| 2008-04-23 18:36:15 | |
| | |
| | DENIED |
| | |
| | THE FOLLOWING COMMENTS WERE NOT FULLY ADDRESSED IN THE |
| | 1ST AND 2ND REVIEWS |
| | |
| | 6)SUBMIT 2 COPIES OF ENGINEERED TRUSS DRAWINGS THAT |
| | COMPLY WITH R802.10.1 FBC WITH PERMIT APPLICATION OR |
| | BEFORE INSTALLATION THAT HAVE BEEN REVIEWED AND |
| | APPROVED BY THE DESIGNER OF RECORD. *******THE DRAWINGS |
| | SUBMITTED ARE NOT SIGNED AND SEALED BY THE TRUSS |
| | MANUFACTURERS ENGINEER, PLEASE HAVE ENGINEERED SETS |
| | THAT ARE REVIEWED AND APPROVED BY YOUR DESIGNER OF |
| | RECORD AVAILABLE TO INSPECTOR PRIOR TO TRUSS |
| | ERECTION******** |
| | |
| | ******PLEASE NOTE THAT THE TRUSS ENGINEERING THAT HAS |
| | BEEN SUBMITTED IS A LAYOUT SET ONLY, THE REQUIRED SETS |
| | SHALL HAVE ALL LOADS PRESENT TO MATCH PERMIT DRAWINGS |
| | AND THE DESIGNED UPLIFTS AT TRUSS BEARING POINTS ETC. |
| | IF NOT SUBMITTED AT PLAN REVIEW MAY BE PROVIDED TO SITE |
| | INSPECTOR PRIOR TO TRUSS ERECTION****** |
| | |
| | 10)THE PERMIT APPLICATION SHALL INCLUDE TWO COPIES OF |
| | EACH PRODUCT APPROVAL THAT IS RELEVANT PER 9B-72. THESE |
| | SHOULD INCLUDE THE FLORIDA STATE APPROVAL COVER PAGES. |
| | ALL CAN BE FOUND ON WWW.FLORIDABUILDING.ORG ******NO |
| | PRODUCT APPROVALS WERE SUBMITTED FOR MULLIONS, AND |
| | CONNECTORS AND STRAPS. IN LUE OF PRODUCT APPROVALS |
| | STRAPS/CONNECTORS MAY BE LISTED IN A SCHEDULE ON THE |
| | DRAWINGS COMPLETE WITH THE STATEWIDE PRODUCT APPROVAL |
| | NUMBERS OR SUBMIT SIMPSON TIE'S COMPLETE FLORIDA INDEX |
| | WITH CONNECTORS TO BE USED HIGHLIGHTED****** |
| | |
| | ********NO APPROVALS WERE SUBMITTED FOR WINDOW #1 |
| | MULLIONS WHERE 2 SINGLE HUNG UNITS ARE |
| | INSTALLED******** |
| | |
| | 13)PRODUCT APPROVALS WERE SUBMITTEDEASTERN METAL |
| | SUPPLY,CIRCLE THE METHOD THAT WILL BE USED TO MOUNT |
| | THE PANELS AND FILL OUT A SHUTTER SCHEDULE WITH KEY |
| | PLAN FOR THE OPENINGS PER WEST PALM BEACH MEMO (SEE |
| | ATTACHED) *******INFORMATION AND SCHEDULE WERE INSERTED |
| | WITH FIRST REVIEW COMMENTS, PRODUCT APPROVALS WERE NOT |
| | MARKED WITH INSTALLATION METHOD AND NO INSTALLATION |
| | SCHEDULE HAS BEEN PROVIDED******** |
| | |
| | *********THE FOLLOWING PROBLEMS REQUIRE ATTENTION ON |
| | THE SHUTTER SCHEDULE******** |
| | 1)THESH24 WINDOWS ARE 37" X 50 5/8" WITH 3 1/2" |
| | EDGE DISTANCE X 2 = 7" PLUS APPROX 1" CLEARANCE X 2 THE |
| | SHUTTER SPANS WOULD BE APPROX 60" NOT 46" AS STATED |
| | |
| | 2) THE #1 WINDOW IS 2 - SH24 WINDOWS THEREFORE THE |
| | WINDOW OPENING WOULD BE APPROX 6'-2" IN WIDTH NOT 3'-0" |
| | AS NOTED ON SCHEDULE |
| | |
| | 3)TOTAL OPENINGS ON THE DRAWING IS 5 BUT SCHEDULE AND |
| | ENGINEERING WIND LOAD SHEET SPECIFY 6, ALSO 3 WINDOWS |
| | AND 2 DOORS ON DRAWINGS WHILE SCHEDULE/ENGINEERING HAS |
| | 2 WINDOWS AND 4 DOORS |
| | |
| | *******NEW COMMENT****** |
| | |
| | 1)A DESIGN PROFESSIONAL THAT IS REGISTERED TO |
| | PRACTICE UNDER CHAPTER 481 OR 471 OF THE FLORIDA |
| | STATUTES SHALL AFFIX THEIR OFFICIAL SEAL, SIGNATURE AND |
| | DATE TO SAID DRAWINGS AND SPECIFICATIONS PER 106.1 FBC |
| | 2004. ONE SET IS MISSING SEAL,SIGNATURE AND DATE. |
| | |
| | BLDG PLAN REVIEW |
| | ADRIAN MORSE |
| | 561-805-6716 |