| Date |
Text |
| 2008-03-10 15:57:52 | DENIED |
| | REFERENCE: FBC-2004 PLUMBING |
| | FBC-2004 BUILDING |
| | FBC-2004 FUEL GAS |
| | FBC-2004 CHAPTER 1 |
| | FBC-2004 CHAPTER 11 |
| | FLORIDA ADMINISTRATIVE CODE |
| | FLORIDA STATUTES |
| | FHA-98 DESIGN MANUAL |
| | CITY WPB MUNICIPAL CODES |
| | |
| | 1. SHT G.000 GUESTROOM MATRIX. THE TOTAL FOR FOR THE |
| | QUEEN STANDARD IS SHOWN AS 81, BUT ADDS UP TO 72. |
| | PLEASE RECHECK THE CALCULATIONS. SECTIONS 106.1.2 & |
| | 11-9.1.2. |
| | |
| | 2. SHT G.000 GUESTROOM MATRIX DOES NOT COMPLY WITH |
| | SECTION 11-9.1.4 AS THERE IS NOT ACCESSIBLE BOARDROOM |
| | SUITE AVAILABLE. |
| | |
| | 3. SHT G.000 PER SECTION 11-9.1.2, PURSANT TO CHAPTER |
| | 509, FLORIDA STATUTES, A NUMBER OF ROOMS EQUALLING AT |
| | LEAST 5% OF THE GUEST ROOMS MINUM THE NUMBER OF |
| | ACCESSIBLE ROOMS REQUIRED BY TABLE BELOW SHALL PROVIDE |
| | ADDITIONAL FEATURES OF SECTION 11-9.2.3. ONE ROOM IS |
| | REQUIRED, PLEASE INDICATE THE ROOM NUMBER & LOCATION OF |
| | THE REQUIRED ROOM. |
| | |
| | 4. SHTS G-00- THRU G-009 & SHTS AC-101 THRU A-812. THE |
| | PRINTED NAME OF THE PERSON SEALING THE DOCUMENTS IS |
| | REQUIRED ON EACH SHEET. FAC 61G1-16.004(6) & FS |
| | 481.2055. |
| | |
| | 5. SHT G001 INDEX OF DRAWINGS DOES NOT REFLECT THE |
| | SHEETS SUBMITTED. SHTS A-813 THRU A-819 SHOWN ON THE |
| | INDEX WERE NOT SUBMITTED. SHTS P-101 THRU P-105, P-201 |
| | THRU P-204 SHOWN ON THE INDEX WERE NOT SUBMITTED. SHTS |
| | P-101B THRU P-105B, P-201B THRU 204B, P-602 WERE |
| | SUBMITTED BUT NOT SHOWN ON THE INDEX. ALSO SHEET TITLES |
| | ON SHTS P-101A THRU P-204A & P-101B THRU P-204B DO NOT |
| | REFLECT THE INDEX TITLES. PLEASE CORRELATE THE INDEX |
| | WITH SHEETS & INFORMATION SUBMITTED. SECTION 106.1.3. |
| | |
| | 6. SHT AC-102 SHOWS A COMPACTOR PAD FLOOR DRAIN. PLEASE |
| | INDICATE IF THE COMPACTOR WILL BE COMPACTING GREASY |
| | WASTE. ALSO THE STORM WATER CAN NOT DRAIN INTO THE |
| | SANITARY SYSTEM. INDICATE THE METHOD OF KEEPING THE |
| | STORM WATER OUT OF THE SANT. SYSTEM. ARTICLE III, |
| | SECTION 90-125(B)(5). IN THE PAST WHEN THIS ISSUE CAME |
| | UP, WE INDICATED THAT THE DRAIN IS NOT REQUIRED. PLEASE |
| | CLARIFY. |
| | |
| | 7. ALL PLUMBING SHEETS THAT INDICATE "TYPICAL LEVEL |
| | PLAN". PLEASE INDICATE WHAT FLOORS THE PLANS ARE |
| | TYPICAL OF. SECTIONS 106.1.1 & 106.1.2. |
| | |
| | 8. SHT A-100D IS INDICATED AS TYPICAL LEVEL PLAN 4TH |
| | FLOOR. ARE THE 3RD & 5TH FLOORS DIFFERENT. THESE FLOORS |
| | HAVE NOT BEEN SUBMITTED. SECTIONS 106.1.1 & 106.1.2. |
| | |
| | 9. PLANS SHALL BE ROUTED TO THE STATE OF FLORIDA, DEPT. |
| | OF BUSINESS REGULATION. (DBPR), DIVISION OF HOTEL AND |
| | RESTAURANT FOOD SERVICE LICENSE FOR REVIEW PRIOR TO |
| | RESUBMITTING TO THE CITY FOR REVIEW. A MINIMUM OF 3 |
| | SETS OF PLANS WITH THE DBPR REVIEW SHALL BE SUBMITTED. |
| | THE "SPECIFICATION WORKSHEETS" SHALL BE ATTACHED TO THE |
| | SHEET WITH THE DBPR PLAN REVIEW STAMP. SECTION |
| | 102.2.1. |
| | |
| | 10. SHT A-423 DETAILS 1, 3, 7 & 8 THE TURNING AREA |
| | SHALL BE UNOBSTRUCTED. THE W/C CAN NOT BE IN THE |
| | TURNING AREA. SECTION 11-4.22.3.--DETAILS 1 & 8 |
| | SHALL SHOW THE CLEAR FLOOR SPACE FOR THE W/C, TUB & LAV |
| | PER SECTIONS 11-4.16.2, 11-4.19.3 & 11-4.20.2. |
| | |
| | 11. SHT A-425 DETAILS 1, 3, 4 & 5 THE TURNING AREA |
| | SHALL BE UNOBSTRUCTED. THE W/C CAN NOT BE IN THE |
| | TURNING AREA. SECTION 11-4.22.3.--DETAILS 1 & 5 |
| | SHALL SHOW THE CLEAR FLOOR SPACE FOR THE W/C, TUB & LAV |
| | PER SECTIONS 11-4.16.2, 11-4.19.3 & 11-4.20.2. |
| | |
| | 12 SHT A-4.26 DETAIL 1 THE TURNING AREA SHALL BE |
| | UNOBSTRUCTED. THE W/C CAN NOT BE IN THE TURNING AREA. |
| | SECTION 11-4.22.3.--DETAILS 1 & 6 SHALL SHOW THE |
| | CLEAR FLOOR SPACE FOR THE W/C, TUB & LAV PER SECTIONS |
| | 11-4.16.2, 11-4.19.3 & 11-4.20.2. |
| | |
| | 13. SHT A-612 THE WALL FINISH FOR THE TOILET ROOMS 112, |
| | 113, 137 & 138 IS STATED AS "VARIES"PLEASE SHOW |
| | COMPLIANCE WITH SECTION 1210.2 REQUIREMENT FOR THE |
| | WALLS WITHIN 2 FT OF THE TOILETS OR URINALS SHALL HAVE |
| | A "SMOOTH, HARD, NONABSORBENT" SURFACE. |
| | |
| | 14. ALL MECH, PLMG & ELECT SHEETS. THE ADDRESS OF THE |
| | ENGINEER FIRM ON THE TITLE BLOCKS DOES NOT REFLECT THE |
| | ADDRESS OF RECORD ON THE STATE OF FLORIDA DBPR WEBSITE. |
| | PLEASE UPDATE THE TITLE BLOCKS OR THE DBPR WEBSITE SO |
| | THEY REFLECT PRIOR TO RESUBMITTING TO THE CITY FOR |
| | REVIEW. IF MULTIPLE ADDRESS, PLEASE ADD THE ADDRESS OF |
| | RECORD TO TITLE BLOCKS. FAC 61G15-23.002(2) & FS |
| | 471.025. |
| | |
| | 15. SHT P-001 LAUNDRY EQUIPMENT LOAD SCHEDULE ITEM 02 |
| | GAS DRYER INDICATES A 3/4" HOT WATER SUPPLY CONNECTING |
| | TO THE DRYER. PLEASE CLARIFY. SUBMIT MANUF. |
| | INSTALLATION INSTRUCTIONS. IF REQUIRED, SHOW BACKFLOW |
| | METHOD. SECTIONS 106.1.2 & 608. |
| | |
| | 16. SHT P-101A A 2-WAY CLEANOUT IS REQUIRED AT THE |
| | INLET AND EXIT OF EACH GREASE INTERCEPTOR. PLEASE |
| | INDICATE ON THE CLEANOUT BETWEEN THE GREASE |
| | INTERCEPTORS. UTILITY STANDARD FOR GREASE INTERCEPTORS |
| | & SECTION 708.3.2. |
| | |
| | 17. SHT P-101A THE CONDENSATE SHALL DRAIN SEPARATELY |
| | FROM THE BUILDING AND TERMINATE IN A CATCH BASIN, A |
| | DRYWELL, A PLANTED AREA, OR CONNECT TO THE STORM SEWER. |
| | IF CONNECTING TO THE STORM SEWER, A RELIEF VENT, |
| | (GOOSENECK), IS REQUIRED AS THE CONDENSATE EXITS THE |
| | BUILDING. SECTION 314.2.1. |
| | |
| | 18. SHT P101AINDICATES "6 INCH PDD DN 4546SF. PLEASE |
| | SHOW WHERE THE LINE IS AND INDICATE WHAT PDD STANDS FOR |
| | AS IT IS NOT INDICATED ON THE ABBREVIATION SCHEDULE ON |
| | SHT P-001. SECTION 106.1.2. |
| | |
| | 19. SHT P-101B THE COMPACTOR INDICATES4" GREASE |
| | (4DFU'S), BUT SHOWS THE FLOOR DRAIN CONNECTING TO THE |
| | SANITARY SYSTEM. PLEASE SEE COMMENT #6. SECTION |
| | 106.1.1 |
| | |
| | 20. SHT P-101B CLEANOUTS ARE REQUIRED ON THE SANITARY & |
| | STORM SYSTEMS PER SECTIONS 708.3.5 & 1101.8. |
| | |
| | 21. SHTS P-102A P-102B, P-103A & P-103B THE CONDENSATE |
| | SHALL DRAIN FROM THE BUILDING SEPARATELY. (SEE COMMENT |
| | #17).--THE BACKWATER VALVES ARE NOT REQUIRED IF THE |
| | RELIEF VENTS ARE INSTALLED. |
| | |
| | 22. SHT P-103A THE W/C & LAV ARE NOT SHOWN ON THE FLOOR |
| | PLAN IN ROOM 219. PLEASE SHOW ALL FIXTURES ON FLOOR |
| | PLAN. SECTION 106.1.1. |
| | |
| | 23. SHT P-103A SAN-8A RISER "B" SHOWS TUBS ON THE |
| | RISER, BUT SHOWERS ON THE FLOOR PLAN. PLEASE CORRELATE. |
| | SECTION 106.1.1. |
| | |
| | 24. SHT P-103A SHOWERS ARE NOT SHOWN ON THE FLOOR PLAN |
| | IN ROOMS 213 THRU 216, 224 & 225.--PLEASE SHOW |
| | RISER DESIGNATIONS FOR RISERS ST/14 & STO/14. SECTION |
| | 106.1.2. |
| | |
| | 25. SHT P-103B SANITARY RISER SAN-4A SHOWS SHOWERS ON |
| | THE FLOOR PLAN, BUT TUBS ON THE RISER DIAGRAM. PLEASE |
| | CORRELATE. SECTION 106.1.1. |
| | |
| | 26. SHT P-104A KING ROOMS 449, *48, 447, 445, 432, 430, |
| | 429 & 431 SHOW SHOWERS ON THE FLOOR PLAN, BUT TUBS ON |
| | THE RISER DIAGRAMS. PLEASE CORRELATE. SECTION 106.1.1. |
| | |
| | 27. SHT P-104A INDICATES RISER "C" ON THE FLOOR PLAN, |
| | BUT RISER "C" NOT SUBMITTED. PLEASE CLARIFY. SECTION |
| | 106.1.1. |
| | |
| | 28. SHT P-104A RISER SAN-10A THE SINK, (S-1) SHALL |
| | DISCHARGE DOWNSTREAM OF THE WET VENT FOR THE BATHROOM |
| | FIXTURES. SECTION 909.1. |
| | |
| | 29. SHT P-104B KING ROOMS 413, 414, 415 &416 SHOWS |
| | SHOWERS ON THE FLOOR PLAN, BUT SHOWS TUBS ON THE RISER |
| | DIAGRAM. PLEASE CORRELATE. SECTION 106.1.1. |
| | |
| | 30. SHTS P-105A & P-105B INDICATE THE RISER DESIGNATION |
| | NUMBERS AT THE ROOF DRAINS/OD'S TO TRACK RISER THRU |
| | BUILDING. SECTION 106.1.2. |
| | |
| | 31. SHT P-203A THE SHOWERS ARE NOT SHOWN ON THE FLOOR |
| | PLAN IN MANY ROOMS/UNITS. PLEASE SHOW ALL FIXTURES ON |
