| Date |
Text |
| 2007-12-11 12:13:52 | DENIED |
| | REFERENCE: FBC-2004 PLUMBING |
| | FBC-2004 BUILDING |
| | FBC-2004 CHAPTER 1 |
| | FBC-2004 CHAPTER 11 |
| | |
| | 1. SHT A-1 ROOM FINISH INDICATES PAINTED GWB. PAINTED |
| | GWB DOES NOT MEET THE REQUIREMENT FOR A HARD SURFACE |
| | REQUIRED IN SECTION 1210.2. (SMOOTH, HARD, NONABSORBENT |
| | SURFACE REQUIRED). PLEASE SHOW COMPLIANCE. |
| | |
| | 2. SHT A-1 PER TABLE 403.1 A DRINKING FOUNTAIN IS |
| | REQUIRED. PLEASE INDICATE THE LOCATION. |
| | |
| | 3. SUBMIT A DETAIL FOR THE DRINKING FOUNTAIN SHOWING |
| | COMPLIANCE WITH SECTION 11-4.15 WITH ALL SUBSECTIONS AS |
| | WELL AS SECTION 11-4.1.3(10)(A) PROVISIONS FOR THOSE |
| | WHO HAVE DIFFICULTY BENDING OR STOOPING UNLESS THE |
| | DRINKING FOUNTAIN IS A HI/LOW UNIT. |
| | |
| | 4. SHT A-1 SHOW COMPLIANCE WITH THE FOLLING: ___FOR |
| | W/C: |
| | A. 11-4.16.5 FLUSH CONTROLS |
| | ___FOR LAV: |
| | A. 11-4.19.2 CLEARANCE |
| | B. 11-4.19.4 EXPOSED PIPES & SURFACES |
| | *W/C SHALL BE 1'6" OFF THE WALL TO THE CENTERLINE OF |
| | THE FIXTURE, AND THE LAV SHALL BE A MINIMUM OF 15" OFF |
| | THE WALL TO THE CENTERLINE OF THE FIXTURE. SEE FIG. |
| | 28. |
| | |
| | 5. SHT P2.1 SUBMIT THE MANUFACTURE SPECIFICATIONS AND |
| | INSTALLATION INSTRUCTIONS FOR THE VACUUM SANITARY |
| | SYSTEM AS WELL AS FOR THE VACUUM VALVE ASSEMBLY. |
| | SECTIONS 301.7, 303.1, 303.2 & 303.4. |
| | |
| | 6. SHT P2.1 THE FLOOR PLAN AND THE SANITARY RISER |
| | DIAGRAM SHALL SHOW THE CLEANOUT REQUIRED BY SECTION |
| | 708.3.5, NEAR THE JUNCTION OF THE BUILDING DRAIN AND |
| | THE BUILDING SEWER. PLEASE SHOW ON THE FLOOR PLAN AND |
| | THE RISER DIAGRAM. |
| | |
| | 7. SHT P2.1 AN RPZV BACKFLOW IS REQUIRE ON THE WATER |
| | SUPPLY TO THE BUILDING. SECTION 608.13.2. PLEASE SHOW |
| | OR INDICATE ON THE WATER RISER DIAGRAM. |
| | |
| | 8. SHT P2.1 WATER RISER DIAGRAM. THE WATER HAMMER |
| | ARRESTORS SHALL BE LOCATED NEAR THE FIXTURES IN AN |
| | "EFFECTIVE RANGE" NOT IN THE CEILING AS SHOWN. PDI-WH |
| | 201 AND MANUF. INSTALLATION INSTRUCTIONS. |
| | |
| | 9. ENERGY CALCULATION SHALL BE SIGNED, SEALED AND DATED |
| | BY THE DESIGN PROFESSIONAL. SECTION 13-103. THE OWNER'S |
| | AGENT SHALL ALSO SIGN THE CALCULATIONS.--NO |
| | INFORMATION IS GIVEN FOR THE INSTA HOT WATER HEATER. |
| | PLEASE SHOW REQUIREMENTS FOR THE WATER HEATER. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE |
| | THE REVISION & REMOVE & REPLACE ANY |
| | PAGES AS NECESSARY. A TRANSMITTAL LETTER |
| | LISTING THE ORIGINAL REVIEW COMMENT NUMBER, |
| | WITH A DESCRIPTION OF THE REVISION |
| | MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND |
| | WILL HELP TO EXPEDITE YOUR PERMIT. REMOVE ALL VOID |
| | SHEETS FROM ALL PLANS AND PLACE ONE SET OF THEM LOOSELY |
| | ON TOP OF THE COLLATED PLANS TO BE REVIEWED. THANK YOU |
| | FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |