Plan Review Notes
Plan Review Notes For Permit 07100215
Permit Number 07100215
Review Stop G
Sequence Number 1
Notes
Date Text
2007-10-26 13:35:59DENIED
 REFERENCE:
 ** FBC-2004 WITH 05 & 06 REVISIONS, FUEL GAS.
 ** THE CITY OF WEST PALM BEACH GAS PERMIT APPLICATION
 REQUIREMENTS.
 ** FBC-2004 CHAPTER 1, THE CITY OF
 WEST PALM BEACH AMENDMENTS.
 ** FLORIDA ADMINISTRATIVE CODE (FAC).
 ** FLORIDA STATUTES (FS).
  
 THE FOLLOWING CORRECTIONS/INFORMATION ARE REQUIRED FOR
 GAS/PLUMBING PLAN REVIEW TO MEET CODE COMPLIANCE:
  
 1. PROVIDE TWO COPIES OF A SITE PLAN OR SURVEY THAT
 CLEARLY INDICATES THE PROPOSED LOCATION OF THE
 GENERATOR INDICATING ALL DIMENSIONS FROM PROPERTY LINES
 AND DISTANCES FROM ADJACENT DWELLING STRUCTURES.
  
 2. PROVIDE MANUFACTURER'S SPECIFICATIONS FOR THE
 PROPOSED GENERATOR INDICATING RECOMMENDED SET BACKS
 FROM STRUCTURES.
  
 3. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2004
 FUEL GAS CODE.
 **NOTE: THE ONLY CORRESPONDING LENGTH INDICATED ON THE
 DRAWING IS FOR THE 25' OF UNDERGROUND 1/2" PE PIPING.
 WHAT ARE THE CORRESPONDING LENGTHS TO THE ABOVE GROUND
 PIPING? WHERE IS THE 1ST STAGE REGULATOR AT THE TANK
 AND ITS MODEL NUMBER ON THE ISOMETRIC DRAWING? PLEASE
 CLEARLY INDICATE THESE ITEMS ON THE RESUBMITTED
 ISOMETRIC.
  
 4. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE BEING USED.
 **NOTE: THE ONLY PIPING MATERIAL INDICATED ON THE
 DRAWING IS FOR THE UNDERGROUND PE PIPING. WHAT IS THE
 PIPING MATERIAL FOR THE ABOVE GROUNDGAS PIPE? PLEASE
 CLEARLY INDICATE THIS ON THE RESUBMITTED ISOMETRIC.
  
 5. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2004 FUEL GAS CODE SEC 402.2.
 **NOTE: THE SUBMITTED MANUFACTURER SPECIFICATION SHEETS
 FOR THE 2ND STAGE REGULATOR DOES NOT INDIDATE THE MAKE,
 MODEL NUMBER DOES NOT MATCH REGULATOR ON DRAWING, AND
 DOES NOT INDICATE A LISTING FROM A NATIONALLY
 RECOGNIZED TESTING LABORATORY. PLEASE INDICATE THESE
 REQUIREMENTS ON THE RESUBMITTAL AS WELL AS FOR THE
 REQUIRED 1ST STAGE REGULATOR AT THE TANK.
  
 6. CLEARLY SHOW THE LOCATION AND CAP-
 ACITY OF LP TANK(S), TYPE OF TANK (DOT
 OR ASME), THE DISTANCE OF THE TANK FROM
 THE BUILDING AND ADJACENT PROPERTY LINES
 THE DISTANCE OF THE TANK FROM ALL SOUR-
 CES OF IGNITION, OTHER CONTAINERS, BUILD
 INGS, AND THE LOCATION OF ANY BUILDING
 OPENINGS BELOW THE RELIEF VALVE OF THE
 TANK PER NFPA 58, TABLE 3-2.2.2.
 **NOTE: THE SUBMITTED SURVEY ARE NOT LEGIBLE, PLEASE
 PROVIDE TWO (2) COPIES OF A CURRENT, LEGIBLE SURVEY OR
 SITE PLAN SHOWING THE LOCATION OF THE PROPOSED 500 GAL
 U/G LP TANK CLEARLY INDICATING THE ABOVE REQUIRED
 INFORMATION. PER 106.1.2, ADDITIONAL INFORMATION
 REQUIRED.
  
 7. INDICATE HOW THE U/G TANK SHALL BE SECURLY ANCHORED
 PER NFPA 58 SECTION 6.6.1.
  
 END OF COMMENTS:
  
 REVIEW BY: MIKE PERSON
 PLUMBING PLANS EXAMINER
 (561) 805-6730
 FAX (561) 805-6731
 E-MAIL: [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved