| 2008-04-28 18:13:33 | REVIEW #: 1ST. PLAN CHECK ONLY |
| | ACTION: DENIED |
| | |
| | FBC 2004 CODE FAMILY W/ 2007 SUPPLEMENTS |
| | FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| | |
| | 1. PG MN-00: THE MECHANICAL SEQUENCE OF OPERATIONS |
| | PARTS I, II AND III CONTAIN SEVERAL GRAMMATICAL AND |
| | PUNCTUATION ERRORS WHICH MAKE THE INTENT AND DESIGN OF |
| | THE SEQUENCE UNCLEAR. THE SEQUENCE CAN NOT BE REVIEWED |
| | AT THIS TIME. THE CONSTRUCTION DOCUMENTS SHALL INCLUDE |
| | SUFFICIENT INFORMATION AND DETAIL TO ADEQUATELY |
| | DESCRIBE THE ELEMENTS OF THE DESIGN NECESSARY FOR THE |
| | PROPER IMPLEMENTATION OF THE SMOKE CONTROL SYSTEMS. |
| | THESE DOCUMENTS SHALL BE ACCOMPANIED BY SUFFICIENT |
| | INFORMATION AND ANALYSIS TO DEMONSTRATE COMPLIANCE WITH |
| | THESE PROVISIONS IN ACCORDANCE WITH FBCB 513.2. PLEASE |
| | CLARIFY THE SEQUENCE IN A MANNER THAT CLEARLY |
| | DELINEATES THE DESIGN INTENT AND RESUBMIT FOR REVIEW. |
| | NOTE: INTERIOR EXIT STAIRWAYS ARE PRESSURIZED TO A |
| | MINIMUM OF 0.15 INCH OF WATER AND A MAXIMUM OF 0.35 |
| | INCH OF WATER IN THE SHAFT RELATIVE TO THE BUILDING |
| | MEASURED WITH ALL STAIRWAY DOORS CLOSED UNDER MAXIMUM |
| | ANTICIPATED STACK PRESSURES IN ACCORDANCE WITH FBCB |
| | 909.20.5. |
| | |
| | 2. PG MN-00: THE TEST CRITERIA FOR SMOKE CONTROL NOTE |
| | #9, COMMISSIONING OF THE SMOKE CONTROL SYSTEM SHALL BE |
| | IN ACCORDANCE WITH FBCM 513.3 AND FBCB 909.18.8. |
| | |
| | 3. PG MN-00: THE RATIONAL ANALYSIS DOES NOT CONTAIN ANY |
| | ANALYSIS. IT IS A SERIES OF STATEMENTS. A RATIONAL |
| | ANALYSIS SUPPORTING THE TYPES OF SMOKE CONTROL SYSTEMS |
| | TO BE EMPLOYED, THEIR METHODS OF OPERATION, THE SYSTEMS |
| | SUPPORTING THEM, AND THE METHODS OF CONSTRUCTION TO BE |
| | UTILIZED SHALL ACCOMPANY THE SUBMITTED CONSTRUCTION |
| | DOCUMENTS AND SHALL INCLUDE, BUT NOT BE LIMITED TO, THE |
| | ITEMS INDICATED IN SECTIONS 513.4.1 THROUGH 513.4.6 IN |
| | ACCORDANCE WITH FBCM 513.4. HIS SHOULD BE A SEPARATE |
| | REPORT SIGNED AND SEALED BY THE DESIGN PROFESSIONAL |
| | RESPONSIBLE FOR THE SMOKE CONTROL SYSTEM WITH |
| | SUFFICIENT DETAIL TO DEMONSTRATE COMPLIANCE WITH ALL |
| | REQUIREMENTS OF THIS SECTION. |
| | |
| | 4. MN-2.01: GARAGE VENTILATION SYSTEM SEQUENCE OF |
| | OPERATION, AS PRINTED ON PLAN HAS PORTION WHICH WERE |
| | CUT OFF AND NOT PRINTED ON PLANS. THIS SECTION CAN NOT |
| | BE REVIEWED FOR COMPLIANCE WITH FBCM SECTION 404 AT |
| | THIS TIME. |
| | NOTE: THERE IS NO INDICATION ON PLANS, IN THE SEQUENCE |
| | OR IN THE VENTILATION CALCULATIONS FOR HOW CONTINUOUS |
| | VENTILATION IS TO BE PROVIDED. AUTOMATIC OPERATION OF |
| | THE SYSTEM SHALL NOT REDUCE THE VENTILATION RATE BELOW |
| | 0.05 CFM PER SQUARE FOOT OF THE FLOOR AREA IN |
| | ACCORDANCE WITH FBCM 404.2. |
| | |
| | 5. MN-2.01 THROUGH MN-2.04: VARIOUS EQUIPMENT AND |
| | APPLIANCES ARE SHOWN BEING INSTALLED IN THE PARKING |
| | GARAGE WITH A NOTE TO BE INSTALLED AS HIGH AS POSSIBLE. |
| | APPLIANCES LOCATED IN PUBLIC GARAGES OR OTHER AREAS |
| | FREQUENTED BY MOTOR VEHICLES, SHALL BE INSTALLED A |
| | MINIMUM OF 8 FEET ABOVE THE FLOOR UNLESS APPLIANCES ARE |
| | PROTECTED FROM MOTOR VEHICLE IMPACT AND INSTALLED IN |
| | ACCORDANCE WITH NFPA 88B PER FBCM 304.5. SOME EXAMPLES |
| | OF APPLIANCES WHICH MAY BE AFFECTED ARE SF-7 AND CU-1. |
| | |
| | 6. MN-2.02 AND MN-2.03: SHOW MEANS AND LOCATION OF |
| | CONDENSATE DISPOSAL FOR AC-1 AND AC-2, DEMONSTRATING |
| | COMPLIANCE WITH FBCM 307.2. |
| | |
| | 7. MN-2.03: SEVERAL DUCTS ARE SHOWN PENETRATING 1 AND 2 |
| | HOUR WALL ASSEMBLIES WITHOUT OPENING PROTECTIVES. SHOW |
| | HOW THESE PENETRATIONS ARE TO BE PROTECTED IN |
| | ACCORDANCE WITH FBCM 607.5 AND 607.1.1. |
| | |
| | 8. MN-2.03: EF-3 AND EF-4 ARE SHOWN IN AN ENCLOSURE |
| | WITH LOUVERS WHICH WOULD DISCHARGE EXHAUST AIR FROM THE |
| | PARKING GARAGE ONTO ONE OR MORE WALKWAYS. EXHAUST AIR |
| | SHALL NOT BE DIRECTED ONTO WALKWAYS IN ACCORDANCE WITH |
| | FBCM 401.5.2. |
| | |
| | 9. MN-2.03: THE LOCATION OF CU-2 SERVING THE TRASH ROOM |
| | COULD NOT BE LOCATED ON PLANS. PLEASE SHOW LOCATION OF |
| | CU-2 AND ROUTING OF REFRIGERANT PIPING IN ACCORDANCE |
| | WITH FBCM 301.1 AND FBCB 106.1.1. |
| | |
| | 10. MN-2.03 AND M-2.04: GARAGE EXHAUST FAN ENCLOSURES |
| | FOR EFS 3,4,5 AND 6 ARE SHOWN WITH RUSKIN ELF6375DXD |
| | LOUVERS (OR EQUIVALENT) IN WALL OPENINGS. IN THE NOA |
| | FOR THIS LOUVER, THE INSTALLATION INSTRUCTIONS CALL FOR |
| | THE ROOM BEHIND THE LOUVER TO BE DESIGNED TO DRAIN |
| | WATER PENETRATING INTO THIS ROOM AND EQUIPMENT SHALL BE |
| | WATER RESISTANT/WATER PROOF. PLEASE SHOW THESE ROOMS |
| | AND THE EQUIPMENT INSTALLED IN THEM TO BE IN COMPLIANCE |
| | WITH THESE REQUIREMENTS PER FBCM 304.1. |
| | |
| | 11. MN-2.04: IN THE BATHROOM, MEETING ROOM AND |
| | GENERATOR ROOM AREAS THERE ARE MULTIPLE UNPROTECTED |
| | DUCT PENETRATIONS AND LOUVER OPENINGS IN FIRE |
| | RESISTANCE RATED WALL ASSEMBLIES. SHOW HOW THESE |
| | PENETRATIONS AND OPENINGS ARE TO BE PROTECTED IN |
| | ACCORDANCE WITH FBCM 607.5 AND 607.1.1. COORDINATE WITH |
| | ARCHITECTURAL AND LIFE SAFETY PLANS. |
| | |
| | 12. MN-2.04: EXTERIOR LOUVER FOR EF-5 AND EF-6 IS SHOWN |
| | ON PLANS TO BE AN INTAKE LOUVER WHILE IT APPEARS THAT |
| | THIS SHOULD BE AN EXHAUST LOUVER. PLEASE CLARIFY PER |
| | FBCM 501.1 AND FBCB 106.1.1. |
| | |
| | 13. MN-2.05 THROUGH MN-2.08: PLAN SHOWS RAIN HOODS FOR |
| | GARAGE EXHAUST AND INTAKE. PROVIDE DETAIL WITH PRODUCT |
| | APPROVAL FOR RAIN HOODS. OPENINGS SHALL BE PROTECTED |
| | AGAINST LOCAL WEATHER CONDITIONS IN ACCORDANCE WITH |
| | FBCM 401.6. MECHANICAL EQUIPMENT, APPLIANCES AND |
| | SUPPORTS THAT ARE EXPOSED TO WIND SHALL BE DESIGNED AND |
| | INSTALLED TO RESIST THE WIND PRESSURES ON THE EQUIPMENT |
| | AND THE SUPPORTS AS DETERMINED IN ACCORDANCE WITH FBCM |
| | 301.13. |
| | |
| | 14. MN-2.05: AHU-6 SHOWS AN 18X12 OA DUCT TIED TO THE |
| | 44X12 RETURN. THE DUCT AT THIS AND SEVERAL OTHER |
| | LOCATIONS THROUGHOUT THESE PLANS HAS A SYMBOL AND AN |
| | ABBREVIATION ?VD? WHICH COULD NOT BE FOUND IN THE |
| | LEGEND ON PG M-0.00. A MOTORIZED DAMPER IS REQUIRED AT |
| | THIS LOCATION IN ACCORDANCE WITH FBCB 13-409.1.ABC.3.3 |
| | AND IS CALLED FOR IN THE SMOKE CONTROL SEQUENCE ON PG |
| | MN-0.00. |
| | |
| | 15. MN-2.05: AHU-6 ON PLAN IS DRAWING OUTSIDE AIR FROM |
| | THE SAME PLENUM AREA AS SF1, SF-2, SF-9 AND SF-12. ARE |
| | THESE FANS EQUIPPED WITH BACKDRAFT DAMPERS TO PREVENT |
| | COMMUNICATION WITH THE GARAGE AREA WHEN THE SUPPLY FANS |
| | ARE NOT RUNNING? RECIRCULATION OF AIR FROM THESE AREAS |
| | IS PROHIBITED IN ACCORDANCE WITH FBCM 403.2.1(1) AND |
| | AHSRAE 62.1-2004 SECTION 5.16. |
| | |
| | 16. MN-2.05: O.A. INTAKES FOR FUTURE SPACES ARE SHOWN |
| | WITH BACKDRAFT DAMPERS AT BRANCHES. THESE LOCATIONS |
| | REQUIRE MOTORIZED DAMPERS. EACH BRANCH CALLS FOR MORE |
| | THAN 300 CFM AND THEREFORE DOES NOT QUALIFY FOR |
| | BACKDRAFT DAMPER EXCEPTION #2 IN ACCORDANCE WITH FBCB |
| | 13-409.1.ABC.3.3. |
| | |
| | 17. PG MN-2.05: ACCORDING TO LIFE SAFETY PLAN PAGE |
| | LSN-1.2, SUPPLY FANS 9 AND 12 AS WELL AS AHU-6 HAVE |
| | DUCTS PENETRATION FIRE RATED ASSEMBLIES IN MULTIPLE |
| | LOCATIONS. SHOW HOW THESE PENETRATIONS ARE TO BE |
| | PROTECTED IN ACCORDANCE WITH FBCM 607.5. |
| | |
| | 18. PG MN-2.05: SUPPLY FANS 1, 2, 9 AND 12 ARE ALL |
| | GREATER THAN 2000 CFM. PROVIDE FAN SHUT-DOWN BY SMOKE |
| | DETECTOR IN ACCORDANCE WITH FBCM 606.2.1 AND 606.4. |
| | |
| | 19. PG MN-2.05 AND MN-2.06: ACCORDING TO THE SMOKE |
| | CONTROL SEQUENCE ON PG MN-0.00, WHEN IN SMOKE CONTROL |
| | MODE THE 44X12 RETURN DUCT FROM AHU-6 WILL BECOME THE |
| | MAKE-UP AIR FOR SMOKE EXHAUST FAN SEF-1. THE OUTSIDE |
| | AIR DUCT FOR AHU-6, WHICH WILL BE SERVING AS THE SOURCE |
| | OF MAKE-UP AIR, IS ONLY 18X12 AND DESIGNED FOR 1320 |
| | CFM. HOW WILL THIS BE ADEQUATE FOR THE 33,750 CFM BEING |
| | EXHAUSTED FROM THE LOBBY? THIS DESIGN NEEDS TO BE |
| | JUSTIFIED IN THE RATIONAL ANALYSIS IN ACCORDANCE WITH |
| | FBCM 513.2 AND 513.4. SEE ALSO COMMENT #14 ABOVE. |
| | |
| | 20. PG MN-2.06: THE 86X20 EXHAUST DUCT IS PENETRATING |
| | TWO 2-HOUR RATED WALLS AS SHOWN ON PG LSN-1.2. SHOW HOW |
| | THESE PENETRATIONS ARE TO BE PROTECTED IN ACCORDANCE |
| | WITH FBCM 607.5 AND 607.2.1. |
| | |
| | 21.PG MN-2.06: THE 28X18 DUCT FOR SF-11 IS |
| | PENETRATING A 2-HOUR RATED FLOOR ASSEMBLY. SHOW HOW |
| | THIS PENETRATION IS TO BE PROTECTED IN ACCORDANCE WITH |
| | FBCM 607.6. |
| | |
| | 22. PG MN-2.06: THE 14X8 OUTSIDE AIR DUCT FOR THE |
| | FUTURE TENANT SPACES IS PENETRATING A 1-HOUR RATED WALL |
| | ASSEMBLY AS SHOWN ON PG LSN-1.2. SHOW HOW THIS |
| | PENETRATION IS TO BE PROTECTED IN ACCORDANCE WITH FBCM |
| | 607.5. |
| | |
| | 23. PG MN-2.06: SUPPLY FANS 3, 4, 8 AND 11 ARE ALL |
| | GREATER THAN 2000 CFM. PROVIDE FAN SHUT-DOWN BY SMOKE |
| | DETECTOR IN ACCORDANCE WITH FBCM 606.2.1 AND 606.4. |
| | |
| | 24. PG MN-2.06: SUPPLY DUCT AND LOUVER FOR SF-8 IS |
| | PENETRATING A 2-HOUR RATED WALL AS SHOWN ON PG LSN-1.2. |
| | SHOW HOW THIS OPENING/PENETRATION IS TO BE PROTECTED IN |
| | ACCORDANCE WITH FBCM 607.5. |
| | |
| | 25. PG MN-2.07: DUCT PENETRATIONS OF 1-HOUR RATED |
| | CORRIDOR ARE SHOWN AS HAVING FIRE DAMPERS BUT NO SMOKE |
| | DAMPERS. SHOW THESE PENETRATIONS TO BE PROTECTED WITH |
| | FIRE AND SMOKE DAMPERS IN ACCORDANCE WITH FBCM 607.5 |
| | AND 607.5.4. |
| | |
| | 26. PG MN-2.07: CU-7 IS SHOWN IN GARAGE AREA WITH |
| | REFRIGERANT LINES TERMINATING AT A 4X4 DUCT. AHU-7 IS |
| | ON THE MEZZANINE LEVEL BELOW AND ON THE OTHER SIDE OF |
| | THE BUILDING. SHOW THE ROUTING OF REFRIGERANT LINES |
| | FROM CU TO AHU. FBCM 1101.1, FBCB 106.1.1. |
| | |
| | 27. PG MN-2.08: SHUTOFF DAMPER CONTROLS ARE REQUIRED |
| | FOR THE AHU-8 OUTSIDE AIR INTAKE IN ACCORDANCE WITH |
| | FBCB 13-409.1.ABC.3.3. |
| | |
| | 28. PG MN-2.08: PROTECTION OF PENETRATION AT FLOOR IS |
| | REQUIRED FOR SF-11 DUCT IN ACCORDANCE WITH FBCM 607.6. |
| | SEE COMMENT #21. |
| | |
| | 29. PG MN-2.17: ROOF PLAN SHOWS SF-12 USED FOR |
| | PRESSURIZATION OF STAIR. SF-12 IS ALSO SHOWN AS A |
| | GARAGE VENTILATION FAN ON PG MN-2.05. FAN SCHEDULE ON |
| | MN-5.01 CALLS FOR SF-12 TO BE ON SECOND LEVEL. PLEASE |
| | COORDINATE THIS AND ALL FAN DESIGNATIONS ON FLOOR PLANS |
| | WITH THE INFORMATION ON THE FAN SCHEDULE. VERIFY |
| | CORRECT LOCATION IDENTIFICATION ON BOTH THE FLOOR PLANS |
