| Plan Review Notes For Permit 07100119 |
| Permit Number |
07100119 |
|
| Review Stop |
E |
| Sequence Number |
4 |
|
| Notes |
| Date |
Text |
| 2007-12-28 11:11:15 | NOTE ADDED, PLANS ROUTED TO ZONING AS SETS HAVE NEW | | | SHEETS A-1 AND A-3, NEEDS NEW STAMPS. | | 2007-12-28 11:10:18 | | | | *** PROVISO/REVISION *** | | | | | | ** PLEASE SEE THE FOLLOWING ITEMS WHICH ARE TO BE | | | REVISED BEFORE ANY ROUGH ELECTRICAL INSPECTION. | | | | | | 1) NOTE: PLEASE SEE THE MAXIMUM TIME ON OVER RIDE | | | OCCUPANCY SENSOR IS 30MINS. SHOWN AS MINIMUM TIME. | | | 13-415.1.ABC.1.1, .1.2 | | | | | | 2) NOTE: PLEASE REVISE PANEL SCHEDULE ON M/E SHEET | | | SHOWING THE CORRECTED MAIN CIRCUIT BREAKER, PANEL SIZE | | | AND BRANCH CIRCUITS. | | | THE CONDUCTORS NOW SHOWN ON PANEL SCHEDULE FOR RTU IS | | | NOT THE SAME AS RISER. RISER SHOWS #4 AND PANEL | | | SCHEDULE NOW SHOWS #2. | | | 240.4, 310.16, 408.4 | | | | | | 3) NOTE: PLEASE SEE BATH ROOMS WHICH STILL SHOW ONLY | | | STANDARD SWITCHES. PLEASE KNOW IF THESE ARE NEW MUST | | | MEET 13-415.1ABC.1.2. | | | | | | 4) NOTE: 200AMP MAIN CIRCUIT BREAKER ON NEW PANEL. | | | 240.4, 310.16, 240.21, 408.36 ETC | | | THIS WAS CHANGED BY ENGINEER HOWEVER SHEETS NEED TO BE | | | RE-PRINTED. | | | | | | | | | IF THERE ARE ANY QUESTIONS ON THE ABOVE PLEASE DO NOT | | | HESITATE IN CONTACTING THIS REVIEWER DIRECTLY. | | | | | | DEWEY PALMER | | | ELECTRICAL PLAN REVIEW II | | | CONSTRUCTION SERVICES DEPARTMENT | | | CITY OF WEST PALM BEACH | | | 561-805-6717 | | | [email protected] |
|