2008-04-28 18:13:33REVIEW #: 1ST. PLAN CHECK ONLY
 ACTION: DENIED
  
 FBC 2004 CODE FAMILY W/ 2007 SUPPLEMENTS
 FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH
  
 1. PG MN-00: THE MECHANICAL SEQUENCE OF OPERATIONS
 PARTS I, II AND III CONTAIN SEVERAL GRAMMATICAL AND
 PUNCTUATION ERRORS WHICH MAKE THE INTENT AND DESIGN OF
 THE SEQUENCE UNCLEAR. THE SEQUENCE CAN NOT BE REVIEWED
 AT THIS TIME. THE CONSTRUCTION DOCUMENTS SHALL INCLUDE
 SUFFICIENT INFORMATION AND DETAIL TO ADEQUATELY
 DESCRIBE THE ELEMENTS OF THE DESIGN NECESSARY FOR THE
 PROPER IMPLEMENTATION OF THE SMOKE CONTROL SYSTEMS.
 THESE DOCUMENTS SHALL BE ACCOMPANIED BY SUFFICIENT
 INFORMATION AND ANALYSIS TO DEMONSTRATE COMPLIANCE WITH
 THESE PROVISIONS IN ACCORDANCE WITH FBCB 513.2. PLEASE
 CLARIFY THE SEQUENCE IN A MANNER THAT CLEARLY
 DELINEATES THE DESIGN INTENT AND RESUBMIT FOR REVIEW.
 NOTE: INTERIOR EXIT STAIRWAYS ARE PRESSURIZED TO A
 MINIMUM OF 0.15 INCH OF WATER AND A MAXIMUM OF 0.35
 INCH OF WATER IN THE SHAFT RELATIVE TO THE BUILDING
 MEASURED WITH ALL STAIRWAY DOORS CLOSED UNDER MAXIMUM
 ANTICIPATED STACK PRESSURES IN ACCORDANCE WITH FBCB
 909.20.5.
  
 2. PG MN-00: THE TEST CRITERIA FOR SMOKE CONTROL NOTE
 #9, COMMISSIONING OF THE SMOKE CONTROL SYSTEM SHALL BE
 IN ACCORDANCE WITH FBCM 513.3 AND FBCB 909.18.8.
  
 3. PG MN-00: THE RATIONAL ANALYSIS DOES NOT CONTAIN ANY
 ANALYSIS. IT IS A SERIES OF STATEMENTS. A RATIONAL
 ANALYSIS SUPPORTING THE TYPES OF SMOKE CONTROL SYSTEMS
 TO BE EMPLOYED, THEIR METHODS OF OPERATION, THE SYSTEMS
 SUPPORTING THEM, AND THE METHODS OF CONSTRUCTION TO BE
 UTILIZED SHALL ACCOMPANY THE SUBMITTED CONSTRUCTION
 DOCUMENTS AND SHALL INCLUDE, BUT NOT BE LIMITED TO, THE
 ITEMS INDICATED IN SECTIONS 513.4.1 THROUGH 513.4.6 IN
 ACCORDANCE WITH FBCM 513.4. HIS SHOULD BE A SEPARATE
 REPORT SIGNED AND SEALED BY THE DESIGN PROFESSIONAL
 RESPONSIBLE FOR THE SMOKE CONTROL SYSTEM WITH
 SUFFICIENT DETAIL TO DEMONSTRATE COMPLIANCE WITH ALL
 REQUIREMENTS OF THIS SECTION.
  
 4. MN-2.01: GARAGE VENTILATION SYSTEM SEQUENCE OF
 OPERATION, AS PRINTED ON PLAN HAS PORTION WHICH WERE
 CUT OFF AND NOT PRINTED ON PLANS. THIS SECTION CAN NOT
 BE REVIEWED FOR COMPLIANCE WITH FBCM SECTION 404 AT
 THIS TIME.
 NOTE: THERE IS NO INDICATION ON PLANS, IN THE SEQUENCE
 OR IN THE VENTILATION CALCULATIONS FOR HOW CONTINUOUS
 VENTILATION IS TO BE PROVIDED. AUTOMATIC OPERATION OF
 THE SYSTEM SHALL NOT REDUCE THE VENTILATION RATE BELOW
 0.05 CFM PER SQUARE FOOT OF THE FLOOR AREA IN
 ACCORDANCE WITH FBCM 404.2.
  
 5. MN-2.01 THROUGH MN-2.04: VARIOUS EQUIPMENT AND
 APPLIANCES ARE SHOWN BEING INSTALLED IN THE PARKING
 GARAGE WITH A NOTE TO BE INSTALLED AS HIGH AS POSSIBLE.
 APPLIANCES LOCATED IN PUBLIC GARAGES OR OTHER AREAS
 FREQUENTED BY MOTOR VEHICLES, SHALL BE INSTALLED A
 MINIMUM OF 8 FEET ABOVE THE FLOOR UNLESS APPLIANCES ARE
 PROTECTED FROM MOTOR VEHICLE IMPACT AND INSTALLED IN
 ACCORDANCE WITH NFPA 88B PER FBCM 304.5. SOME EXAMPLES
 OF APPLIANCES WHICH MAY BE AFFECTED ARE SF-7 AND CU-1.
  
 6. MN-2.02 AND MN-2.03: SHOW MEANS AND LOCATION OF
 CONDENSATE DISPOSAL FOR AC-1 AND AC-2, DEMONSTRATING
 COMPLIANCE WITH FBCM 307.2.
  
 7. MN-2.03: SEVERAL DUCTS ARE SHOWN PENETRATING 1 AND 2
 HOUR WALL ASSEMBLIES WITHOUT OPENING PROTECTIVES. SHOW
 HOW THESE PENETRATIONS ARE TO BE PROTECTED IN
 ACCORDANCE WITH FBCM 607.5 AND 607.1.1.
  
 8. MN-2.03: EF-3 AND EF-4 ARE SHOWN IN AN ENCLOSURE
 WITH LOUVERS WHICH WOULD DISCHARGE EXHAUST AIR FROM THE
 PARKING GARAGE ONTO ONE OR MORE WALKWAYS. EXHAUST AIR
 SHALL NOT BE DIRECTED ONTO WALKWAYS IN ACCORDANCE WITH
 FBCM 401.5.2.
  
 9. MN-2.03: THE LOCATION OF CU-2 SERVING THE TRASH ROOM
 COULD NOT BE LOCATED ON PLANS. PLEASE SHOW LOCATION OF
 CU-2 AND ROUTING OF REFRIGERANT PIPING IN ACCORDANCE
 WITH FBCM 301.1 AND FBCB 106.1.1.
  
 10. MN-2.03 AND M-2.04: GARAGE EXHAUST FAN ENCLOSURES
 FOR EFS 3,4,5 AND 6 ARE SHOWN WITH RUSKIN ELF6375DXD
 LOUVERS (OR EQUIVALENT) IN WALL OPENINGS. IN THE NOA
 FOR THIS LOUVER, THE INSTALLATION INSTRUCTIONS CALL FOR
 THE ROOM BEHIND THE LOUVER TO BE DESIGNED TO DRAIN
 WATER PENETRATING INTO THIS ROOM AND EQUIPMENT SHALL BE
 WATER RESISTANT/WATER PROOF. PLEASE SHOW THESE ROOMS
 AND THE EQUIPMENT INSTALLED IN THEM TO BE IN COMPLIANCE
 WITH THESE REQUIREMENTS PER FBCM 304.1.
  
 11. MN-2.04: IN THE BATHROOM, MEETING ROOM AND
 GENERATOR ROOM AREAS THERE ARE MULTIPLE UNPROTECTED
 DUCT PENETRATIONS AND LOUVER OPENINGS IN FIRE
 RESISTANCE RATED WALL ASSEMBLIES. SHOW HOW THESE
 PENETRATIONS AND OPENINGS ARE TO BE PROTECTED IN
 ACCORDANCE WITH FBCM 607.5 AND 607.1.1. COORDINATE WITH
 ARCHITECTURAL AND LIFE SAFETY PLANS.
  
 12. MN-2.04: EXTERIOR LOUVER FOR EF-5 AND EF-6 IS SHOWN
 ON PLANS TO BE AN INTAKE LOUVER WHILE IT APPEARS THAT
 THIS SHOULD BE AN EXHAUST LOUVER. PLEASE CLARIFY PER
 FBCM 501.1 AND FBCB 106.1.1.
  
 13. MN-2.05 THROUGH MN-2.08: PLAN SHOWS RAIN HOODS FOR
 GARAGE EXHAUST AND INTAKE. PROVIDE DETAIL WITH PRODUCT
 APPROVAL FOR RAIN HOODS. OPENINGS SHALL BE PROTECTED
 AGAINST LOCAL WEATHER CONDITIONS IN ACCORDANCE WITH
 FBCM 401.6. MECHANICAL EQUIPMENT, APPLIANCES AND
 SUPPORTS THAT ARE EXPOSED TO WIND SHALL BE DESIGNED AND
 INSTALLED TO RESIST THE WIND PRESSURES ON THE EQUIPMENT
 AND THE SUPPORTS AS DETERMINED IN ACCORDANCE WITH FBCM
 301.13.
  
 14. MN-2.05: AHU-6 SHOWS AN 18X12 OA DUCT TIED TO THE
 44X12 RETURN. THE DUCT AT THIS AND SEVERAL OTHER
 LOCATIONS THROUGHOUT THESE PLANS HAS A SYMBOL AND AN
 ABBREVIATION ?VD? WHICH COULD NOT BE FOUND IN THE
 LEGEND ON PG M-0.00. A MOTORIZED DAMPER IS REQUIRED AT
 THIS LOCATION IN ACCORDANCE WITH FBCB 13-409.1.ABC.3.3
 AND IS CALLED FOR IN THE SMOKE CONTROL SEQUENCE ON PG
 MN-0.00.
  
 15. MN-2.05: AHU-6 ON PLAN IS DRAWING OUTSIDE AIR FROM
 THE SAME PLENUM AREA AS SF1, SF-2, SF-9 AND SF-12. ARE
 THESE FANS EQUIPPED WITH BACKDRAFT DAMPERS TO PREVENT
 COMMUNICATION WITH THE GARAGE AREA WHEN THE SUPPLY FANS
 ARE NOT RUNNING? RECIRCULATION OF AIR FROM THESE AREAS
 IS PROHIBITED IN ACCORDANCE WITH FBCM 403.2.1(1) AND
 AHSRAE 62.1-2004 SECTION 5.16.
  
 16. MN-2.05: O.A. INTAKES FOR FUTURE SPACES ARE SHOWN
 WITH BACKDRAFT DAMPERS AT BRANCHES. THESE LOCATIONS
 REQUIRE MOTORIZED DAMPERS. EACH BRANCH CALLS FOR MORE
 THAN 300 CFM AND THEREFORE DOES NOT QUALIFY FOR
 BACKDRAFT DAMPER EXCEPTION #2 IN ACCORDANCE WITH FBCB
 13-409.1.ABC.3.3.
  
 17. PG MN-2.05: ACCORDING TO LIFE SAFETY PLAN PAGE
 LSN-1.2, SUPPLY FANS 9 AND 12 AS WELL AS AHU-6 HAVE
 DUCTS PENETRATION FIRE RATED ASSEMBLIES IN MULTIPLE
 LOCATIONS. SHOW HOW THESE PENETRATIONS ARE TO BE
 PROTECTED IN ACCORDANCE WITH FBCM 607.5.
  
 18. PG MN-2.05: SUPPLY FANS 1, 2, 9 AND 12 ARE ALL
 GREATER THAN 2000 CFM. PROVIDE FAN SHUT-DOWN BY SMOKE
 DETECTOR IN ACCORDANCE WITH FBCM 606.2.1 AND 606.4.
  
 19. PG MN-2.05 AND MN-2.06: ACCORDING TO THE SMOKE
 CONTROL SEQUENCE ON PG MN-0.00, WHEN IN SMOKE CONTROL
 MODE THE 44X12 RETURN DUCT FROM AHU-6 WILL BECOME THE
 MAKE-UP AIR FOR SMOKE EXHAUST FAN SEF-1. THE OUTSIDE
 AIR DUCT FOR AHU-6, WHICH WILL BE SERVING AS THE SOURCE
 OF MAKE-UP AIR, IS ONLY 18X12 AND DESIGNED FOR 1320
 CFM. HOW WILL THIS BE ADEQUATE FOR THE 33,750 CFM BEING
 EXHAUSTED FROM THE LOBBY? THIS DESIGN NEEDS TO BE
 JUSTIFIED IN THE RATIONAL ANALYSIS IN ACCORDANCE WITH
 FBCM 513.2 AND 513.4. SEE ALSO COMMENT #14 ABOVE.
  
 20. PG MN-2.06: THE 86X20 EXHAUST DUCT IS PENETRATING
 TWO 2-HOUR RATED WALLS AS SHOWN ON PG LSN-1.2. SHOW HOW
 THESE PENETRATIONS ARE TO BE PROTECTED IN ACCORDANCE
 WITH FBCM 607.5 AND 607.2.1.
  
 21.PG MN-2.06: THE 28X18 DUCT FOR SF-11 IS
 PENETRATING A 2-HOUR RATED FLOOR ASSEMBLY. SHOW HOW
 THIS PENETRATION IS TO BE PROTECTED IN ACCORDANCE WITH
 FBCM 607.6.
  
 22. PG MN-2.06: THE 14X8 OUTSIDE AIR DUCT FOR THE
 FUTURE TENANT SPACES IS PENETRATING A 1-HOUR RATED WALL
 ASSEMBLY AS SHOWN ON PG LSN-1.2. SHOW HOW THIS
 PENETRATION IS TO BE PROTECTED IN ACCORDANCE WITH FBCM
 607.5.
  
 23. PG MN-2.06: SUPPLY FANS 3, 4, 8 AND 11 ARE ALL
 GREATER THAN 2000 CFM. PROVIDE FAN SHUT-DOWN BY SMOKE
 DETECTOR IN ACCORDANCE WITH FBCM 606.2.1 AND 606.4.
  
 24. PG MN-2.06: SUPPLY DUCT AND LOUVER FOR SF-8 IS
 PENETRATING A 2-HOUR RATED WALL AS SHOWN ON PG LSN-1.2.
 SHOW HOW THIS OPENING/PENETRATION IS TO BE PROTECTED IN
 ACCORDANCE WITH FBCM 607.5.
  
 25. PG MN-2.07: DUCT PENETRATIONS OF 1-HOUR RATED
 CORRIDOR ARE SHOWN AS HAVING FIRE DAMPERS BUT NO SMOKE
 DAMPERS. SHOW THESE PENETRATIONS TO BE PROTECTED WITH
 FIRE AND SMOKE DAMPERS IN ACCORDANCE WITH FBCM 607.5
 AND 607.5.4.
  
 26. PG MN-2.07: CU-7 IS SHOWN IN GARAGE AREA WITH
 REFRIGERANT LINES TERMINATING AT A 4X4 DUCT. AHU-7 IS
 ON THE MEZZANINE LEVEL BELOW AND ON THE OTHER SIDE OF
 THE BUILDING. SHOW THE ROUTING OF REFRIGERANT LINES
 FROM CU TO AHU. FBCM 1101.1, FBCB 106.1.1.
  
 27. PG MN-2.08: SHUTOFF DAMPER CONTROLS ARE REQUIRED
 FOR THE AHU-8 OUTSIDE AIR INTAKE IN ACCORDANCE WITH
 FBCB 13-409.1.ABC.3.3.
  
 28. PG MN-2.08: PROTECTION OF PENETRATION AT FLOOR IS
 REQUIRED FOR SF-11 DUCT IN ACCORDANCE WITH FBCM 607.6.
 SEE COMMENT #21.
  
 29. PG MN-2.17: ROOF PLAN SHOWS SF-12 USED FOR
 PRESSURIZATION OF STAIR. SF-12 IS ALSO SHOWN AS A
 GARAGE VENTILATION FAN ON PG MN-2.05. FAN SCHEDULE ON
 MN-5.01 CALLS FOR SF-12 TO BE ON SECOND LEVEL. PLEASE
 COORDINATE THIS AND ALL FAN DESIGNATIONS ON FLOOR PLANS
 WITH THE INFORMATION ON THE FAN SCHEDULE. VERIFY
 CORRECT LOCATION IDENTIFICATION ON BOTH THE FLOOR PLANS
 AND THE SCHEDULE. FBCM 304.11, FBCB 106.1.1.
  
 30. PG MN-2.17 AND MN-2.18: SERVICE ELEVATOR AND STAIR
 SHAFT VENT OPENINGS SHALL BE EQUIPPED WITH MOTORIZED
 DAMPERS IN ACCORDANCE WITH FBCB 13-409.1.ABC.3.1.
  
 31. PG MN-2.17 AND MN-2.18: STAIR PRESSURIZATION FAN
 SF-14 AND DUCTWORK SHALL BE LOCATED EXTERIOR TO THE
 BUILDING AND DIRECTLY CONNECTED TO THE SMOKEPROOF
 ENCLOSURE OR CONNECTED TO THE SMOKEPROOF ENCLOSURE BY
 DUCTWORK ENCLOSED BY 2-HOUR FIRE-RESISTANCE-RATED FIRE
 BARRIERS IN ACCORDANCE WITH FBCB 909.20.6.1(1)
  
 32. PG MN-2.17: MAIN ELEVATOR HOISTWAY VENTS SHALL OPEN
 EITHER DIRECTLY TO THE OUTER AIR OR THROUGH
 NONCOMBUSTIBLE DUCTS TO THE OUTER AIR IN ACCORDANCE
 WITH FBCB 3004.2. FLOOR PLAN CURRENTLY SHOWS THEM
 TERMINATING IN THE POOL MECHANICAL ROOM. ALSO, SUPPLY
 FAN DUCTS AND VENTILATION OPENINGS ARE PENETRATING THE
 ELEVATOR SHAFTS WITHIN THE BUILDING. THESE PENETRATIONS
 SHALL BE PROTECTED IN ACCORDANCE WITH FBCM 607.5.5.1.
 COMBINATION FIRE/SMOKE DAMPERS MAY BE USED IF UNDER THE
 CONTROL OF THE SMOKE CONTROL SYSTEM IN ACCORDANCE WITH
 FBCM 513.5.2.
  
 33. PG MN-2.17: NO MEANS OF VENTILATION OR AIR
 CONDITIONING FOR THE ELEVATOR MACHINE ROOMS IS SHOWN ON
 PLANS. ELEVATOR MACHINE ROOMS THAT CONTAIN SOLID-STATE
 EQUIPMENT FOR ELEVATOR OPERATION SHALL BE PROVIDED WITH
 AN INDEPENDENT VENTILATION OR AIR-CONDITIONING SYSTEM
 TO PROTECT AGAINST THE OVERHEATING OF THE ELECTRICAL
 EQUIPMENT. THE SYSTEM SHALL BE CAPABLE OF MAINTAINING
 TEMPERATURES WITHIN THE RANGE ESTABLISHED FOR THE
 ELEVATOR EQUIPMENT IN ACCORDANCE WITH FBCB 3006.2.
 WHERE STANDBY POWER IS CONNECTED TO ELEVATORS, THE
 MACHINE ROOM VENTILATION OR AIR CONDITIONING SHALL BE
 CONNECTED TO THE STANDBY POWER SOURCE IN ACCORDANCE
 WITH FBCB 3003.1.4.
  
 34. PG MN-2.17: THE ELEVATOR MACHINE ROOM SERVING A
 PRESSURIZED ELEVATOR HOISTWAY SHALL BE PRESSURIZED UPON
 ACTIVATION OF A HEAT OR SMOKE DETECTOR LOCATED IN THE
 ELEVATOR MACHINE ROOM IN ACCORDANCE WITH FBCB 3006.3.
  
  
 35. PG MN-2.18: RTU-2 DUCT ON ROOF IS SHOWN AS 28X36
 BUT ON RISER DIAGRAM ON PG MN-4.01 THE DUCT IS SHOWN AS
 28X16. COORDINATE PLANS AND DUCT SIZES. FBCM 603.1,
 FBCB 106.1.1.
  
 36. PG MN-3.0 THROUGH MN-3.6: FLOOR PLANS CALL FOR A
 VPAWP1-8 WALL PLENUM WITH A MIAMI-DADE APPROVED LOUVER.
 PROVIDE DETAIL SHOWING HOW AN APPROVED LOUVER IS TO BE
 INSTALLED IN ACCORDANCE WITH ITS APPROVED INSTALLATION
 INSTRUCTIONS WITH A WALL LOUVER ALSO INSTALLED IN THE
 WALL. EQUIPMENT AND APPLIANCES SHALL BE INSTALLED AS
 REQUIRED BY THE TERMS OF THEIR APPROVAL, IN ACCORDANCE
 WITH THE CONDITIONS OF THE LISTING, THE MANUFACTURER?S
 INSTALLATION INSTRUCTIONS AND THIS CODE PER FBCM 304.1
 AND THE CONDITIONS OF THE MIAMI-DADE APPROVAL. PROVIDE
 ALL RELATED PRODUCT APPROVALS AND INSTALLATION
 INSTRUCTIONS.
  
 37. PG MN-3.0 THROUGH MN-3.6: EACH UNIT FLOOR PLAN
 SHOWS A WASHER/DRYER, BUT NO PROVISIONS FOR DRYER
 EXHAUST ARE SHOWN ON PLANS. SHOW MEANS AND LOCATION OF
 DRYER EXHAUST WITH DUCT SIZE, TYPE OF MATERIAL AND
 TERMINATION LOCATION, DEMONSTRATING COMPLIANCE WITH
 FBCM 504.1 THROUGH 504.6. ADDITIONAL COMMENTS RELATED
 TO DRYER EXHAUST ARE LIKELY IN SUBSEQUENT REVIEW AS NO
 INFORMATION IS CURRENTLY PROVIDED.
  
 38. PG MN-3.0: IN UNIT C, THE 6X4 SUPPLY DIFFUSER IN
 THE FOYER IS NOT BEING FED BY ANY DUCT. SHOW HOW THIS
 AIR IS TO BE SUPPLIED IN ACCORDANCE WITH FBCM 603.1.
  
 39. PG MN-3.0: IN UNIT B, SUPPLY DIFFUSER IN LIVING
 ROOM IS MISSING SIZE AND CFM DESIGNATION. PROVIDE
 MISSING INFORMATION. FBCM 603.1.
  
 40. PG MN-3.0 THROUGH MN-3.6: FLOOR PLAN CALLS FOR
 RETURN AIR GRILL WITH ACCESS PANEL AT ALL A/C UNITS.
 PROVIDE DETAIL ON PLANS AND MANUFACTURER?S INSTALLATION
 INSTRUCTIONS SHOWING THE AIR CONDITIONING APPLIANCES
 ARE ACCESSIBLE FOR SERVICE AND REPLACEMENT WITHOUT
 REMOVING ELEMENTS OF PERMANENT CONSTRUCTION IN
 ACCORDANCE WITH FBCM 306.1.
  
 41. PG MN-3.0: IN UNIT D, SUPPLY DIFFUSER IN POWDER
 ROOM IS MISSING SIZE AND CFM DESIGNATION. PROVIDE
 MISSING INFORMATION. FBCM 603.1.
  
 42. PG MN-3.0: IN UNIT C, THE 10X4 TRANSFER GRILL IN
 MASTER SITTING ROOM IS TOO SMALL TO MEET THE BALANCED
 RETURN EXCEPTION UNDER FBCM 601.4(2). SHOW HOW BALANCED
 RETURN IS TO BE ACHIEVED IN THIS AREA IN ACCORDANCE
 WITH THIS SECTION.
  
 43. PG MN-3.1: IN UNIT F, AHU-2 CALLS FOR A TOTAL OF
 500 CFM BUT FLOOR PLAN CALLS FOR 550 CFM. PLEASE
 COORDINATE FLOOR PLANS AND EQUIPMENT SCHEDULES. FBCM
 603.1.
  
 44. PG MN-3.1: IN UNIT F, THE 20X6 TRANSFER GRILL
 BETWEEN BEDROOM AND DINING ROOM IS TOO SMALL TO MEET
 THE BALANCED RETURN EXCEPTION UNDER FBCM 601.4(2). SHOW
 HOW BALANCED RETURN IS TO BE ACHIEVED IN THIS AREA IN
 ACCORDANCE WITH THIS SECTION.
  
 45. PG MN-3.2: IN UNIT H, NO PROVISIONS FOR BALANCED
 RETURN ARE SHOWN ON PLANS FOR AHU-2. SHOW HOW BALANCED
 RETURN IS TO BE ACHIEVED IN THIS AREA IN ACCORDANCE
 WITH FBCM 601.4.
  
 46. PG MN-3.2: IN UNIT J, AHU-3 CALLS FOR 780 CFM WHILE
 FLOOR PLAN CALLS FOR 890 CFM. IT APPEARS THAT THE 4
 INCH DROP IN THE BATHROOM IS MISLABELED AT 150 CFM
 RATHER THAN THE USUAL 40 CFM. PLEASE VERIFY DESIRED
 AIRFLOWS AND COORDINATE FLOOR PLAN WITH EQUIPMENT
 SCHEDULE. FBCM 603.3.
  
 47. PG MN-3.3: IN UNIT M, AHU-2 CALLS FOR A TOTAL OF
 500 CFM BUT FLOOR PLAN CALLS FOR 550 CFM. PLEASE
 COORDINATE FLOOR PLANS AND EQUIPMENT SCHEDULES. FBCM
 603.1.
  
 48. PG MN-3.4: IN UNIT Q, AHU-6 IS SHOWN BUT AHU-6 ON
 SCHEDULE (MN-5.01) IS SHOWN AS SERVING THE LOBBY WITH
 6000 CFM. PLEASE COORDINATE FLOOR PLANS WITH A/C
 SCHEDULE. FBCM 603.1, FBCB 106.1.1.
  
 49. PG MN-3.4 AND MN-3.5: AHU-5 IS SHOWN AS A
 HORIZONTAL UNIT ABOVE THE CEILING. SHOW HOW THE AIR
 HANDLERS WILL BE ACCESSIBLE FOR SERVICE AND REPLACEMENT
 WITHOUT REMOVING ELEMENTS OF PERMANENT CONSTRUCTION IN
 ACCORDANCE WITH FBCM 306.1.
  
 50. PG MN-3.4 AND MN-3.5 AND COMMON AREAS: LOCATION OF
 REMOTE CONDENSING UNITS FOR SPLIT SYSTEMS AND ROUTING
 OF REFRIGERANT LINES IN MOST CASES COULD NOT BE FOUND
 ON PLANS. SHOW LOCATION OF ALL APPLIANCES AND PIPING.
 FBCM 303.1, FBCB 106.1.1.
  
 51. PG MN-3.4: IN UNIT P, AHU-4 IS A VERTICAL UNIT IN A
 PLENUM CLOSET. ARCHITECTURAL FLOOR PLAN CALLS FOR DOOR
 TYPE 19 AT THIS LOCATION. DOOR SCHEDULE ON AN-8.0 SHOWS
 THIS TO BE A WOOD DOOR. PLENUM ENCLOSURES SHALL BE
 CONSTRUCTED OF MATERIALS PERMITTED FOR THE TYPE OF
 CONSTRUCTION CLASSIFICATION OF THE BUILDING IN
 ACCORDANCE WITH FBCM 602.2. AS THIS BUILDING IS OF TYPE
 IA CONSTRUCTION, NO PORTION OF THE PLENUM MAY BE
 CONSTRUCTED OF WOOD. ALSO, MATERIALS EXPOSED WITHIN
 PLENUMS SHALL BE NONCOMBUSTIBLE OR SHALL HAVE A FLAME
 SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE-DEVELOPED
 INDEX OF NOT MORE THAN 50 WHEN TESTED IN ACCORDANCE
 WITH ASTM E 84 PER FBCM 606.2.2.1. SHOW A CLOSET DOOR
 ON ARCHITECTURAL PLANS WHICH IS IN COMPLIANCE WITH
 THESE SECTIONS.
  
 52. PG MN-3.2 UNIT H AND ALL SIMILARLY CONFIGURED
 APARTMENTS: IS EF-1 EXHAUST DUCT PASSING THROUGH A
 RETURN PLENUM? EXHAUST DUCTS UNDER POSITIVE PRESSURE
 SHALL NOT EXTEND INTO OR PASS THROUGH DUCTS OR PLENUMS
 IN ACCORDANCE WITH FBCM 601.3.
  
 53. PG MN-3.5: IN UNIT T, PROVIDE BALANCED RETURN FROM
 LIVING AREA TO AHU-2 IN ACCORDANCE WITH FBCM 601.4.
  
 54. PG MN-3.5: IN UNIT V, FLOOR PLAN IS MISSING AHU
 DESIGNATIONS. PROVIDE MISSING INFORMATION. FBCM 603.1,
 FBCB 106.1.1.
  
 55. PG MN-3.6: IN UNIT Z, DROP IN THE CLOSET IS MISSING
 GRILL SIZE AND CFM DESIGNATIONS. PROVIDE MISSING
 INFORMATION. FBCM 603.1.
  
 56. PG MN-4.02 AND MN-4.03: SEE COMMENTS 29 THROUGH 34
 REGARDING STAIR AND ELEVATOR SHAFT VENTILATION.
  
 57. PG MN-5.01: REVIEW OF ENERGY CALCULATIONS AND
 COOLING LOAD CALCULATIONS HAVE BEEN MOVED TO THE END OF
 THE REVIEW COMMENTS. PLEASE SEE COMMENTS STARTING AT
 #71:
  
 58. PG MN-5.01: FAN SCHEDULE, SF-1 IS SHOWN ON SCHEDULE
 AS PART OF THE SMOKE EVACUATION SYSTEM FOR THE LOBBY.
 THIS FAN IS NOT SHOWN AS PART OF THE SMOKE EVACUATION
 SYSTEM ON FLOOR PLANS. PLEASE COORDINATE FLOOR PLANS
 AND EQUIPMENT SCHEDULES. FBCM 301.1, FBCB 106.1.1.
  
 59. PG MN-5.01: PACKAGED DUCTLESS SCHEDULE, BOTH CU-1
 AND CU-2 ARE SHOWN TO HAVE A UNIT DESIGNATION OF CU-1.
 APPLIANCES SERVING DIFFERENT AREAS OF A BUILDING OTHER
 THAN WHERE THEY ARE INSTALLED SHALL BE PERMANENTLY
 MARKED IN AN APPROVED MANNER THAT UNIQUELY IDENTIFIES
 THE APPLIANCE AND THE AREA IT SERVES IN ACCORDANCE WITH
 FBCM 304.11. PLEASE CORRECT UNIT DESIGNATIONS.
  
 60. PG MN-5.02: AHU DETAIL, NOTE 1 CALLS FOR CPVC PIPE
 IN PLENUM CLOSET.
 A) WHAT SIZE PIPE IS TO BE USED? CONDENSATE WASTE AND
 DRAIN LINE SIZE SHALL BE NOT LESS THAN ? INCH INTERNAL
 DIAMETER IN ACCORDANCE WITH FBCM 307.2.2.
 B) CPVC MAY OR MAY NOT MEET THE FLAME SPREAD ? SMOKE
 DEVELOPMENT RATING OF 25/50 AS REQUIRED BY FBCM
 606.2.2.1 DEPENDING ON SIZE OF PIPE AND WHETHER OR NOT
 IT IS CHARGED WITH WATER (UNDER PRESSURE). EXCEPTION
 NUMBER 5 OF THIS SECTION REQUIRES COMBUSTIBLE MATERIALS
 TO BE ENCLOSED IN APPROVED GYPSUM BOARD ASSEMBLIES OR
 ENCLOSED IN MATERIALS LISTED AND LABELED FOR SUCH
 APPLICATION. ARMAFLEX IS NOT LISTED AND LABELED FOR
 ENCLOSING COMBUSTIBLE MATERIALS IN PLENUMS. SHOW HOW
 THE REQUIREMENTS OF THIS SECTION ARE TO BE MET.
  
 61. PG MN-5.02: DUCT CONNECTION AND HANGER DETAILS, THE
 SUPPORT SPACING TABLE APPEARS TO APPLY TO SHEET METAL
 DUCTS, BUT THAT IS NOT INDICATED ON PLANS. THE SPACING
 SHOWN ON THE TABLE IS NOT ADEQUATE FOR THE SPACING
 REQUIREMENTS OF FLEX DUCTS. SHOW SUPPORT SPACING FOR
 FLEXIBLE DUCTS WHICH ARE IN COMPLIANCE WITH FBCM
 603.5.6.6.
  
 62. PG MN-5.02: CONDENSATE DRAIN TRAP DETAIL CALLS FOR
 REPLACEMENT OF EXISTING CONDENSATE TRAPS. THERE SHOULD
 BE NO EXISTING TRAPS AS THIS IS NEW CONSTRUCTION. WILL
 USED MATERIALS BE INSTALLED? SEE FBCB 301.4.4.
  
 63. PG MN-5.02 AND MN-5.04: FIRE DAMPER DETAIL AND
 FIRE/SMOKE DAMPER DETAIL, THE DETAILS SHOWN ON PLANS
 LIKELY DO NOT CORRELATE WITH FIRE DAMPER MANUFACTURER?S
 INSTALLATION INSTRUCTIONS. FIRE DAMPERS, SMOKE DAMPERS,
 COMBINATION FIRE/SMOKE DAMPERS AND CEILING DAMPERS
 LOCATED WITHIN AIR DISTRIBUTION AND SMOKE CONTROL
 SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE
 REQUIREMENTS OF THE MANUFACTURER?S INSTALLATION
 INSTRUCTIONS AND LISTING PER FBCM 607.2. COORDINATE
 DETAILS ON PLANS WITH MANUFACTURER?S INSTRUCTIONS.
  
 64. PG MN-5.02: CONDENSING UNIT ROOF DETAIL, NO
 INFORMATION OR DETAIL COULD BE FOUND IN STRUCTURAL
 PLANS FOR CONSTRUCTION AND FASTENING OF RACK. PROVIDE
 WIND LOAD CALCULATIONS AND STRUCTURAL DETAIL FOR
 CONSTRUCTION OF ROOF RACK FOR CONDENSING UNIT FOR
 BUILDING PLAN REVIEW IN ACCORDANCE WITH FBCM 301.13 AND
 FBCB 1609.1.
  
 65. PG MN-5.02: CONDENSING UNIT ROOF DETAIL SHOWS
 CONDENSING UNITS SECURED TO RACK WITH CABLES. SHOW HOW
 THESE CABLES ARE TO BE USED TO SECURE CONDENSERS
 WITHOUT INTERFERING WITH THE SERVICE ACCESSIBILITY OF
 THE UNITS. CLEARANCES AROUND APPLIANCES TO ELEMENTS OF
 PERMANENT CONSTRUCTION, INCLUDING OTHER INSTALLED
 EQUIPMENT AND APPLIANCES, SHALL BE SUFFICIENT TO ALLOW
 INSPECTIONS, SERVICE, REPAIR OR REPLACEMENT WITHOUT
 REMOVING SUCH ELEMENTS OF PERMANENT CONSTRUCTION IN
 ACCORDANCE WITH FBCM 306.1.
  
 66. PG MN-5.03: HORIZONTAL AHU DETAIL, PROVIDE
 SECONDARY OR AUXILIARY DRAIN PROTECTION IN ACCORDANCE
 WITH FBCM 307.2.3.
  
 67. PG MN-5.03: ROOFTOP PACKAGE UNITS, PROVIDE
 MANUFACTURER?S TEST DATA SHOWING THESE UNITS ARE
 DESIGNED TO WITHSTAND ANTICIPATED WIND PRESSURES. NOT
 JUST THE ATTACHMENTS, BUT THE UNITS THEMSELVES SHALL BE
 DESIGNED TO WITHSTAND WIND PRESSURES IN ACCORDANCE WITH
 FBCM 301.13 AND FBCB 1609.1.
  
 67. PG MN-5.03: ROOFTOP PACKAGE UNITS, THE ATTACHMENT
 DETAIL IS NOT LEGIBLE AS IT APPEARS THAT CERTAIN LAYERS
 DO NOT LINE UP IN THE DRAWING. PLEASE CORRECT. ALSO,
 PLEASE SEE COMMENT # 65 REGARDING SUPPLEMENTAL
 RESTRAINTS AND SERVICE ACCESS FOR THE UNITS.
  
 68. PG MN-5.05: OUTSIDE AIR CALCULATIONS, PLEASE
 REFERENCE ASHRAE 62.1-2004. ADDENDUM N AS SHOWN ON
 PLANS IS NOT THE CURRENT ADOPTED STANDARD ACCORDING TO
 FBCM CHAPTER 15.
  
 69. PG MN-5.05: OUTSIDE AIR CALCULATIONS, PLEASE
 PROVIDE CALCULATIONS SHOWING APARTMENT UNITS HAVING
 ADEQUATE NATURAL VENTILATION IN ACCORDANCE WITH FBCM
 SECTION 402 SINCE MECHANICAL VENTILATION FOR THE
 APARTMENTS IS NOT PROVIDED.
  
 70. NO INFORMATION COULD BE FOUND ON PLANS REGARDING
 THE EMERGENCY GENERATOR. SHOW MEANS AND LOCATION OF
 FUEL STORAGE TO BE IN COMPLIANCE WITH FBCM 915.1, 915.2
 AND NFPA 37-02. SHOW MEANS OF VENTILATION AND EXHAUST
 TO BE IN COMPLIANCE WITH FBCM 401.5, 401.6 AND NFPA
 110-02 SECTIONS 7.7.1 THROUGH 7.7.8.
  
 71. ENERGY CALCULATIONS: THE VERSION OF ENERGY
 CALCULATIONS WHICH WERE SUBMITTED IS NOT THE VERSION
 ADOPTED UNDER THE CURRENT EDITION OF THE FLORIDA
 BUILDING CODE. AN ACCURATELY COMPLETED FORM 400A-04R
 (GENERATED BY THE FLA/COM-2004 COMPUTER PROGRAM,
 VERSION 2.5) DEMONSTRATING THAT CODE COMPLIANCE HAS
 BEEN ACHIEVED SHALL BE SUBMITTED TO THE BUILDING
 OFFICIAL FOR METHOD A COMPLIANCE IN ACCORDANCE WITH
 FBCB 13-400.3.A. ALSO, THE FRONT PAGE INDICATES THIS IS
 A TWO STORY BUILDING WITH A MAX TONNAGE OF 3. PLEASE
 CORRECT AS THESE ARE NOT ACCURATE REPRESENTATIONS.
  
 72. ENERGY CALCULATIONS: THERE ARE MANY DISCREPENCISE
 BETWEEN THE INFORMATION SHOWN IN THE INPUT DATA REPORT
 (IDR) AND THE CONDITIONS SHOWN ON THE PLANS.
 EXAMPLE: EVERY ZONE IS SHOWN IN THE IDR AS HAVING A
 DEPTH OF 100 FEET. THIS IS CLEARLY NOT THE CASE ON THE
 PLANS. ALSO, THE LOBBY IS SHOWN AS HAVING A HEIGHT OF 8
 FEET. THIS IS ALSO NOT CORRECT AS THE LOBBY HEIGHT GOES
 FROM THE GROUND FLOOR THROUGH THE MEZZANINE.
 EXAMPLE: THE IDR SHOWS THE AC IN THE LOBBY-MEZZANINE TO
 BE <65,000 BTU/H OR 18,000 BTU/H BUT AHU-6 ON PLAN IS
 SHOWN AS 180,000 BTU/H OR 15 TONS. AN EFFICIENCY RATING
 OF 13 SEER WOULD BE INAPPROPRIATE FOR A UNIT OF THAT
 SIZE.
 EXAMPLE: THE ZONES AS DESCRIBED IN THE IDR ARE NOT
 CORRECTLY SEPARATED BASED ON THE WAY ZONES ARE REQUIRED
 TO BE SEPARATED IN ACCORDANCE WITH FBCB
 13-407.1.ABC.2.4.3. THERE ARE ZONES WHICH COVER MORE
 THAN ONE FLOOR AND ZONES WHICH COVER MORE THAN 25,000
 SQUARE FEET. BOTH OF THESE CONDITIONS ARE PROHIBITED
 UNDER THIS SECTION.
  
 73. THESE ARE EXAMPLES OF DISCREPANCIES WHICH HAVE BEEN
 IDENTIFIED IN THE ENERGY CALCULATIONS. THEY ARE NOT
 INTENDED TO BE AN EXHAUSTIVE LIST OF ALL PROBLEMS OR
 INACCURACIES CONTAINED WITHIN. IT IS THE RESPONSIBILITY
 OF THE DESIGN PROFESSIONAL TO PREPARE AND SUBMIT AN
 ACCURATELY COMPLETED ENERGY CODE COMPLIANCE FORM.
 PLEASE TAKE THE TIME TO VERIFY ALL DATA INCLUDED IN THE
 IDR AS IT WILL BE REVIEWED AND COMPARED TO THE
 SUBMITTED PLANS.
  
 74. DUE TO THE INACCURATE NATURE OF THE ENERGY CODE
 COMPLIANCE FORM, THE COOLING LOAD CALCULATIONS CAN NOT
 BE REVIEWED AT THIS TIME. PLEASE VERIFY ANY CHANGES
 MADE TO THE ENERGY CODE CALCULATIONS AND THE PLANS ARE
 INCORPORATED INTO THE COOLING LOAD CALCULATIONS AND
 RESUBMIT IN ACCORDANCE WITH FBCB 13-407.1.ABC.1.
  
 NOTE: DUE TO THE AREAS OF INFORMATION WHICH IS LACKING
 ON THE PLANS, A THOROUGH REVIEW CANNOT BE COMPLETED AT
 THIS TIME. IT IS LIKELY THAT ADDITIONAL NEW COMMENTS
 WILL BE GENERATED DURING SUBSEQUENT REVIEWS ONCE
 MISSING INFORMATION IS PROVIDED.
  
 NOTE: PLEASE RESPOND TO EACH COMMENT IN WRITING WITH
 INDICATION AS TO HOW THE COMMENT WAS ADDRESSED AND
 WHERE THE RELEVANT INFORMATION CAN BE LOCATED. ALSO,
 PLEASE RETURN ONE SET OF OLD/VOIDED PLANS TO ASSIST IN
 SUBSEQUENT REVIEWS.
  
 NOTE: ALL PERMITS WHICH ARE ISSUED AFTER JULY 1, 2008
 ARE SUBJECT TO NEW STATE REQUIREMENTS FOR CARBON
 MONOXIDE SENSORS IN EVERY SLEEPING ROOM WHEN FUEL FIRED
 APPLIANCES OR AN ATTACHED GARAGE IS PRESENT.
  
 IF YOU HAVE ANY QUESTIONS PLEASE CONTACT:
 RONALD J. REGUEIRO
 561.805.6719
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved