| 2007-12-12 13:22:30 | FAILED FOR FOLLOWING REASONS: |
| | |
| | 1. PLEASE PROVIDE A COPY OF NOTICE OF INTENT (NOI). |
| | PLEASE APPLY AT FDEP, NPDES STORMWATER SECTION FOR |
| | NOI. |
| | YOU CAN GET NOI INFO FROM |
| | WWW.DEP.STATE.FL.US/WATER/STORMWATER/NPDES/ |
| | NOTICE OF INTENT DEP FORM 62-621.300(4)(B), |
| | EFFECTIVE MAY 1, 2003 |
| | |
| | 2. PLEASE SHOW ON DRAWING ALL CITY STANDARDS NOTES FOR |
| | SIDEWALK, DRIVEWAY, APPROACH, PARKINGS, HANDICAP |
| | PARKINGS, DUMPSTER ENCLOSURE, YOU CAN GET A C D FOR ALL |
| | CITY STANDARDS NOTES FROM 1000, 45 STREET, ENGINEERING |
| | SERVICES, PHONE# 494-1040 |
| | |
| | 3. PLEASE SHOW ON DRAWINGSDUMPSTER & ITS ENCLOSURE |
| | DETAILS PER CITY OF WPB, &LOCATION ON DWG, LOCATION |
| | MUST BE ACCESSIBLE FOR PICKUP TRUCK. |
| | |
| | 4. PLEASE SHOW ON CALCULATION THAT YOU HAVE CONSIDERED |
| | FLOOD ZONE AREA, & 5,10, 25, 100 YEAR FLOOD CRITERIA |
| | AND CROWN OF THE ROAD WHEN YOU DETERMINE THE FIRST |
| | FLOOR ELEVATION. FIRST FLOOR ELEVATION SHOULD BE |
| | ATLEAST 1 FOOT HIGHER THAN HIGHEST CROWN OF THE ROAD. |
| | |
| | 5. PLEASE SHOW ON DRAINAGE DRAWINGTHE SITE AREA, |
| | GREEN, LAKE,PARKING AREA, IMPERVIOUS,PERVIOUS AREAYOU |
| | ARE DEVELOPING FOR THIS PROJECT . PLEASEMAKE SURE |
| | THESE AREAS SHOWN ON DRAINAGE DRAWINGS MUST MATCH WITH |
| | AND USED IN STORM WATER QUALITY CALCULATIONS. PLEASE |
| | PROVIDE A COPY OF THESE CALCULATIONS. |
| | |
| | 6. PLEASE SHOW ALL STORM WATER PIPES AROUND YOUR SITE |
| | SO, WE CANSEE THE LAYOUT OF STORM WATER PIPES FROM |
| | ALL OTHER STORM WATER PIPES. PLEASE SHOW DETAIL OF THE |
| | CONTROL STRUCTURESWITH ELEVATIONS, NOTCHES, BLEEDING |
| | ELEVATION, ETC ON DRAWINGS, CALCULATION FOR |
| | EXFILTRATION TRENCHES, PLEASE SHOW DRY DETENTION/WET |
| | DETENTION AREAS IN STORM WATER CALS IF YOU HAVE ALL |
| | THESE. |
| | |
| | 7. ALSO PLEASE SHOW ALL CATCH BASINS NEAREST,AROUND |
| | YOUR SITE FOR STORM WATER DRAIN SO YOUR SITE DO NOT GET |
| | FLOODED AND HAVE ENOUGH DRAINS. |
| | |
| | 8. PLEASE PROVIDE A COPY OF SFWMD PERMIT,, &STORM |
| | WATER QUALITY CALCULATIONS. STORM WATER CALS MUST BE |
| | APPROVED FROM 100045TH STREET ENGINEERING SERVICES. |
| | |
| | 9. PLEASE SHOW ON DRAWINGS THE POLLUTION PREVENTION |
| | DETAILS,CLOTHES USED FOR SILT ETC., PLANS SHOWING SILT |
| | FENCE AROUND THE SITE & CATCH BASINS DURING |
| | CONSTRUCTION AND ALL DEMOLITION PHASE.HEIGHT OF FENCE |
| | SHOULD BE HIGH ENOUGH PER FDEP TO STOP DUST PARTICLES. |
| | |
| | 10. WATER & SEWER PLANS MUST BE APPROVED FROM 45TH |
| | STREET (MANNY G.), UTILITY DEPT BEFORE WE APPROVED. |
| | |
| | PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR |
| | PERMITTING PROCESS |
| | |
| | RASIK CHOKSHI805-6723 |