.004(5) & FS |
| | 481.2055. |
| | |
| | 4. SHT AN-2.1 MEN'S & WOMEN'S BATHROOM & CHANGING ROOM |
| | SHALL BE ACCESSIBLE. PLEASE SUBMIT DETAILS SHOWING |
| | COMPLIANCE WITH SECTIONS 11-4.16, 11-4.17, 11-4.19 & |
| | 11-4.22 WITH ALL SUBSECTIONS. |
| | |
| | 5. SHT AN-2.1 THE GREASE INTERCEPTORS SHALL BE SIZED BY |
| | THE UTILITY DEPT. PLEASE CONTACT RODNEY COMPO, |
| | ENVIRONMENTAL COMPLIANCE AT (561) 644-1821, BY FAX |
| | (561) 822-2287, OR BY E-MAIL [email protected]. A WRITTEN |
| | DETERMINATION SHALL BE SUBMITTING INDICATING THE |
| | REQUIRED GREASE INTERCEPTOR SIZE. ARTICLE III SECTION |
| | 90-124(7)(A THRU G). |
| | |
| | 6. SHT AN-2.1 THE MINIMUM FACILITIES CALCULATIONS ARE |
| | UNCLEAR. THE FIXTURES FOR THE ASSEMBLY ARE INDICATED ON |
| | THE FLOOR PLAN. ALSO THE TOILET FACILITIES FOR THE |
| | MEETING ROOM ARE SHOWN ALL EXCEPT THE DRINKING |
| | FOUNTAINS, (ONLY 1 SERVICE SINK REQUIRED FOR THE |
| | BUILDING IF ACCESSIBLE TO ALL RETAIL SPACES). BUT NO |
| | FIXTURES ARE SHOWN FOR THE TETAIL SPACES. WILL THESE BE |
| | INDICATED AT THE BUILD-OUT OF THE RETAIL SPACES? ALSO 3 |
| | DRINKING FOUNTAINS ARE REQUIRED BUT ONLY 2 DRINKING |
| | FOUNTAINS ARE SHOWN. TABLE 403.1. |
| | |
| | 7. SHT AN-2.1 SHOWS FLAT FLOOR DRAINS AT THE PLAZA ON |
| | THE WEST SIDE OF THE MAIN LOBBY/DROP OFF AREA BUT NOT |
| | ON THE LEFT SIDE. PLEASE CLARIFY. ALSO THERE ARE 10 |
| | OTHER FLAT FLOOR DRAINS SHOWN AT THE DRIVE THRU/DROP |
| | OFF AREA. IF THESE ARE FOR STORM DRAINAGE THEN THE |
| | CORRECT RECEPTICLE FOR DRAINING THE STORM WATER IS AREA |
| | DRAINS. SECTION 202. |
| | |
| | 8. SHT AN-2.3 MANY UNIT TYPES ARE NOT LEGIBLE. THERE IS |
| | OTHER INFORMATION PRINTED OVER THE TOP OF THE UNIT |
| | TYPE. SECTION 106.1.1. |
| | |
| | 9. SHT AN-2.4 MORE INFORMATION IS REQUIRED. WILL THE |
| | PRIVATE TERRACES FOR UNITS "D" & "F" HAVE STORM |
| | DRAINAGE? PLEASE CLARIFY. SECTIONS 106.1.2, 1106 & |
| | 1107. |
| | |
| | 10. SUBMIT CALCULATIONS FOR PRIMARY AND SECONDARY ROOF |
| | DRAINS AT EACH DECK, TERRACES, PRIVATE TERRACES, POOL |
| | DECK AND ROOF ELEVATIONS PER SECTIONS 1106 & 1107 WITH |
| | ALL SUBSECTIONS AND TABLES. WHERE REQUIRED SHOW ALL |
| | SECONDARY DRAINS/SCUPPERS. SHOW THE AREA PLUS 1/2 THE |
| | VERTICAL WALL CONTRIBUTION INCLUDING PARAPETS AS WELL |
| | AS ALL ROOF AREAS THAT DRAIN ON TO THE AREA FROM ABOVE |
| | FOR EACH DRAIN IN THE CALCULATIONS SUBMITTED. |
| | |
| | 11. SHT AN-8.1 SHOW COMPLIANCE WITH SECTION 1210.2 FOR |
| | COMMON AREA TOILET ROOMS AND BATHROOMS. |
| | |
| | 12. SUBMIT RISER DESIGNATION NUMBERS FOR EACH RISER SO |
| | THEY CAN BE TRACKED THRU THE BUILDING FROM THE |
| | UNDERGROUND THRU THE VENT THRU ROOF. (EXAMPLES SAN-1, |
| | SAN-2, SAN-3, RWL-1, RWL-2, RWL-3 ETC.) (SEE CONDENSATE |
| | RISER DESIGNATION NUMBERS).--RISER #1 AS SHOWN DOES |
| | NOT RELFECT ALL RISERS DESIGNATED AS RISER #1. RISER #1 |
| | SHOWS KITCHEN SINKS ON THE 2ND THRU 8TH FLOORS (14 |
| | DFU), BUT SOME RISER #1 DO NOT HAVE A KITCHEN SINK ON |
| | THE 2ND FLOOR AS SHOWN ON THE FLOOR PLAN. THOSE RISER |
| | #1 CAN BE TYPICAL OF MANY RISERS AND CAN BE INDICATED |
| | AS RISER #1 TYPICAL OF SAN-1, SAN-5, SAN-7 ETC FOR |
| | EXAMPLE AS RISERS THAT ARE THE SAME AS RISER #1. FOR |
| | RISERS THAT ARE DIFFERENT BUT IN THE SAME CATAGORY |
| | THOSE RISERS CAN BE TYPICAL OF ANOTHER RISER NUMBER. |
| | EACH TYPICAL RISER SHALL INDICATE THE OFFSETS SHOWN ON |
| | THE FLOOR PLAN.THIS IS REQUIRED FOR EACH RWL OR STORM |
| | RISER ALSO. |
| | |
| | 13. SUBMIT A COMPLETE STORM RISER ISOMETRIC RISER |
| | DIAGRAM FOR THE BUILDING STORM HORIZONTAL DRAINAGE |
| | SYSTEM. SHOW ALL PIPE SIZES, RISERS FROM THE BUILDING |
| | STORM DRAIN THRU TO THE DECK DRAINS, TERRACE DRAINS, |
| | ROOF DRAINS ETC, CLEANOUTS, OFFSETS & INDICATE SQUARE |
| | FOOTAGE AS IT ACCUMULATES IN THE SYSTEM. INDICATE THE |
| | RISERS DESIGNATION NUMBERS FOR EACH RISER TO TRACK |
| | PIPING THRU THE BUILDING. SECTIONS 106.3.5.1.3, 1101.1, |
| | 1101.8, 1106 & 1107 WITH ALL SUBSECTIOS & TABLES. |
| | |
| | 14. SUBMIT STORM RISER DIAGRAMS. SHOW ALL PIPE SIZES, |
| | OFFSETS ETC. AND INDICATE THE RISER DESIGNATION NUMBER |
| | FOR EACH RISER SO IT CAN BE TRACKED FROM THE STORM |
| | BUILDING HORIZONTAL DRAIN THRU THE DECK DRAINS, |
| | TERRACES, ROOF DRAINS ETC. SECTIONS 106.3.5.1.3, 1106, |
| | & 1107 WITH ALL SUBSECTIONS & TABLES. |
| | |
| | 15. SUBMIT A COMPLETS SANITARY ISOMETRIC HORIZONTAL |
| | RISER DIAGRAM FOR THE BUILDING SANITARY DRAIN INCLUDING |
| | ALL PIPING NOT SHOWN ON VERTICAL RISER DIAGRAMS. SHOW |
| | ALL PIPE SIZES, CLEANOUTS, TRAPS, VENTS ETC. SECTIONS |
| | 106.3.5.1.3, 701.1, 704, 708, 901 & 1001.1. |
| | |
| | 16. SUBMIT A COMPLETE CONDENSATE HORIZONTAL ISOMETRIC |
| | RISER DIAGRAM AND VERTICAL RISER DIAGRAMS IN ISOMETRIC |
| | FORM. SHOW ALL PIPE SIZES, OFFSETS ETC. SECTION |
| | 106.3.5.1.3. |
| | |
| | 17. SUBMIT A COMPLETE POTABLE HORIZONTAL WATER |
| | ISOMETRIC RISER DIAGRAM AND VERTICAL RISER DIAGRAMS |
| | SHOWING ALL PIPE SIZES, VALVES & WATER HAMMER |
| | ARRESTORS. SECTIONS 106.3.5.1.3, 601.1, 603, 604, 606, |
| | 607, & 608 WITH ALL SUBSECTIONS AND TABLES. |
| | |
| | 18. SHT PN-201 AREA DRAIN NEAR COL. LINE 8 BETWEEN |
| | COLS. N & O SHOWS 4" AD BUT ALSO SHOWS 6" AD(3907SF) |
| | WITH 4" DOWNSTREAM. PLEASE CLARIFY. TABLE 1106.3. (6" |
| | PIPE REQD FOR 3907SF @ 1/8"/FT. |
| | |
| | 19. SHT PN-2.01 CD/18 - CD/19 - CD/20 - CD/21 SHOWS |
| | 1-2/2" CD DRAIN. PLEASE CLARIFY. SECTION 106.1.1. |
| | |
| | 20. SHT PN-2.01 INFORMATION NEAR COL. LINE 8/I IS NOT |
| | LEGIBLE. PLEASE CLARIFY. SECTIONS 106.1.1 & 106.1.2. |
| | |
| | 21. SHT PN-2.01 ALL CONDENSATE LINES, RWL LINES & STORM |
| | LINES ARE SHOWN WITHOUT PIPING. PLEASE INDICATE WHERE |
| | THESE LINES CONNECT TO THE HORIZONTAL CONDENSATE AND |
| | STORM DRAINS. SECTIONS 106.1.1, 106.1.2, 1101.1, TABLES |
| | 1106.2, 1106.3. |
| | |
| | 22. SHT PN-2.01 SHOW THE REQUIRED CLEANOUTS FOR ALL |
| | SYSTEMS PER SECTIONS 708, & 1101.8. |
| | |
| | 23. SHT PN-2.02ALL CONDENSATE LINES, RWL LINES & |
| | STORM LINES ARE SHOWN WITHOUT PIPING. PLEASE INDICATE |
| | WHERE THESE LINES CONNECT TO THE HORIZONTAL CONDENSATE |
| | AND STORM DRAINS. SECTIONS 106.1.1, 106.1.2, 1101.1, |
| | TABLES 1106.2, 1106.3. |
| | |
| | 24. SHT PN-2.02 INFORMATION BY CONDENSATE RISERS 30,31 |
| | & 33 THRU 35 IS NOT LEGIBLE. SECTION 106.1.1. PLEASE |
| | CLARIFY. |
| | |
| | 25. SHT PN-2.02 SHOWS 4" AD BUT ALSO SHOWS 6" AD |
| | (3707SF) WITH 4" DOWNSTREAM. PLEASE CLARIFY. TABLE |
| | 1106.3. (6" PIPE REQD FOR 3707SF @ 1/8"/FT. |
| | |
| | 26. SHT PN-2.02 SHOWS 4" FD (955 SF) AT COL. LINE |
| | 14/F.2. IF THIS IS STORM, THE RECEPTICAL SHALL BE |
| | DESIGNATED AS AN AREA DRAIN OR ROOF DRAIN. SECTION |
| | 202.1. |
| | |
| | 27. SHT PN-2.02 SHOWS TWO 12" STORM SEWER PIPES AT THE |
| | CEILING BUT DOES NOT INDICATE THE PIPES CONNECTING TO |
| | ANY BUILDING STORM DRAIN OR STORM RISERS. PLEASE |
| | CLARIFY. SECTIONS 106.1.1, 106.1.2 & 1106. |
| | |
| | 28. SHT PN-2.02 NOTES AT EAST SIDE OF BLDG ARE |
| | INCOMPLETE. SECTIONS 106.1.1 & 106.1.2. PLEASE SUBMIT |
| | COMPLETE INFORMATION. |
| | |
| | 29. SHT PN-2.02 SHOW REQUIRED CLEANOUTS REQUIRED FOR |
| | THE SANITARY AND STORM SYSTEMS PER SECTIONS 708 & |
| | 1101.8. |
| | |
| | 30. SHT PN-2.02 SHOWS24" ROUND BY 24" DEEP SUMP PIT |
| | AND AN 18"X18"X18" SUMP PIT BUT THERE IS NO PIPING |
| | EXITING THE PITS. PLEASE SHOW THE SUMP DISCHARGE PIPING |
| | ON THE FLOOR PLAN AND SUBMIT A RISER DIAGRAM FOR THE |
| | PIPING SHOWING ALL PIPE SIZES, CLEANOUTS. VALVES & |
| | CHECK VALVES AS WELL AS THE TERMINATION POINT FOR THE |
| | DISCHARGE LINES. SECTIONS 106.1.2 & 712. |
| | |
| | 31. SHT PN-2.03 DETAIL #3 PLAN VIEW SHOWS A 6" SAN |
| | STACK BUT THE RISER DIAGRAM AND THE FLOOR PLAN SHOW A |
| | 4" SAN STACK. PLEASE CORRELATE. SECTION 106.1.1 & |
| | TABLES 710.1(1) & 710.1(2). |
| | |
| | 32. SHT PN-2.03 DETAIL #3 RISER ISOMETRIC RISER DIAGRAM |
| | DOES NOT REFLECT THE FLOOR PLAN AT THE DRINKING |
| | FOUNTAINS. PLEASE CORRELATE. SECTION 106.1.1. |
| | |
| | 33. SHT PN-2.03 6" RWL OFFSET AT COL. LINE 8/M-N |
| | INDICATED DOWN AT BOTH ENDS OF THE OFFSET. PLEASE |
| | CLARIFY. SECTION 106.1.1. |
| | |
| | 34. SHT PN-2.03 VENT SHOWN IN THE FLOOR BY THE TURNING |
| | AREA. PLEASE CLARIFY. SECTION 106.1.1. |
| | |
| | 35. SHT PN-2.04 THE 6" RWL OFFSET AT COL. LINE 11 SHOWS |
| | DOWN AT BOTH ENDS OF THE OFFSET. PLEASE CLARIFY. |
| | SECTION 106.1.1. |
| | |
| | 36. SHT PN-2.04 A RELIEF VENT IS REQUIRED FOR THE 2" |
| | AAV. SECTION 917.3.2. |
| | |
| | 37. SHT PN-2.04 COL. LINE 14 INDICATES A 4" FD (955 |
| | SF). IF THE SYSTEM IS FOR STORM WATER, THE RECEPTICAL |
| | SHALL BE DESIGNATED AS A ROOF DRAIN OR AREA DRAIN. |
| | SECTION 202. |
| | |
| | 38. SHT PN-2.05A RELIEF VENT IS REQUIRED FOR THE 3" |
| | AAV. SECTION 917.3.2. |
| | |
| | 39. SHT PN-2.05 SHOWS 4" SAN. DOWN FOR RISER 168FU & 6" |
| | DOWN 424FU ON THE SAME BRANCH/DRAIN LINE. PLEASE |
| | CLARIFY. SECTION 106.1.1. |
| | |
| | 40. SHT PN-2.05 SHOWS A TWO INCH VENT AT THE CEILING |
| | SPACE, BUT DOES NOT WHOW WHERE THE VENT IS LOCATED. |
| | PLEASE CLARIFY. SECTION 106.1.2. |
| | |
| | 41. SHT PN-2.05 INDICATES A 4" SAN DOWN FOR RISERS 1 & |
| | 2 AT THE UPPER END OF THE DRAIN LINE. PLEASE CLARIFY. |
| | SECTION 106.1.1. |
| | |
| | 42. SHT PN-2.05 INDICATES A 4" SAN DOWN FOR RISERS 2 & |
| | 3 AT THE UPPER END OF THE DRAIN LINE. PLEASE CLARIFY. |
| | SECTION 106.1.1. |
| | |
| | 43. SHT PN-2.05 INDICATES A 3" VENT DOWN BY COL. LINE |
| | 4/J-K. VENT TO TERMINATE OUTSIDE OF BUILDING. PLEASE |
| | CLARIFY. SECTION 903.3. |
| | |
| | 44. SHT PN-2.06 SHOWS 4" FLOOR DRAIN (955 SF) & 4" |
| | FLOOR DRAIN (303 SF). IF THE SYSTEM IS FOR STORM WATER, |
| | THE RECEPTICAL SHALL BE DESIGNATED AS A ROOF DRAIN OR |
| | AREA DRAIN. SECTION 202. |
| | |
| | 45. SHT PN-2.06 A RELIEF VENT IS REQUIRED FOR THE 3" |
| | AAV. SECTION 917.3.2. |
| | |
| | 46. SHT PN2.06 SHOWS A 3" SD FROM BELOW (294 SF), BUT |
| | THE RISER SEEMS TO BE AT THE HIGH END OF THE DRAIN |
| | LINE. PLEASE CLARIFY. SECTION 106.1.1. |
| | |
| | 47. SHT PN-2.07 INFORMATION SOUTH OF CD RISERS 60 & 61 |
| | NOT LEGIBLE. INDICATE THE LOCATION OF THE STORM DRAINS. |
| | SECTIONS 106.1.1 & 106.1.2. |
| | |
| | 48. SHT PN-2.07 A RELIEF VENT IS REQUIRED FOR THE 3" |
| | AAV. SECTION 917.3.2. |
| | |
| | 49. SHT PN-2.07 SHOWS A 4" FLOOR DRAIN (900 SF).IF |
| | THE SYSTEM IS FOR STORM WATER, THE RECEPTICAL SHALL BE |
| | DESIGNATED AS A ROOF DRAIN OR AREA DRAIN. SECTION 202. |
| | |
| | 50. SHT PN-2.08 INFORMATION BY CD/48 NOT LEGIBLE. |
| | PLEASE CLARIFY. SECTION 106.1.1. |
| | |
| | 51. SHT PN-2.08 SHOWS 4" FLOOR DRAIN (955 SF) & 4" |
| | FLOOR DRAIN (303 SF). IF THE SYSTEM IS FOR STORM WATER, |
| | THE RECEPTICAL SHALL BE DESIGNATED AS A ROOF DRAIN OR |
| | AREA DRAIN. SECTION 202. |
| | |
| | 52. SHT PN-2.09 INDICATES CD/17A RISER THAT IS NOT |
| | SHOWN ON THE PREVIOUS LEVELS/ PLEASE CLARIFY. SECTIONS |
| | 106.1.1 & 106.1.2. |
| | |
| | 53. SHT PN-2.09 NOTE BY COL. LINE 9/P NOT LEGIBLE. |
| | PLEASE CLARIFY. SECTION 106.1.1. |
| | |
| | 54. SHT PN-2.10 SHOWS FOUR 4" FLOOR DRAINS, (303 SF) |
| | (955 SF) (993 SF) (404 SF). IF THE SYSTEM IS FOR STORM |
| | WATER, THE RECEPTICAL SHALL BE DESIGNATED AS A ROOF |
| | DRAIN OR AREA DRAIN. SECTION 202. |
| | |
| | 55. SHT PN-2.10 SANITARY RISER #1 NEAR N.1/K.1 - 15/16 |
| | COL LINE IS INDICATED AS RISER 1B ON THE 2ND FLOOR. |
| | PLEASE CORRELATE. SECTION 106.1.1 & TABLE 710.1(2). |
| | |
| | 56. PLUMBING FLOOR PLANS FOR THE 4TH THRU 8 TH FLOORS, |
| | ROOF PLANS & POOL DECK HAVE NOT BEEN SUBMITTED. PLEASE |
| | SUBMIT ALL FLOOR PLANS. SECTION 106.1.2. |
| | |
| | 57. SHT PN-3.0 DETAIL #3 SANITARY RISER #1 DOES NOT |
| | REFLECT THE FLOOR PLAN. PLEASE CORRELATE. SECTION |
| | 106.1.1. |
| | |
| | 58. SHT PN-3.2 RISER I2 DOES NOT REFLECT THE FLOOR PLAN |
| | AT THE LAV. PLEASE CORRELATE. SECTION 106.1.1. |
| | |
| | 59. SHT PN-3.2 RISER G1 VENT REQUIRED FOR BOTH LAVS. |
| | SECTION 901.2.1. |
| | |
| | 60. SHT PN-3.3 DETAIL #3 UNIT M SHOW PIPING TO W/C 2ND |
| | BATH. SECTION 106.1.2. |
| | |
| | 61. SHT PN-3.3 RISER K1 DOES NOT REFLECT THE FLOOR |
| | PLAN. PLEASE CORRELATE. SECTION 106.1.1. |
| | |
| | 62. SHT PN-3.4 RISER P6 VENT FOR LAV DOES NOT RELFECT |
| | THE FLOOR PLAN. PLEASE CORRELATE. SECTION 106.1.1. |
| | |
| | 63. SHT PN-4.0 RISER FOR UNIT C DETAIL #3 DOES NOT |
| | REFLECT THE FLOOR PLAN. PLEASE CORRELATE. SECTION |
| | 106.1.1. |
| | |
| | 64. SHT PN-4.1 RISER FOR UNIT K1 DETAIL 1 DOES NOT |
| | REFLECT THE FLOOR PLAN AT THE WATER HEATER BETWEEN REF |
| | & KITCHEN SINK & 3/4" TO W/M ON FLOOR PLAN, 1/2" ON |
| | RISER. PLEASE CORRELATE. SECTIONS 106.1.1 & 601.1. |
| | |
| | 65. SHT PN-4.1 RISER FOR UNIT E DETAIL 2 DOES NOT |
| | REFLECT THE FLOOR PLAN. PLEASE CORRELATE. SECTIONS |
| | 106.1.1 & 601.1. (SHOWS 1" PAST LAV IN 2ND BATH). |
| | |
| | 66. SHT PN-4.2 RISER FOR UNIT I DETAIL 3 DOES NOT |
| | REFLECT THE FLOOR PLAN. PLEASE CORRELATE. SECTIONS |
| | 106.1.1 & 601.1. (WATER SUPPLY LINE TO W/H AND OUT OF |
| | THE W/H). |
| | |
| | 67. SHT PN-4.4 UNIT P RISER AND FLOOR PLAN. SHOW THE |
| | PIPE SIZE FOR THE COLD WATER FROM THE UNIT SHUT OFF |
| | VALVE TO PAST 1ST LAV. (1/2" INDICATED). SECTIONS |
| | 106.1.2 & 601.1. |
| | |
| | 68. SHT PN-4.4 UNIT O SHOWS 3/4" COLD WATER TO BATHROOM |
| | ON FLOOR PLAN, BUT INDICATES BOTH 3/4" AND 1/2" COLD |
| | WATER PAST KITCHEN SINK ON RISER DIAGRAM. PLEASE |
| | CLARIFY AND CORRELATE. SECTIONS 106.1.1, 106.1.2, 601.1 |
| | & 604. |
| | |
| | 69. SHT PN-4.5 INDICATES 1/2" HOT WATER TO REF IN UNIT |
| | T RISER. COLD WATER SUPPLY REQUIRED. SECTIONS 106.1.1 & |
| | 601.1. |
| | |
| | 70. SHT PN-5.0 UNABLE TO VERIFY SANITARY RISER TO SEE |
| | IF THEY REFLECT THE FLOOR PLANS AS THE 4TH THRU 8TH |
| | FLOORS & POOL DECK HAVE NOT BEEN SUBMITTED.SOME |
| | RISERS ARE NOT TYPICAL. SOME FLOOR PLANS SHOW OFFSETS |
| | NOT TYPICAL OF OTHER RISERS WITH THE SAME NUMBER. EACH |
| | RISER SHALL BE INDIVIDUALLY NUMBERED SO THEY CAN BE |
| | TRACKED THRU THE BUILDING. |
| | |
| | 71. SHT PN-5.1 RISER DIAGRAM SUBMITTED IS NOT COMPLETE. |
| | SUBMIT AN ISOMETRIC RISER DIAGRAM THAT REFLECT THE |
| | COMPLETE SANITARY BUILDING HORIZONTAL DRAIN WITH RISER |
| | CONNECTIONS THAT REFLECTS THE FLOOR PLAN. SHOW ALL PIPE |
| | SIZES, TRAPS, VENTS, AND DFU'S AS THEY ACCUMULATE TIN |
| | THE SYSTEM. SECTIONS 106.3.5.1.2, 701.1 704, 706, 708, |
| | 709, 710 & 711. |
| | |
| | 72. SHT PN-6.01 NON-POTABLE WATER TREATMENT ISOMETRIC |
| | RISER DIAGRAM. PLEASE SHOW ALL PIPE SIZES. SUBMIT A |
| | WATER RISER DIAGRAM FOR THE COMPLETE SYSTEM FROM THE |
| | PUMP, CHLORINATOR & FILTER AREA TO THE PUBLIC TOILETS, |
| | AND TO THE POINT OF IRRIGATION CONNECTION. SHOW THE |
| | LOCATION OF THE PUMP, CHLORINATOR & FILTER AREA ON THE |
| | FLOOR PLAN AS WELL AS THE PIPING TO THE TOILET ROOMS |
| | AND FIXTURES AND THE POINT OF CONNECTION FOR THE |
| | IRRIGATION. SECTIONS 106.1.2 & 601.1. |
| | |
| | ***FHA/ACCESSIBILITY NOTES*** |
| | |
| | 73. SHTS AN-2.4, AN-2.3, AN-2.6 & AN-2.7 UNIT TYPE "E" |
| | SHOW THE W/C ADJACENT TO THE WALL IN ONE BATHROOM. NO |
| | BACKING DETAIL HAS BEEN SUBMITTED FOR THE W/C NEXT TO A |
| | WALL ON SHT AN-7.2. PLEASE SUBMIT BACKING DETAIL AS |
| | INDICATED ON PAGES 6.4 & 6.5. |
| | |
| | 74. SHT AN-7.2 DETAIL 5 THE OPENING FOR THE WATER |
| | CLOSET BETWEEN THE LAV AND TUB SHALL SHOW A MINIMUM |
| | 33". (18" - 15"). SEE PAGES 7.43 THRU 7.45. |
| | |
| | 75. SHT AN-7.2 DETAIL 6 ELEVATION. SHOW THE BOTTOM OF |
| | THE BACKING FOR THE TUB TO BE 6" MAX OFF THE TUB PER |
| | PAGE 6.9. |
| | |
| | 76. SPECIFICATION "A" OR "B" SHALL BE INDICATED FOR |
| | EACH UNIT AS REQUIRED ON PAGES 7.34 & 7.35. PLEASE |
| | INDICATE ON PLANS. |
| | |
| | 77. SHOW THE CLEAR FLOOR SPACE ON THE FLOOR PLANS FOR |
| | THE WATER CLOSETS IN ALL ACCESSIBLE BATHROOMS. PAGE |
| | 7.43. |
| | |
| | 78. SHT AN-7.5 DETAILS 2 AND 6 SHOWER CONTROLS LOCATION |
| | AND HEIGHT NOT INDICATED PER SECTIONS 11-4.21.3 & |
| | 11-4.21.5.--NOTE AT EACH DETAIL STATES, "FOR NUM. |
| | DIMENSIONS & SPECS. (ADA) SEE SHEET A-7.?. PLEASE |
| | CLARIFY. SECTIONS 106.1.1 & 106.1.2. |
| | |
| | 79. SHT AN-7.6 DETAIL #1 WATER CLOSET STALLS SHALL |
| | COMPLY WITH SECTION 11-4.17.3 & FIG. 11-30E. A LAV IS |
| | REQUIRED IN THE ACCESSIBLE STALL.--SHOWERS SHALL |
| | COMPLY WITH SECTION 11-4.21.2 FOR SIZE. PLEASE SHOW |
| | COMPLIANCE. |
| | |
| | 80. SHT AN-7.6 PLEASE SHOW COMPLIANCE WITH SECTIONS |
| | 11-5.16, 11-4.19, 11-4.21 & 11-4.22 WITH ALL |
| | SUBSECTIONS. FOR BATHROOMS. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE |
| | THE REVISION & REMOVE & REPLACE ANY |
| | PAGES AS NECESSARY. A TRANSMITTAL LETTER |
| | LISTING THE ORIGINAL REVIEW COMMENT NUMBER, |
| | WITH A DESCRIPTION OF THE REVISION MADE, |
| | IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND |
| | WILL HELP TO EXPEDITE YOUR PERMIT. REMOVE |
| | ALL VOID SHEETS FROM ALL PLANS AND PLACE |
| | ONE SET OF THEM LOOSELY ON TOP OF THE |
| | COLLATED PLANS TO BE REVIEWED. |
| | THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |
| | |
| | |
| | |