2008-01-18 12:00:55REVIEW #: 1ST
 ACTION: DENIED
  
 FBC 2004 CODE FAMILY W/ 2007 SUPPLEMENTS
 FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH
  
 1. NO DETAIL OR INFORMATION COULD BE FOUND IN PLANS
 (STRUCTURAL OR MECHANICAL) REGARDING ATTACHMENT OF
 ROOFTOP APPLIANCES TO BUILDING STRUCTURE. MECHANICAL
 EQUIPMENT, APPLIANCES AND SUPPORTS THAT ARE EXPOSED TO
 WIND SHALL BE DESIGNED AND INSTALLED TO RESIST THE WIND
 PRESSURES ON THE EQUIPMENT AND THE SUPPORTS AS
 DETERMINED IN ACCORDANCE WITH FBC CHAPTER 16.
 ROOF-MOUNTED MECHANICAL UNITS AND SUPPORTS SHALL BE
 SECURED TO THE STRUCTURE IN ACCORDANCE WITH FBC, M
 301.13. PROVIDE DETAIL FOR CURB ATTACHMENT TO STRUCTURE
 AND APPLIANCE ATTACHMENT TO CURB WITH WIND LOAD
 CALCULATIONS FOR BUILDING PLAN REVIEW.
 NOTE: THE APPLIANCES THEMSELVES SHALL ALSO BE BUILT TO
 WITHSTAND WIND LOADS IN ACCORDANCE WITH THIS SECTION.
 PROVIDE MANUFACTURER?S SUBMITTAL DATA TO VERIFY
 APPLIANCES ARE SUITABLE FOR THE 140 MPH WIND ZONE.
 THESE REQUIREMENTS APPLY TO A/C UNITS AND EXHAUST
 FANS.
  
 2. PG M1.2 SHOWS CU-1 ON ROOF. NO OTHER INFORMATION
 COULD BE FOUND ON PLANS REGARDING THIS APPLIANCE OR ANY
 SPLIT SYSTEM. PLEASE CLARIFY. ALSO, IF A PRE-ENGINEERED
 A/C STAND IS USED FOR THIS CU, PRODUCT APPROVAL IS
 REQUIRED PER FAC RULE 9B-72. SUBMIT PRODUCT APPROVAL
 WITH INSTALLATION DETAIL FOR REVIEW.
  
 3. NO INFORMATION COULD BE FOUND ON PLANS REGARDING
 AUXILIARY OR SECONDARY DRAIN PROTECTION FOR RTU?S.
 AUXILIARY DRAIN PROTECTION IS REQUIRED FOR EACH COOLING
 OR EVAPORATOR COIL WHERE DAMAGE TO ANY BUILDING
 COMPONENTS WILL OCCUR AS A RESULT OF OVERFLOW FROM THE
 EQUIPMENT DRAIN PAN OR STOPPAGE IN THE CONDENSATE DRAIN
 PIPING IN ACCORDANCE WITH FBC, M 307.2.3.
 NOTE: FOR RTU?S A WATER-LEVEL DETECTION DEVICE THAT
 WILL SHUT OFF THE EQUIPMENT SERVED PRIOR TO OVERFLOW OF
 THE PAN MAY BE PROVIDED TO MEET THIS REQUIREMENT. THE
 WATER-LEVEL DETECTION DEVICE SHALL CONNECT TO THE DRAIN
 PAN AT A HIGHER LEVEL THAN THE PRIMARY DRAIN CONNECTION
 IN ACCORDANCE WITH FBC, M 307.2.3(2).
  
 ENERGY CODE (FBC CHAPTER 13):
  
 4. COMPLIANCE CHECKLIST ON PG 10 SHOWS COMPLIANCE WITH
 13-404.1 WITH AN R-19 ROOF DECK. THIS CORRESPONDS WITH
 DETAIL ON PG A4.2. HOWEVER, THIS DOES NOT CORRESPOND
 WITH THE INPUT DATA REPORT WHICH CALLS FOR R12.6. WHILE
 THIS IS ADEQUATE TO GENERATE A PASS ON THE COMPLIANCE
 FORM, IT IS NOT THE MINIMUM REQUIRED UNDER
 13-410.1.ABC.3.6 AND IT DOES NOT CORRESPOND WITH
 ARCHITECTURAL DETAIL #4 ON PG A4.2. PLEASE CORRECT AND
 RESUBMIT IN ACCORDANCE WITH FBC 13-103.2.
  
 5. WALL SECTIONS ON PG A4.2 SHOW DRYWALL STOPPING 6?
 ABOVE THE CEILING. THIS WOULD LEAVE EXPOSED CONCRETE
 BLOCK ABOVE THE CEILING WHICH IS BEING USED AS A
 PLENUM. BUILDING CAVITIES WHICH WILL BE USED AS RETURN
 AIR PLENUMS SHALL BE LINED WITH A CONTINUOUS AIR
 BARRIER MADE OF DURABLE NONPOROUS MATERIALS IN
 ACCORDANCE WITH FBC 13-410.1.ABC.3.6. PLEASE SEE
 13-410.1.ABC.3.7.1 FOR A LIST OF APPROVED AIR
 BARRIERS.
  
 6. COOLING LOAD CALCULATIONS ARE REQUIRED TO BE
 ATTACHED TO THE ENERGY CALCULATIONS FOR SYSTEM SIZING
 IN ACCORDANCE WITH FBC 13-407.1.ABC.1. PROVIDE THESE OR
 A SIGNED AND SEALED SYSTEM SIZING SUMMARY AS DESCRIBED
 IN EXCEPTION #1 OF THIS SECTION.
  
 IF YOU HAVE ANY QUESTIONS PLEASE CONTACT:
 RONALD J. REGUEIRO
 561.805.6719
 [email protected]