| | THE FLOOR PLAN. SECTION 106.1.1. |
| | |
| | 32. SHT P-203A SUBMIT THE RISER DIAGRAM FOR THE LAUNDRY |
| | ROOM. SHOW ALL PIPE SIZES, VALVES & REQUIRED WATER |
| | HAMMER ARRESTORS. SECTIONS 103.5.1.3, 604.1, 604.9, |
| | 606.2(1). |
| | |
| | 33. SHT. P-203A IDENTIFY FIXTURE (TMV-3) SHOWN AT COL. |
| | LINE D BETWEEN COLS 10 & 11. SECTION 106.1.2. |
| | |
| | 34. SHT P-301 NOTE FOR CONTINUATION OF 2-1/2" VENT LINE |
| | IS NOT COMPLETE. PLEASE CLARIFY WHERE CONTINUATION CAN |
| | BE FOUND. SECTION 106.1.2. |
| | |
| | 35. SHT P-302 IDENTIFY COLD WATER RISER NEAR COL. LINE |
| | E/8.5. (NOT SHOWN ON THE RISER DIAGRAM). SECTION |
| | 106.1.2. |
| | |
| | 36. SHT P-302 HOT WATER SUPPLY ONLY SHOWN TO RISER #45 |
| | ON THE FLOOR PLAN, BUT THE NOTE INDICATES HW & CW TO |
| | RISER. PLEASE CORRELATE. SECTION 106.1.1. |
| | |
| | 37. SHT P-402 HOT WATER DETAILS. TRAP PRIMERS ARE |
| | REQUIRED AT THE FLOOR DRAINS. SECTION 1002.4.-- |
| | THERMAL EXPANSION CONTROL REQUIRED FOR WATER HEATERS IN |
| | DETAIL NUMBER 13. IF AN EXPANSION TANK WILL BE |
| | INSTALLED, SUBMIT CALCULATIONS FOR EXPANSION CONTROL |
| | EXPANSION TANKS, (FOR DETAIL # 14 ALSO), & SUBMIT |
| | MANUF. SPECIFICATION SHEETS WITH INSTALLION/SIZE CHART. |
| | INDICATE MODEL NUMBERS. SECTION 607.3.2. |
| | |
| | 38. SHT P-500 WEST END SANT. RISERS. EVERY VENT STACK |
| | SHALL CONNECT TO THE BASE OF THE DRAINAGE STACK PER |
| | SECTION 903.4. |
| | |
| | 38. SHT P-500 RISER SAN-10B SHOWS A DRY HORIZONTAL VENT |
| | PAST FIXTURE BT-1. THIS IS PROHIBITED PER SECTIONS |
| | 905.3 & 905.4. |
| | |
| | 39. SHT P-500 RISER SAN-10A THE S-1 SINK SHALL |
| | DISCHARGE DOWNSTREAM OF THE WET-VENTED BATHROOM |
| | FIXTURES. SECTION 909.1. |
| | |
| | 40 SHT P-500 RISER SAN-9A DOES NOT REFLECT THE FLOOR |
| | PLAN AT THE 2ND FLOOR AND NOT ALL FIXTURES ARE VENTED. |
| | PLEASE CORRELATE. SECTIONS 106.1.1 & 901.2.1. |
| | |
| | 41. SHT P-500 RISER SAN-8A DOES NOT REFLECT THE FLOOR |
| | PLAN. PLEASE CORRELATE. SECTION 106.1.1. |
| | |
| | 42. SHT P-500 FIXTURE UPSTREAM OF RISER SAN-10 DOES NOT |
| | REFLECT THE FLOOR PLAN. SHOWER INDICATED ON THE FLOOR |
| | PLAN, FLOOR DRAIN ON RISER DIAGRAM. PLEASE CORRELATE. |
| | SECTION 106.1.1. |
| | |
| | 43. SHT P-500 CONNECTIONS TO THE BUILDING DRAIN AT |
| | RISER SAN-10 & BRANCH LINE DO NOT REFLECT THE FLOOR |
| | PLAN. PLEASE CORRELATE. SECTION 106.1.1. |
| | |
| | 44. SHT P-500 RISER SAN-8/9 OFFSET IN THE 1ST FLOOR |
| | CEILING DOES NOT REFLECT THE FLOOR PLAN OFFSET. PLEASE |
| | CORRELATE. SECTION 106.1.1. |
| | |
| | 45. SHT P-500 RISERS SAN-6A, 7A, 8A, 12A & 13 DO NOT |
| | REFLECT THE FLOOR PLAN. PLEASE CORRELATE. SECTION |
| | 106.1.1. |
| | |
| | 46. SHT P-500 RISER SAN-6 DOES NOT REFLECT THE FLOOR |
| | PLAN AT THE OFFSET BELOW THE 3RD FLOOR. PLEASE |
| | CORRELATE. SECTION 106.1.1. |
| | |
| | 47. SHT P-500 RISER SAN-11 DOES NOT REFLECT THE FLOOR |
| | PLAN AT THE BASE OF THE STACK. PLEASE CORRELATE. |
| | SECTION 106.1.1. |
| | |
| | 48. SHT P-500 VENTING ABOVE TOILET ROOMS 137 & 138 DOES |
| | NOT REFLECT THE FLOOR PLAN. PLEASE CORRELATE. SECTION |
| | 106.1.1. |
| | |
| | 49. SHT P-500 RISER SAN-12A DOES NOT REFLECT THE FLOOR |
| | PLAN AT TOILET ROOM 2ND FLOOR. PLEASE CORRELATE. |
| | SECTION 106.1.1. |
| | |
| | 50. SHT P-500 RISER SAN-13 DOES NOT REFLECT THE FLOOR |
| | PLAN 2ND FLOOR. FLOOR PLAN SHOWS SHOWER,RISER SHOWS |
| | TUB. PLEASE CORRELATE. SECTION 106.1.1. |
| | |
| | 51. SHT P-500 2 WAY CLEANOUT REQUIRED BETWEEN THE |
| | GREASE INTERCEPTORS. UTILITY STANDARD & SECTION |
| | 708.3.2. |
| | |
| | 52. SHT P-501 EAST END SANITARY RISER. EVERY VENT STACK |
| | SHALL CONNECT TO THE BASE OF THE DRAINAGE STACK PER |
| | SECTION 903.4. |
| | |
| | 53. SHT P-501 SHOW ALL PIPE SIZES FOR THE GREASE |
| | SYSTEM. SECTIONS 701.1 AND TABLES 710.1(1) & 710.1(2). |
| | |
| | 54. SHT P-501 THE VENT PIPING FROM TOILET ROOMS 112 & |
| | 113 DOES NOT REFLECT THE FLOOR PLAN. PLEASE CORRELATE. |
| | SECTION 106.1.1. |
| | |
| | 55. SHT P-501 RISERS SAN-5A, 4A, 3A & 2A DO NOT REFLECT |
| | THE FLOOR PLAN, NOR DO THEY MEET CODE REQUIREMENTS FOR |
| | VENTING FOR THE SECOND FLOOR FIXTURES. PLEASE |
| | CORRELATE. SECTIONS 106.1.1 & 901.2.1. |
| | |
| | 56. SHT P-501 RISERS FOR ROOMS 104, 105, 106 & 107 DO |
| | NOT REFLECT THE FLOOR PLAN. PLEASE CORRELATE. SECTION |
| | 106.1.1. |
| | |
| | 57. SHT P-501 CONNECTIONS TO RISERS SAN-2A & 1A DO NOT |
| | REFLECT THE FLOOR PLANS. PLEASE CORRELATE. SECTION |
| | 106.1.1. |
| | |
| | 58. SHT P-501 2 FLOOR DRAINS ARE SHOWN ON THE FLOOR |
| | PLAN AT THE COMPACTOR, BUT ONLY ONE IS SHOWN ON THE |
| | RISER DIAGRAM. PLEASE CLARIFY & PLEASE CORRELATE. |
| | SECTION 106.1.1. (PLEASE SEE COMMENT #6). |
| | |
| | 59. SHT P-501 RISER SAN-1/2 3" BRANCH LINE TO LAUNDRY |
| | FLOOR DRAIN IS NOT SHOWN ON THE RISER. PLEASE |
| | CORRELATE. SECTION 106.1.1. |
| | |
| | 60. SHT P-501 PIPING IN THE MEZZANINE CEILING FOR |
| | RISERS SAN-3 & SAN-4 DO NOT REFLECT THE FLOOR PLAN. |
| | PLEASE CORRELATE. SECTION 106.1.1. |
| | |
| | 61. SHTS P-500 & P-501 CLEANOUTS ARE REQUIRED AT THE |
| | BASE OF EACH STACK PER SECTION 708.3.4. PLEASE SHOW ON |
| | RISERS. |
| | |
| | 62. SHT P-502 SHOW 2 RISERS DESIGNATED RISER "E" PLEASE |
| | CLARIFY. SECTION 106.1.1. |
| | |
| | 63. SHT P-502 SECOND RISER "E"THE S-1 SINK SHALL |
| | DISCHARGE DOWNSTREAM OF THE WET-VENTED BATHROOM |
| | FIXTURES. SECTION 909.1. |
| | |
| | 64. SHT P-503 FIVE HOSE BIBB LINES SHOWN ON THE FLOOR |
| | PLAN ARE NOT SHOWN ON THE RISER DIAGRAM. PLEASE |
| | CORRELATE. SECTION 106.1.1. |
| | |
| | 65. SHT P-504 THREE HOSE BIBB LINES SHOWN ON THE FLOOR |
| | PLAN ARE NOT SHOWN ON THE RISER DIAGRAM. PLEASE |
| | CORRELATE. SECTION 106.1.1. |
| | |
| | 66. SHT P-504 THE BRANCH LINE TO CW/18 DOES NOT REFLECT |
| | THE FLOOR PLAN. PLEASE CORRELATE. SECTION 106.1.1. |
| | |
| | 67. SHT P-504 THE BASE OF RISER CW/14A CONNECTION TO |
| | THE WATER MAINS DOES NOT REFLECT THE FLOOR PLAN. PLEASE |
| | CORRELATE. SECTION 106.1.1. |
| | |
| | 68. SHT P-504 THE 1-1/4" HOT WATER BRANCH LINE DOES NOT |
| | REFLECT THE FLOOR PLAN. PLEASE CORRELATE. SECTION |
| | 106.1.1. |
| | |
| | 69. SHT P-505 2 HOSE BIBB LINES SHOWN ON THE FLOOR PLAN |
| | ARE NOT SHOWN ON THE RISER DIAGRAM. PLEASE CORRELATE. |
| | SECTION 106.1.1. |
| | |
| | 70. SHT P-507 RISER "H" DOES NOT REFLECT THE FLOOR PLAN |
| | PIPING FROM THE RISER AND TUBS ARE SHOWN ON THE FLOOR |
| | PLAN. PLEASE CORRELATE. SECTION 106.1.1. |
| | |
| | 71. SHT P-600 CONDENSATE SHALL DRAIN SEPARATELY FROM |
| | THE BUILDING. SECTION 314.2.1. (SEE COMMENT # 17). |
| | |
| | 72. SHT P-600 CONDENSATE INFORMATION NOTE STATES "SEE |
| | DWG P-103 FOR CONT". SHT P-103 WAS NOT SUBMITTED. SHT |
| | 103A 2ND FLOOR WEST DOES NOT SHOW RISER. PLEASE |
| | INDICATE WHERE INFORMATION CONTINUES. SECTION 106.1.1. |
| | |
| | 73. SHT P-600 RISERS STO/8 & STO/9 DO NOT REFLECT THE |
| | FLOOR PLAN AT THE TERMINATION. (SEE SHT P-101A). PLEASE |
| | CORRELATE. SECTION 106.1.1. |
| | |
| | 74. SHT P-600 CLEANOUTS REQUIRED PER SECTION 1101.8. |
| | PLEASE SHOW ALL REQUIRED C/O'S ON PLANS. |
| | |
| | 75. SHT P-600 PDD CONNECTION TO RISER ST/8-ST/9 DOES |
| | NOT REFLECT THE FLOOR PLAN. PLEASE CORRELATE. SECTION |
| | 106.1.1. |
| | |
| | 76. SHT P-600 RISERS ST/10 & STO/10 DO NOT REFLECT THE |
| | FLOOR PLAN AT THE OFFSET & LOCATION OF RISER STO/10. |
| | (SEE SHT P-102A). PLEASE CORRELATE. SECTION 106.1.1. |
| | |
| | 77. SHT P-600 RISER ST/11 DOES NOT REFLECT THE FLOOR |
| | PLAN AT THE OFFSET IN THE MEZZ. LEVEL & OFFSETS FOR |
| | ST/11 - STO/11. (SEE P-404A). PLEASE CORRELATE. SECTION |
| | 106.1.1. |
| | |
| | 78. SHT P-600 THE BRANCH CONNECTION FOR RISER ST/12 |
| | DOES NOT REFLECT THE FLOOR PLAN. PLEASE CORRELATE. |
| | SECTION 106.1.1. |
| | |
| | 79. SHT P-600 THE LOCATION OF STO/12 DOES NOT REFLECT |
| | THE FLOOR PLAN.. PLEASE CORRELATE. SECTION 106.1.1. |
| | |
| | 80. SHT P-600 RISER STO/13 STARTS OUT ON THE RIGHT SIDE |
| | OF ST/13 AT THE ROOF LEVEL BUT CROSSES TO THE LEFT SIDE |
| | AT THE MEZZ. LEVEL TO THE 1ST FLOOR. THE RISER DIAGRAM |
| | DOES NOT REFLECT THIS. PLEASE CLARIFY. PLEASE |
| | CORRELATE. SECTION 106.1.1. |
| | |
| | 81. SHT P-600 RISER STO/13 ALSO DOES NOT REFLECT THE |
| | FLOOR PLAN. (SHT P-101A). PLEASE CORRELATE. SECTION |
| | 106.1.1. |
| | |
| | 82. SHT P-600 RISER STO/14 IS SHOWN TO THE SOUTH SIDE |
| | OF ST/14 ON THE FLOOR PLAN. RISER DOES NOT REFLECT THE |
| | FLOOR PLAN. PLEASE CORRELATE. SECTION 106.1.1. |
| | |
| | 83. SHT P-600 RISERS ST/14 & STO/14 DO NOT REFLECT THE |
| | FLOOR PLAN AS IT SHOWS THE RISERS THRU THE 5TH FLOOR |
| | AND TO THE UPPER ROOF. THE FLOOR PLAN SHOWS THE ROOF |
| | DRAINS AT THE 2ND LEVEL LOWER ROOF. PLEASE CORRELATE. |
| | SECTION 106.1.1. |
| | |
| | 84. SHT P-601 CONDENSATE SHALL DRAIN SEPARATELY FROM |
| | THE BUILDING. SECTION 314.2.1. (SEE COMMENT # 17). |
| | |
| | 85. SHT P-601 CLEANOUTS REQUIRED PER SECTION 1101.8. |
| | PLEASE SHOW ALL REQUIRED C/O'S ON PLANS. |
| | |
| | 86. SHT P-601 THE PIPING AT THE BASE OF RISERS ST/6 - |
| | ST/7 DOES NOT REFLECT THE FLOOR PLAN. PLEASE CORRELATE. |
| | SECTION 106.1.1. |
| | |
| | 87. SHT P-601 CONDENSATE NOTE REFERS TO DWG P--103A, |
| | BUT NO RISER CONT. WAS FOUND. PLEASE INDICATE THE |
| | LOCATION OF THE RISER DIAGRAMS. SECTION 106.1.2. |
| | |
| | 88. SHT P-601 THE PIPING OUT OF THE CATCH BASIN TO |
| | RISERS ST/1 & ST/2 DOES NOT REFLECT THE FLOOR PLAN. |
| | PLEASE CORRELATE. SECTION 106.1.1. |
| | |
| | 89. A SEPARATE IRRIGATION PERMIT AND PLANS ARE |
| | REQUIRED. THIS CAN BE SUBMITTED AFTER BUILDING PERMITS |
| | ARE ISSUED BUT PRIOR TO COMMENCMENT OF IRR. WORK. |
| | (INFORMATIONAL). |
| | |
| | 90. A SEPARATE GAS PERMIT IS REQUIRED. THE FOLLOWING |
| | INFORMATION IS REQUIRED: |
| | |
| | A. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2004 |
| | FUEL GAS CODE.--RISER NOTED, BUT THE ISOMETRIC |
| | DRAWING DOES NOT REFLECT THE FLOOR PLAN AT THE WATER |
| | HEATERS AND AT THE DRYERS. ALSOTHE LENGTHS OF PIPE |
| | ARE NOT CLEAR AS INDICATED. PLEASE SHOW WHERE EACH |
| | SECTION OF PIPE BEGINS AND WHERE EACH SECTION OF PIPE |
| | ENDS.PLEASE CORRELATE. SECTION 106.1.1. |
| | |
| | B. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| | NUMBER OF CORRUGATED STAINLESS STEEL |
| | TUBING FOR EACH PIPE SIZE BEING USED.--THE PIPE |
| | SIZES FOR THE RUNS INDICATED AS "A", "C" & "E" ARE |
| | INCORRECT SIZES. RUN "A" SHALL BE 4", RUN "C" SHALL BE |
| | 2-1/2" AND RUN "E" SHALL BE 2-1/2" PER TABLE 402.4(6). |
| | |
| | C. TYPE OF GAS, (LP OR NATURAL). |
| | |
| | D. SHOW THE DISTANCE FROM THE POINT OF |
| | DELIVERY, (METER), TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| | FBC-2004 FUEL GAS CODE APPENDIX A - USE |
| | OF CAPACITY TABLES A.3.1(4). |
| | |
| | E. SUBMIT CALCULATIONS FOR COMBUSTION |
| | AIR (IF APPLICABLE) PER FBC-2004 FUEL |
| | GAS CODE SECTION 304. |
| | |
| | F. INDICATE THE DELIVERY PRESSURE (PSI) |
| | PER FBC-2004 FUEL GAS CODE SEC. 402.2. |
| | NATURAL GAS SPECIFY .5 PSI OR 2 PSI.--SHT P-602 |
| | INDICATES THE UTILITY COMPANY AS TECO GAS. THE GAS |
| | PROVIDER IN WEST PALM BEACH IS FLORIDA PUBLIC UTILITIES |
| | AND THEY PROVIDE THE GAS AT 1/2 PSI OR 2 PSI. PLEASE |
| | INDICATE THE PROPER PROVIDER AND INDICATE THE CORRECT |
| | DELIVERY PRESSURE. |
| | |
| | G. SUBMIT A DETAIL SHOWING THE TYPE, |
| | LOCATION, SIZE AND TERMINATION OF THE |
| | GAS VENTS PER FBC-2004 FUEL GAS CODE |
| | SECS. 502 THRU 505. |
| | |
| | H. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2004 FUEL GAS CODE SEC 402.2. |
| | |
| | I. CLEARLY SHOW THE LOCATION AND CAP- |
| | ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| | OR ASME), THE DISTANCE OF THE TANK FROM |
| | THE BUILDING AND ADJACENT PROPERTY LINES |
| | THE DISTANCE OF THE TANK FROM ALL SOUR- |
| | CES OF IGNITION, OTHER CONTAINERS, BUILD |
| | INGS, AND THE LOCATION OF ANY BUILDING |
| | OPENINGS BELOW THE RELIEF VALVE OF THE |
| | TANK PER NFPA 58, TABLE 3-2.2.2. |
| | |
| | J. CLEARLY INDICATE ON THE PLAN IF THE |
| | LP TANK IS ABOVE OR BELOW GROUND, AND |
| | SHOW REQUIRED PROTECTION OF THE TANK AND APPURTENANCES |
| | PER NFPA 58. IF THE TANK |
| | IS BELOW GROUND THE CONTAINER SHALL BE |
| | SECURILY ANCHORED PER NFPA 58 SECTION |
| | 3-2.2.7(H). |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE |
| | THE REVISION & REMOVE & REPLACE ANY |
| | PAGES AS NECESSARY. A TRANSMITTAL LETTER |
| | LISTING THE ORIGINAL REVIEW COMMENT NUMBER, |
| | WITH A DESCRIPTION OF THE REVISION MADE, IDENTIFYING |
| | THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND |
| | WILL HELP TO EXPEDITE YOUR PERMIT. REMOVE |
| | ALL VOID SHEETS FROM ALL PLANS AND PLACE |
| | ONE SET OF THEM LOOSELY ON TOP OF THE |
| | COLLATED PLANS TO BE REVIEWED. PLEASE RESUBMIT THE RED |
| | LINED PLUMBING SHEETS FROM THE FIRST REVIEW. THIS WILL |
| | HELP EXPEDITE THE PLUMBING/GAS PLAN REVIEW. |
| | THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |