Plan Review Notes
Plan Review Notes For Permit 07100204
Permit Number 07100204
Review Stop G
Sequence Number 1
Notes
Date Text
2007-10-26 10:22:11DENIED
 REFERENCE:
 ** FBC-2004 WITH 05 & 06 REVISIONS, FUEL GAS.
 ** THE CITY OF WEST PALM BEACH GAS PERMIT APPLICATION
 REQUIREMENTS.
 ** FBC-2004 CHAPTER 1, THE CITY OF
 WEST PALM BEACH AMENDMENTS.
 ** FLORIDA ADMINISTRATIVE CODE (FAC).
 ** FLORIDA STATUTES (FS).
  
 THE FOLLOWING CORRECTIONS/INFORMATION ARE REQUIRED FOR
 GAS PLAN REVIEW TO MEET CODE COMPLIANCE:
  
 1. PLEASE SUBMIT TWO COPIES OF A SITE PLAN INDICATING
 THE PROPOSED GENERATOR LOCATION INDICATING ALL
 DIMENTIONS FROM PROPERTY LINES AND DWELLINGS ON THE
 RESUBMITTAL.
  
 2. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2004
 FUEL GAS CODE.
  
 3. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE BEING USED.
  
 4. TYPE OF GAS, (LP OR NATURAL)
  
 5. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 THE FBC-2004 FUEL GAS CODE SECS. 401.8
 THRU 402.6.1 AND TABLES 402.4(1) THRU
 402.4(33).
 **NOTE: THIS INCLUDES THE EXISTING GAS SYSTEM, PLEASE
 REFERENCE THE PERMIT INFORMATION ATTACHED TO THE GAS
 COMMENTS INDICATING EXISTING GAS TO SAID RESIDENCE.
  
 6. SHOW THE DISTANCE FROM THE POINT OF
 DELIVERY, (METER), TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM PER
 FBC-2004 FUEL GAS CODE APPENDIX A - USE
 OF CAPACITY TABLES A.3.1(4).
 **NOTE: THIS INCLUDES THE EXISTING GAS SYSTEMS LONGEST
 LENGTH.
  
 7. INDICATE THE DELIVERY PRESSURE (PSI)
 PER FBC-2004 FUEL GAS CODE SEC. 402.2.
 NATURAL GAS SPECIFY .5 PSI OR 2 PSI.
  
 8. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2004 FUEL GAS CODE SEC 402.2.
 **NOTE: IF GAS DELIVERY PRESSURE IS 2 PSI OR GREATER
 PLEASE SUBMIT TWO COPIES OF MANUFACTURE SPECIFICATION
 SHEETS OF THE MP REGULATOR INDICATING THE MAKE, MODEL
 NUMBER, BTU LOAD CAPACITY, AND A LISTING FROM A
 NATIONALLY RECOGIZED TESTING LABORATORY.
  
 9. CLEARLY SHOW THE LOCATION AND CAP-
 ACITY OF LP TANK(S), TYPE OF TANK (DOT
 OR ASME), THE DISTANCE OF THE TANK FROM
 THE BUILDING AND ADJACENT PROPERTY LINES
 THE DISTANCE OF THE TANK FROM ALL SOUR-
 CES OF IGNITION, OTHER CONTAINERS, BUILD
 INGS, AND THE LOCATION OF ANY BUILDING
 OPENINGS BELOW THE RELIEF VALVE OF THE
 TANK PER NFPA 58, TABLE 3-2.2.2.
  
 10. CLEARLY INDICATE ON THE PLAN IF THE
 LP TANK IS ABOVE OR BELOW GROUND, AND
 SHOW REQUIRED PROTECTION OF THE TANK AND APPURTENANCES
 PER NFPA 58. IF THE TANK
 IS BELOW GROUND THE CONTAINER SHALL BE
 SECURILY ANCHORED PER NFPA 58 SECTION
 3-2.2.7(H).
  
 11. FBC-2004 CHAPTER 1,SECTION 106.3.4.3:
 THE PERSON RESPONSIBLE FOR THE DESIGN OF
 THE DRAWING SHALL CLEARLY PRINT AND SIGN
 NAME, AND ALSO DATE DRAWING. PLEASE DO
 THIS PRIOR TO RESUBMITTING.
  
 END OF COMMENTS:
  
 REVIEW BY: MIKE PERSON
 PLUMBING PLANS EXAMINER
 (561) 805-6730
 FAX (561) 805-6731
 E-MAIL: [email protected]
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved