| Date |
Text |
| 2008-05-22 10:52:15 | 1. SUBMIT A REVISED TREE ALTERATION APPLICATION WITH |
| | TWO (2) COPIES OF THE LANDSCAPE PLAN.ADDITIONAL TREES |
| | WILL NEED TO BE REMOVED AND REPLACED, BASED UPON |
| | OBSERVATIONS MADE DURING THE MOST RECENT SITE VISIT. |
| | THE SPACING BETWEEN TREES AROUND THE ENTIRE PERIMETER |
| | OF THE SITE SHALL NOT EXCEED 30 FEET.THE LANDSCAPE |
| | PLAN SHALL SHOW THE FINAL LOCATION OF ALL TREES, SHRUBS |
| | AND GROUND COVER. |
| | |
| | 2. THERE ARE CONFLICTS BETWEEN UTILITIES AND PROPOSED |
| | TREES.UTILITIES SHALL BE KEPT OUT OF THE ISLANDS AND |
| | STREET LIGHTS SHALL BE CENTERED BETWEEN PROPOSED TREES. |
| | |
| | |
| | 3. THE PROPOSED YELLOW TABEBUIA TREES SHALL BE CHANGED |
| | TO ANOTHER TREE SPECIES BECAUSE THIS TREE SPECIES IS |
| | KNOWN TO HAVE A VERY WEAK ROOT SYSTEM. YELLOW TABEBUIA |
| | TREES TEND TO BLOW OVER IN ANY WIND STORM. |
| | |
| | 4. PLEASE PAY PARTICULAR ATTENTION TO THE LANDSCAPING |
| | AT THE ENTRANCE AND IN THE CORNERS OF THE SITE.THE |
| | LANDSCAPING NEEDS TO BE UPGRADED IN THESE AREAS.THE |
| | PALM GROUPINGS SHALL BE UNDER PLANTED WITH SHRUBS AND |
| | GROUND COVER. |
| | |
| | 5. THE IRRIGATION SYSTEM SHALL BE COMPLETELY FUNCTIONAL |
| | AND PROVIDE 100% COVERAGE TO ALL LANDSCAPE AREAS, |
| | INCLUDING THE RIGHT-OF-WAY.SOD AND IRRIGATION SHALL |
| | EXTEND TO THE NORTHEAST TIP OF THE SITE. |
| | |
| | 6. PURSUANT TO SECTION 94-443(C)(3)(A), EACH TERMINAL |
| | LANDSCAPE ISLAND SHALL CONTAIN AT LEAST ONE SHADE OR |
| | FLOWERING TREE.A TREE IS REQUIRED IN THE LANDSCAPE |
| | ISLAND THAT TERMINATES THE PARKING ROW ALONG THE EAST |
| | PERIMETER OF THE SITE AT THE SOUTH END. |
| | |
| | FOR QUESTIONS OR COMMENTS PLEASE CONTACT: BOBBY POWELL |
| | JR., PLANNER, (561) 822-1401. |