| | AND THE SCHEDULE. FBCM 304.11, FBCB 106.1.1. |
| | |
| | 30. PG MN-2.17 AND MN-2.18: SERVICE ELEVATOR AND STAIR |
| | SHAFT VENT OPENINGS SHALL BE EQUIPPED WITH MOTORIZED |
| | DAMPERS IN ACCORDANCE WITH FBCB 13-409.1.ABC.3.1. |
| | |
| | 31. PG MN-2.17 AND MN-2.18: STAIR PRESSURIZATION FAN |
| | SF-14 AND DUCTWORK SHALL BE LOCATED EXTERIOR TO THE |
| | BUILDING AND DIRECTLY CONNECTED TO THE SMOKEPROOF |
| | ENCLOSURE OR CONNECTED TO THE SMOKEPROOF ENCLOSURE BY |
| | DUCTWORK ENCLOSED BY 2-HOUR FIRE-RESISTANCE-RATED FIRE |
| | BARRIERS IN ACCORDANCE WITH FBCB 909.20.6.1(1) |
| | |
| | 32. PG MN-2.17: MAIN ELEVATOR HOISTWAY VENTS SHALL OPEN |
| | EITHER DIRECTLY TO THE OUTER AIR OR THROUGH |
| | NONCOMBUSTIBLE DUCTS TO THE OUTER AIR IN ACCORDANCE |
| | WITH FBCB 3004.2. FLOOR PLAN CURRENTLY SHOWS THEM |
| | TERMINATING IN THE POOL MECHANICAL ROOM. ALSO, SUPPLY |
| | FAN DUCTS AND VENTILATION OPENINGS ARE PENETRATING THE |
| | ELEVATOR SHAFTS WITHIN THE BUILDING. THESE PENETRATIONS |
| | SHALL BE PROTECTED IN ACCORDANCE WITH FBCM 607.5.5.1. |
| | COMBINATION FIRE/SMOKE DAMPERS MAY BE USED IF UNDER THE |
| | CONTROL OF THE SMOKE CONTROL SYSTEM IN ACCORDANCE WITH |
| | FBCM 513.5.2. |
| | |
| | 33. PG MN-2.17: NO MEANS OF VENTILATION OR AIR |
| | CONDITIONING FOR THE ELEVATOR MACHINE ROOMS IS SHOWN ON |
| | PLANS. ELEVATOR MACHINE ROOMS THAT CONTAIN SOLID-STATE |
| | EQUIPMENT FOR ELEVATOR OPERATION SHALL BE PROVIDED WITH |
| | AN INDEPENDENT VENTILATION OR AIR-CONDITIONING SYSTEM |
| | TO PROTECT AGAINST THE OVERHEATING OF THE ELECTRICAL |
| | EQUIPMENT. THE SYSTEM SHALL BE CAPABLE OF MAINTAINING |
| | TEMPERATURES WITHIN THE RANGE ESTABLISHED FOR THE |
| | ELEVATOR EQUIPMENT IN ACCORDANCE WITH FBCB 3006.2. |
| | WHERE STANDBY POWER IS CONNECTED TO ELEVATORS, THE |
| | MACHINE ROOM VENTILATION OR AIR CONDITIONING SHALL BE |
| | CONNECTED TO THE STANDBY POWER SOURCE IN ACCORDANCE |
| | WITH FBCB 3003.1.4. |
| | |
| | 34. PG MN-2.17: THE ELEVATOR MACHINE ROOM SERVING A |
| | PRESSURIZED ELEVATOR HOISTWAY SHALL BE PRESSURIZED UPON |
| | ACTIVATION OF A HEAT OR SMOKE DETECTOR LOCATED IN THE |
| | ELEVATOR MACHINE ROOM IN ACCORDANCE WITH FBCB 3006.3. |
| | |
| | |
| | 35. PG MN-2.18: RTU-2 DUCT ON ROOF IS SHOWN AS 28X36 |
| | BUT ON RISER DIAGRAM ON PG MN-4.01 THE DUCT IS SHOWN AS |
| | 28X16. COORDINATE PLANS AND DUCT SIZES. FBCM 603.1, |
| | FBCB 106.1.1. |
| | |
| | 36. PG MN-3.0 THROUGH MN-3.6: FLOOR PLANS CALL FOR A |
| | VPAWP1-8 WALL PLENUM WITH A MIAMI-DADE APPROVED LOUVER. |
| | PROVIDE DETAIL SHOWING HOW AN APPROVED LOUVER IS TO BE |
| | INSTALLED IN ACCORDANCE WITH ITS APPROVED INSTALLATION |
| | INSTRUCTIONS WITH A WALL LOUVER ALSO INSTALLED IN THE |
| | WALL. EQUIPMENT AND APPLIANCES SHALL BE INSTALLED AS |
| | REQUIRED BY THE TERMS OF THEIR APPROVAL, IN ACCORDANCE |
| | WITH THE CONDITIONS OF THE LISTING, THE MANUFACTURER?S |
| | INSTALLATION INSTRUCTIONS AND THIS CODE PER FBCM 304.1 |
| | AND THE CONDITIONS OF THE MIAMI-DADE APPROVAL. PROVIDE |
| | ALL RELATED PRODUCT APPROVALS AND INSTALLATION |
| | INSTRUCTIONS. |
| | |
| | 37. PG MN-3.0 THROUGH MN-3.6: EACH UNIT FLOOR PLAN |
| | SHOWS A WASHER/DRYER, BUT NO PROVISIONS FOR DRYER |
| | EXHAUST ARE SHOWN ON PLANS. SHOW MEANS AND LOCATION OF |
| | DRYER EXHAUST WITH DUCT SIZE, TYPE OF MATERIAL AND |
| | TERMINATION LOCATION, DEMONSTRATING COMPLIANCE WITH |
| | FBCM 504.1 THROUGH 504.6. ADDITIONAL COMMENTS RELATED |
| | TO DRYER EXHAUST ARE LIKELY IN SUBSEQUENT REVIEW AS NO |
| | INFORMATION IS CURRENTLY PROVIDED. |
| | |
| | 38. PG MN-3.0: IN UNIT C, THE 6X4 SUPPLY DIFFUSER IN |
| | THE FOYER IS NOT BEING FED BY ANY DUCT. SHOW HOW THIS |
| | AIR IS TO BE SUPPLIED IN ACCORDANCE WITH FBCM 603.1. |
| | |
| | 39. PG MN-3.0: IN UNIT B, SUPPLY DIFFUSER IN LIVING |
| | ROOM IS MISSING SIZE AND CFM DESIGNATION. PROVIDE |
| | MISSING INFORMATION. FBCM 603.1. |
| | |
| | 40. PG MN-3.0 THROUGH MN-3.6: FLOOR PLAN CALLS FOR |
| | RETURN AIR GRILL WITH ACCESS PANEL AT ALL A/C UNITS. |
| | PROVIDE DETAIL ON PLANS AND MANUFACTURER?S INSTALLATION |
| | INSTRUCTIONS SHOWING THE AIR CONDITIONING APPLIANCES |
| | ARE ACCESSIBLE FOR SERVICE AND REPLACEMENT WITHOUT |
| | REMOVING ELEMENTS OF PERMANENT CONSTRUCTION IN |
| | ACCORDANCE WITH FBCM 306.1. |
| | |
| | 41. PG MN-3.0: IN UNIT D, SUPPLY DIFFUSER IN POWDER |
| | ROOM IS MISSING SIZE AND CFM DESIGNATION. PROVIDE |
| | MISSING INFORMATION. FBCM 603.1. |
| | |
| | 42. PG MN-3.0: IN UNIT C, THE 10X4 TRANSFER GRILL IN |
| | MASTER SITTING ROOM IS TOO SMALL TO MEET THE BALANCED |
| | RETURN EXCEPTION UNDER FBCM 601.4(2). SHOW HOW BALANCED |
| | RETURN IS TO BE ACHIEVED IN THIS AREA IN ACCORDANCE |
| | WITH THIS SECTION. |
| | |
| | 43. PG MN-3.1: IN UNIT F, AHU-2 CALLS FOR A TOTAL OF |
| | 500 CFM BUT FLOOR PLAN CALLS FOR 550 CFM. PLEASE |
| | COORDINATE FLOOR PLANS AND EQUIPMENT SCHEDULES. FBCM |
| | 603.1. |
| | |
| | 44. PG MN-3.1: IN UNIT F, THE 20X6 TRANSFER GRILL |
| | BETWEEN BEDROOM AND DINING ROOM IS TOO SMALL TO MEET |
| | THE BALANCED RETURN EXCEPTION UNDER FBCM 601.4(2). SHOW |
| | HOW BALANCED RETURN IS TO BE ACHIEVED IN THIS AREA IN |
| | ACCORDANCE WITH THIS SECTION. |
| | |
| | 45. PG MN-3.2: IN UNIT H, NO PROVISIONS FOR BALANCED |
| | RETURN ARE SHOWN ON PLANS FOR AHU-2. SHOW HOW BALANCED |
| | RETURN IS TO BE ACHIEVED IN THIS AREA IN ACCORDANCE |
| | WITH FBCM 601.4. |
| | |
| | 46. PG MN-3.2: IN UNIT J, AHU-3 CALLS FOR 780 CFM WHILE |
| | FLOOR PLAN CALLS FOR 890 CFM. IT APPEARS THAT THE 4 |
| | INCH DROP IN THE BATHROOM IS MISLABELED AT 150 CFM |
| | RATHER THAN THE USUAL 40 CFM. PLEASE VERIFY DESIRED |
| | AIRFLOWS AND COORDINATE FLOOR PLAN WITH EQUIPMENT |
| | SCHEDULE. FBCM 603.3. |
| | |
| | 47. PG MN-3.3: IN UNIT M, AHU-2 CALLS FOR A TOTAL OF |
| | 500 CFM BUT FLOOR PLAN CALLS FOR 550 CFM. PLEASE |
| | COORDINATE FLOOR PLANS AND EQUIPMENT SCHEDULES. FBCM |
| | 603.1. |
| | |
| | 48. PG MN-3.4: IN UNIT Q, AHU-6 IS SHOWN BUT AHU-6 ON |
| | SCHEDULE (MN-5.01) IS SHOWN AS SERVING THE LOBBY WITH |
| | 6000 CFM. PLEASE COORDINATE FLOOR PLANS WITH A/C |
| | SCHEDULE. FBCM 603.1, FBCB 106.1.1. |
| | |
| | 49. PG MN-3.4 AND MN-3.5: AHU-5 IS SHOWN AS A |
| | HORIZONTAL UNIT ABOVE THE CEILING. SHOW HOW THE AIR |
| | HANDLERS WILL BE ACCESSIBLE FOR SERVICE AND REPLACEMENT |
| | WITHOUT REMOVING ELEMENTS OF PERMANENT CONSTRUCTION IN |
| | ACCORDANCE WITH FBCM 306.1. |
| | |
| | 50. PG MN-3.4 AND MN-3.5 AND COMMON AREAS: LOCATION OF |
| | REMOTE CONDENSING UNITS FOR SPLIT SYSTEMS AND ROUTING |
| | OF REFRIGERANT LINES IN MOST CASES COULD NOT BE FOUND |
| | ON PLANS. SHOW LOCATION OF ALL APPLIANCES AND PIPING. |
| | FBCM 303.1, FBCB 106.1.1. |
| | |
| | 51. PG MN-3.4: IN UNIT P, AHU-4 IS A VERTICAL UNIT IN A |
| | PLENUM CLOSET. ARCHITECTURAL FLOOR PLAN CALLS FOR DOOR |
| | TYPE 19 AT THIS LOCATION. DOOR SCHEDULE ON AN-8.0 SHOWS |
| | THIS TO BE A WOOD DOOR. PLENUM ENCLOSURES SHALL BE |
| | CONSTRUCTED OF MATERIALS PERMITTED FOR THE TYPE OF |
| | CONSTRUCTION CLASSIFICATION OF THE BUILDING IN |
| | ACCORDANCE WITH FBCM 602.2. AS THIS BUILDING IS OF TYPE |
| | IA CONSTRUCTION, NO PORTION OF THE PLENUM MAY BE |
| | CONSTRUCTED OF WOOD. ALSO, MATERIALS EXPOSED WITHIN |
| | PLENUMS SHALL BE NONCOMBUSTIBLE OR SHALL HAVE A FLAME |
| | SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE-DEVELOPED |
| | INDEX OF NOT MORE THAN 50 WHEN TESTED IN ACCORDANCE |
| | WITH ASTM E 84 PER FBCM 606.2.2.1. SHOW A CLOSET DOOR |
| | ON ARCHITECTURAL PLANS WHICH IS IN COMPLIANCE WITH |
| | THESE SECTIONS. |
| | |
| | 52. PG MN-3.2 UNIT H AND ALL SIMILARLY CONFIGURED |
| | APARTMENTS: IS EF-1 EXHAUST DUCT PASSING THROUGH A |
| | RETURN PLENUM? EXHAUST DUCTS UNDER POSITIVE PRESSURE |
| | SHALL NOT EXTEND INTO OR PASS THROUGH DUCTS OR PLENUMS |
| | IN ACCORDANCE WITH FBCM 601.3. |
| | |
| | 53. PG MN-3.5: IN UNIT T, PROVIDE BALANCED RETURN FROM |
| | LIVING AREA TO AHU-2 IN ACCORDANCE WITH FBCM 601.4. |
| | |
| | 54. PG MN-3.5: IN UNIT V, FLOOR PLAN IS MISSING AHU |
| | DESIGNATIONS. PROVIDE MISSING INFORMATION. FBCM 603.1, |
| | FBCB 106.1.1. |
| | |
| | 55. PG MN-3.6: IN UNIT Z, DROP IN THE CLOSET IS MISSING |
| | GRILL SIZE AND CFM DESIGNATIONS. PROVIDE MISSING |
| | INFORMATION. FBCM 603.1. |
| | |
| | 56. PG MN-4.02 AND MN-4.03: SEE COMMENTS 29 THROUGH 34 |
| | REGARDING STAIR AND ELEVATOR SHAFT VENTILATION. |
| | |
| | 57. PG MN-5.01: REVIEW OF ENERGY CALCULATIONS AND |
| | COOLING LOAD CALCULATIONS HAVE BEEN MOVED TO THE END OF |
| | THE REVIEW COMMENTS. PLEASE SEE COMMENTS STARTING AT |
| | #71: |
| | |
| | 58. PG MN-5.01: FAN SCHEDULE, SF-1 IS SHOWN ON SCHEDULE |
| | AS PART OF THE SMOKE EVACUATION SYSTEM FOR THE LOBBY. |
| | THIS FAN IS NOT SHOWN AS PART OF THE SMOKE EVACUATION |
| | SYSTEM ON FLOOR PLANS. PLEASE COORDINATE FLOOR PLANS |
| | AND EQUIPMENT SCHEDULES. FBCM 301.1, FBCB 106.1.1. |
| | |
| | 59. PG MN-5.01: PACKAGED DUCTLESS SCHEDULE, BOTH CU-1 |
| | AND CU-2 ARE SHOWN TO HAVE A UNIT DESIGNATION OF CU-1. |
| | APPLIANCES SERVING DIFFERENT AREAS OF A BUILDING OTHER |
| | THAN WHERE THEY ARE INSTALLED SHALL BE PERMANENTLY |
| | MARKED IN AN APPROVED MANNER THAT UNIQUELY IDENTIFIES |
| | THE APPLIANCE AND THE AREA IT SERVES IN ACCORDANCE WITH |
| | FBCM 304.11. PLEASE CORRECT UNIT DESIGNATIONS. |
| | |
| | 60. PG MN-5.02: AHU DETAIL, NOTE 1 CALLS FOR CPVC PIPE |
| | IN PLENUM CLOSET. |
| | A) WHAT SIZE PIPE IS TO BE USED? CONDENSATE WASTE AND |
| | DRAIN LINE SIZE SHALL BE NOT LESS THAN ? INCH INTERNAL |
| | DIAMETER IN ACCORDANCE WITH FBCM 307.2.2. |
| | B) CPVC MAY OR MAY NOT MEET THE FLAME SPREAD ? SMOKE |
| | DEVELOPMENT RATING OF 25/50 AS REQUIRED BY FBCM |
| | 606.2.2.1 DEPENDING ON SIZE OF PIPE AND WHETHER OR NOT |
| | IT IS CHARGED WITH WATER (UNDER PRESSURE). EXCEPTION |
| | NUMBER 5 OF THIS SECTION REQUIRES COMBUSTIBLE MATERIALS |
| | TO BE ENCLOSED IN APPROVED GYPSUM BOARD ASSEMBLIES OR |
| | ENCLOSED IN MATERIALS LISTED AND LABELED FOR SUCH |
| | APPLICATION. ARMAFLEX IS NOT LISTED AND LABELED FOR |
| | ENCLOSING COMBUSTIBLE MATERIALS IN PLENUMS. SHOW HOW |
| | THE REQUIREMENTS OF THIS SECTION ARE TO BE MET. |
| | |
| | 61. PG MN-5.02: DUCT CONNECTION AND HANGER DETAILS, THE |
| | SUPPORT SPACING TABLE APPEARS TO APPLY TO SHEET METAL |
| | DUCTS, BUT THAT IS NOT INDICATED ON PLANS. THE SPACING |
| | SHOWN ON THE TABLE IS NOT ADEQUATE FOR THE SPACING |
| | REQUIREMENTS OF FLEX DUCTS. SHOW SUPPORT SPACING FOR |
| | FLEXIBLE DUCTS WHICH ARE IN COMPLIANCE WITH FBCM |
| | 603.5.6.6. |
| | |
| | 62. PG MN-5.02: CONDENSATE DRAIN TRAP DETAIL CALLS FOR |
| | REPLACEMENT OF EXISTING CONDENSATE TRAPS. THERE SHOULD |
| | BE NO EXISTING TRAPS AS THIS IS NEW CONSTRUCTION. WILL |
| | USED MATERIALS BE INSTALLED? SEE FBCB 301.4.4. |
| | |
| | 63. PG MN-5.02 AND MN-5.04: FIRE DAMPER DETAIL AND |
| | FIRE/SMOKE DAMPER DETAIL, THE DETAILS SHOWN ON PLANS |
| | LIKELY DO NOT CORRELATE WITH FIRE DAMPER MANUFACTURER?S |
| | INSTALLATION INSTRUCTIONS. FIRE DAMPERS, SMOKE DAMPERS, |
| | COMBINATION FIRE/SMOKE DAMPERS AND CEILING DAMPERS |
| | LOCATED WITHIN AIR DISTRIBUTION AND SMOKE CONTROL |
| | SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE |
| | REQUIREMENTS OF THE MANUFACTURER?S INSTALLATION |
| | INSTRUCTIONS AND LISTING PER FBCM 607.2. COORDINATE |
| | DETAILS ON PLANS WITH MANUFACTURER?S INSTRUCTIONS. |
| | |
| | 64. PG MN-5.02: CONDENSING UNIT ROOF DETAIL, NO |
| | INFORMATION OR DETAIL COULD BE FOUND IN STRUCTURAL |
| | PLANS FOR CONSTRUCTION AND FASTENING OF RACK. PROVIDE |
| | WIND LOAD CALCULATIONS AND STRUCTURAL DETAIL FOR |
| | CONSTRUCTION OF ROOF RACK FOR CONDENSING UNIT FOR |
| | BUILDING PLAN REVIEW IN ACCORDANCE WITH FBCM 301.13 AND |
| | FBCB 1609.1. |
| | |
| | 65. PG MN-5.02: CONDENSING UNIT ROOF DETAIL SHOWS |
| | CONDENSING UNITS SECURED TO RACK WITH CABLES. SHOW HOW |
| | THESE CABLES ARE TO BE USED TO SECURE CONDENSERS |
| | WITHOUT INTERFERING WITH THE SERVICE ACCESSIBILITY OF |
| | THE UNITS. CLEARANCES AROUND APPLIANCES TO ELEMENTS OF |
| | PERMANENT CONSTRUCTION, INCLUDING OTHER INSTALLED |
| | EQUIPMENT AND APPLIANCES, SHALL BE SUFFICIENT TO ALLOW |
| | INSPECTIONS, SERVICE, REPAIR OR REPLACEMENT WITHOUT |
| | REMOVING SUCH ELEMENTS OF PERMANENT CONSTRUCTION IN |
| | ACCORDANCE WITH FBCM 306.1. |
| | |
| | 66. PG MN-5.03: HORIZONTAL AHU DETAIL, PROVIDE |
| | SECONDARY OR AUXILIARY DRAIN PROTECTION IN ACCORDANCE |
| | WITH FBCM 307.2.3. |
| | |
| | 67. PG MN-5.03: ROOFTOP PACKAGE UNITS, PROVIDE |
| | MANUFACTURER?S TEST DATA SHOWING THESE UNITS ARE |
| | DESIGNED TO WITHSTAND ANTICIPATED WIND PRESSURES. NOT |
| | JUST THE ATTACHMENTS, BUT THE UNITS THEMSELVES SHALL BE |
| | DESIGNED TO WITHSTAND WIND PRESSURES IN ACCORDANCE WITH |
| | FBCM 301.13 AND FBCB 1609.1. |
| | |
| | 67. PG MN-5.03: ROOFTOP PACKAGE UNITS, THE ATTACHMENT |
| | DETAIL IS NOT LEGIBLE AS IT APPEARS THAT CERTAIN LAYERS |
| | DO NOT LINE UP IN THE DRAWING. PLEASE CORRECT. ALSO, |
| | PLEASE SEE COMMENT # 65 REGARDING SUPPLEMENTAL |
| | RESTRAINTS AND SERVICE ACCESS FOR THE UNITS. |
| | |
| | 68. PG MN-5.05: OUTSIDE AIR CALCULATIONS, PLEASE |
| | REFERENCE ASHRAE 62.1-2004. ADDENDUM N AS SHOWN ON |
| | PLANS IS NOT THE CURRENT ADOPTED STANDARD ACCORDING TO |
| | FBCM CHAPTER 15. |
| | |
| | 69. PG MN-5.05: OUTSIDE AIR CALCULATIONS, PLEASE |
| | PROVIDE CALCULATIONS SHOWING APARTMENT UNITS HAVING |
| | ADEQUATE NATURAL VENTILATION IN ACCORDANCE WITH FBCM |
| | SECTION 402 SINCE MECHANICAL VENTILATION FOR THE |
| | APARTMENTS IS NOT PROVIDED. |
| | |
| | 70. NO INFORMATION COULD BE FOUND ON PLANS REGARDING |
| | THE EMERGENCY GENERATOR. SHOW MEANS AND LOCATION OF |
| | FUEL STORAGE TO BE IN COMPLIANCE WITH FBCM 915.1, 915.2 |
| | AND NFPA 37-02. SHOW MEANS OF VENTILATION AND EXHAUST |
| | TO BE IN COMPLIANCE WITH FBCM 401.5, 401.6 AND NFPA |
| | 110-02 SECTIONS 7.7.1 THROUGH 7.7.8. |
| | |
| | 71. ENERGY CALCULATIONS: THE VERSION OF ENERGY |
| | CALCULATIONS WHICH WERE SUBMITTED IS NOT THE VERSION |
| | ADOPTED UNDER THE CURRENT EDITION OF THE FLORIDA |
| | BUILDING CODE. AN ACCURATELY COMPLETED FORM 400A-04R |
| | (GENERATED BY THE FLA/COM-2004 COMPUTER PROGRAM, |
| | VERSION 2.5) DEMONSTRATING THAT CODE COMPLIANCE HAS |
| | BEEN ACHIEVED SHALL BE SUBMITTED TO THE BUILDING |
| | OFFICIAL FOR METHOD A COMPLIANCE IN ACCORDANCE WITH |
| | FBCB 13-400.3.A. ALSO, THE FRONT PAGE INDICATES THIS IS |
| | A TWO STORY BUILDING WITH A MAX TONNAGE OF 3. PLEASE |
| | CORRECT AS THESE ARE NOT ACCURATE REPRESENTATIONS. |
| | |
| | 72. ENERGY CALCULATIONS: THERE ARE MANY DISCREPENCISE |
| | BETWEEN THE INFORMATION SHOWN IN THE INPUT DATA REPORT |
| | (IDR) AND THE CONDITIONS SHOWN ON THE PLANS. |
| | EXAMPLE: EVERY ZONE IS SHOWN IN THE IDR AS HAVING A |
| | DEPTH OF 100 FEET. THIS IS CLEARLY NOT THE CASE ON THE |
| | PLANS. ALSO, THE LOBBY IS SHOWN AS HAVING A HEIGHT OF 8 |
| | FEET. THIS IS ALSO NOT CORRECT AS THE LOBBY HEIGHT GOES |
| | FROM THE GROUND FLOOR THROUGH THE MEZZANINE. |
| | EXAMPLE: THE IDR SHOWS THE AC IN THE LOBBY-MEZZANINE TO |
| | BE <65,000 BTU/H OR 18,000 BTU/H BUT AHU-6 ON PLAN IS |
| | SHOWN AS 180,000 BTU/H OR 15 TONS. AN EFFICIENCY RATING |
| | OF 13 SEER WOULD BE INAPPROPRIATE FOR A UNIT OF THAT |
| | SIZE. |
| | EXAMPLE: THE ZONES AS DESCRIBED IN THE IDR ARE NOT |
| | CORRECTLY SEPARATED BASED ON THE WAY ZONES ARE REQUIRED |
| | TO BE SEPARATED IN ACCORDANCE WITH FBCB |
| | 13-407.1.ABC.2.4.3. THERE ARE ZONES WHICH COVER MORE |
| | THAN ONE FLOOR AND ZONES WHICH COVER MORE THAN 25,000 |
| | SQUARE FEET. BOTH OF THESE CONDITIONS ARE PROHIBITED |
| | UNDER THIS SECTION. |
| | |
| | 73. THESE ARE EXAMPLES OF DISCREPANCIES WHICH HAVE BEEN |
| | IDENTIFIED IN THE ENERGY CALCULATIONS. THEY ARE NOT |
| | INTENDED TO BE AN EXHAUSTIVE LIST OF ALL PROBLEMS OR |
| | INACCURACIES CONTAINED WITHIN. IT IS THE RESPONSIBILITY |
| | OF THE DESIGN PROFESSIONAL TO PREPARE AND SUBMIT AN |
| | ACCURATELY COMPLETED ENERGY CODE COMPLIANCE FORM. |
| | PLEASE TAKE THE TIME TO VERIFY ALL DATA INCLUDED IN THE |
| | IDR AS IT WILL BE REVIEWED AND COMPARED TO THE |
| | SUBMITTED PLANS. |
| | |
| | 74. DUE TO THE INACCURATE NATURE OF THE ENERGY CODE |
| | COMPLIANCE FORM, THE COOLING LOAD CALCULATIONS CAN NOT |
| | BE REVIEWED AT THIS TIME. PLEASE VERIFY ANY CHANGES |
| | MADE TO THE ENERGY CODE CALCULATIONS AND THE PLANS ARE |
| | INCORPORATED INTO THE COOLING LOAD CALCULATIONS AND |
| | RESUBMIT IN ACCORDANCE WITH FBCB 13-407.1.ABC.1. |
| | |
| | NOTE: DUE TO THE AREAS OF INFORMATION WHICH IS LACKING |
| | ON THE PLANS, A THOROUGH REVIEW CANNOT BE COMPLETED AT |
| | THIS TIME. IT IS LIKELY THAT ADDITIONAL NEW COMMENTS |
| | WILL BE GENERATED DURING SUBSEQUENT REVIEWS ONCE |
| | MISSING INFORMATION IS PROVIDED. |
| | |
| | NOTE: PLEASE RESPOND TO EACH COMMENT IN WRITING WITH |
| | INDICATION AS TO HOW THE COMMENT WAS ADDRESSED AND |
| | WHERE THE RELEVANT INFORMATION CAN BE LOCATED. ALSO, |
| | PLEASE RETURN ONE SET OF OLD/VOIDED PLANS TO ASSIST IN |
| | SUBSEQUENT REVIEWS. |
| | |
| | NOTE: ALL PERMITS WHICH ARE ISSUED AFTER JULY 1, 2008 |
| | ARE SUBJECT TO NEW STATE REQUIREMENTS FOR CARBON |
| | MONOXIDE SENSORS IN EVERY SLEEPING ROOM WHEN FUEL FIRED |
| | APPLIANCES OR AN ATTACHED GARAGE IS PRESENT. |
| | |
| | IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |
| | RONALD J. REGUEIRO |
| | 561.805.6719 |
| | [email protected] |