2008-05-20 11:16:42REVIEW #: 2ND **PLAN CHECK ONLY**
 ACTION: DENIED
  
 FBC 2004 CODE FAMILY W/ 2007 SUPPLEMENTS
 FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH
  
 THE FOLLOWING COMMENTS ARE NUMBERED TO CORRESPOND WITH
 PREVIOUS REVIEW COMMENTS AS WELL AS DESIGNER'S WRITTEN
 RESPONSES FOR THE PURPOSE OF CONTINUITY.
  
 1. THERE ARE TWO SEPARATE PLANS FOR THE NEW AND
 EXISTING BUILDINGS. ARE THESE TO BE DONE UNDER SEPARATE
 PERMITS? THERE ARE TWO DIFFERENT PAGES NUMBERED M-1 AND
 M-2 AND THEY COVER DIFFERENT SCOPES OF WORK. PLEASE
 CLARIFY. ALSO, THE LEVEL OF ALTERATION COULD NOT BE
 FOUND ON PLANS. THE DESIGN PROFESSIONAL SHALL DECLARE
 THE LEVEL OF ALTERATION IN ACCORDANCE WITH FBCEB
 301.5.
  
 2. WRITTEN RESPONSE TO THIS COMMENT INDICATES THAT
 THERE ARE NO DUCTWORK PENETRATIONS OF RATED WALL
 ASSEMBLIES ON THIS PROJECT. THIS STATEMENT IS IN
 CONFLICT WITH THE INFORMATION ON PAGES LS-1.0 AND M-2.
 PAGE LS-1.0 SHOWS THE WALL BETWEEN THE MULTI-PURPOSE
 ROOM AND THE ENTRANCE HALLWAY TO BE 1-HOUR FIRE
 RESISTANCE RATED. PAGE M-2 SHOWS AT LEAST TWO TYPE J
 AIR TRANSFER OPENINGS IN THIS RATED WALL.
  
 ADDITIONALLY, THE ENTRANCE HALLWAY IS SERVING AS AN
 EXIT ACCESS CORRIDOR FOR THE ASSEMBLY OCCUPANCY IN THE
 MULTI-PURPOSE ROOM. THIS CORRIDOR IS REQUIRED TO BE
 1-HOUR FIRE RESISTANCE RATED IN ACCORDANCE WITH FBCB
 TABLE 1016.1. THIS WOULD REQUIRE BOTH SIDES OF THE
 CORRIDOR TO BE FIRE RESISTANCE RATED. THERE ARE
 MULTIPLE DUCT PENETRATIONS IN THE WALL ON THE OTHER
 SIDE OF THE CORRIDOR IN ADDITION TO THE AIR TRANSFER
 OPENINGS MENTIONED ABOVE. ALL OF THESE OPENINGS AND
 PENETRATIONS OF THE RATED CORRIDOR WALLS ARE REQUIRED
 TO BE PROTECTED IN ACCORDANCE WITH FBCM 607.5.
 NOTE: DUCT PENETRATIONS AND AIR TRANSFER OPENINGS IN
 FIRE-RESISTANCE RATED CORRIDORS ARE REQUIRED TO BE
 PROTECTED WITH FIRE AND SMOKE DAMPERS IN ACCORDANCE
 WITH FBCM 607.5.4 AND FBCB 715.3.3. SHOW HOW THESE
 OPENINGS AND PENETRATIONS ARE TO BE PROTECTED IN
 ACCORDANCE WITH THESE SECTIONS. ALSO, SHOW HOW THESE
 SMOKE DAMPERS ARE TO BE ACTUATED IN ACCORDANCE WITH
 FBCM 607.5.4.1.
  
 3. PAGE M-1 OUTSIDE AIR CALCULATIONS STATE "BASED ON
 ASHRAE 62.1-2007." THIS IS A STANDARD WHICH IS NOT
 REFERENCED OR ADOPTED IN THE 2004 FBCM. THE CURRENT
 ADOPTED STANDARD IS ASHRAE 62.1-2004. VENTILATION
 SYSTEMS SHALL BE DESIGNED IN ACCORDANCE WITH THIS
 STANDARD OR FBCM 403.3 AND NOT BY A STANDARD WHICH HAS
 NOT BEEN ADOPTED BY CODE. PLEASE CORRECT AND RESUBMIT.
  
 NOTE: ACCORDING TO ASHRAE 62.1-2004 TABLE 6.1, A
 MULTI-USE ASSEMBLY SPACE REQUIRES 7.5 CFM PER PERSON
 AND HAS AN OCCUPANT LOAD OF 100 PEOPLE PER 1000 SQ.FT.
 PAGE LS-1.0 SHOWS THIS SPACE AT 4501 SQ.FT. WHICH WOULD
 GIVE AN OCCUPANT LOAD OF 450 PEOPLE. THE OCCUPANT LOAD
 SHALL BE BASED ON SQUARE FEET OF FLOOR AREA AND NOT
 SEATING AS THE SEATING IN THIS AREA IS NOT FIXED.
 PLEASE VERIFY ALL VALUES IN THE OUTSIDE AIR
 CALCULATIONS ARE IN CONFORMANCE WITH TABLE 6.1 AND
 ADJUST CALCULATIONS AS NEEDED IN ACCORDANCE WITH FBCM
 403.4.
  
 4. OK
  
 5. OK
  
 6. ROOF VENTILATOR DETAIL, THERE IS NO INFORMATION
 REGARDING THE SIZE AND TYPE OF FASTENERS USED TO ATTACH
 THE VENTILATOR TO THE CURB. THERE IS ALSO NO
 INFORMATION REGARDING THE TYPE AND SIZE OF FASTENERS
 USED TO ATTACH THE CURB TO THE STRUCTURE. IF WOOD
 NAILERS ARE USED FOR THE CURB, THEN INFORMATION IS
 NEEDED ON THE NAILERS, SUCH AS SIZE AND TYPE OF NAILER,
 HOW THE NAILER IS ATTACHED TO THE STRUCTURE. ALSO,
 PROVIDE INFORMATION FROM THE MANUFACTURER SHOWING THE
 VENTILATOR IS DESIGNED TO WITHSTAND ANTICIPATED WIND
 PRESSURES. MECHANICAL EQUIPMENT, APPLIANCES AND
 SUPPORTS THAT ARE EXPOSED TO WIND SHALL BE DESIGNED AND
 INSTALLED TO RESIST THE WIND PRESSURES ON THE EQUIPMENT
 AND THE SUPPORTS AS DETERMINED IN ACCORDANCE WITH THE
 FLORIDA BUILDING CODE, BUILDING PER FBCM 301.13.
 SUFFICIENT DETAIL AND INFORMATION SHALL BE PROVIDED FOR
 BUILDING PLAN REVIEW TO DETERMINE COMPLIANCE WITH FBCB
 SECTIONS 1604 AND 1609.
  
 7. IT IS UP TO THE DESIGNER TO DETERMINE THE SIZE,
 NUMBER AND SPACING OF FASTENERS NEEDED TO SECURE
 OUTDOOR APPLIANCES TO WITHSTAND ANTICIPATED WIND
 PRESSURES. NO DETAIL HAS BEEN PROVIDED. PLEASE SEE
 COMMENT ABOVE. MANUFACTURER?S INSTALLATION INSTRUCTIONS
 MAY BE SUFFICIENT IF MANUFACTURER?S DATA SHOWS THE
 ATTACHMENT METHODS SPECIFIED HAVE BEEN TESTED TO MEET
 ANTICIPATED WIND PRESSURES IN ACCORDANCE WITH FBCM
 301.13, FBCB 1604 AND FBCB 1609. PLEASE PROVIDE
 SUPPORTING DOCUMENTATION IN SUFFICIENT DETAIL FOR
 BUILDING PLAN REVIEW IN ACCORDANCE WITH THESE
 SECTIONS.
  
 8. NOTE #13 ON M-2 STATES "ONLY ON SET OF LINES PER PVC
 CONDUIT." THIS MAY JUST BE A TYPO AND INTENDED TO SAY
 "ONLY ONE SET"? BUT THE MEANING IS UNCLEAR. PLEASE
 CLARIFY. FBCM 1107.2.1, FBCB 106.1.1.
  
 9. ENERGY CALCULATIONS:
 A) THE CERTIFICATION PAGE STATES THE CALCULATIONS WERE
 PREPARED BY "C. HAMMOND." IS C. HAMMOND AN ENGINEER OR
 ARCHITECT? ENERGY CALCULATIONS SHALL BE PREPARED BY AN
 ARCHITECT OR ENGINEER IN ACCORDANCE WITH FBCB 13-103.2.
 ALSO, C. HAMMOND HAS NOT CERTIFIED THESE CALCULATIONS
 AS REQUIRED BY FBCB 13-103.1.1.
  
 B) S. HOCKMAN AND C. HAMMOND ARE LISTED AS THE
 ELECTRICAL AND MECHANICAL DESIGNERS FOR THIS PROJECT.
 NEITHER OF THESE PEOPLE ARE THE DESIGNERS OF RECORD, AS
 THEY DID NOT SIGN AND SEAL THE PLANS. THEY ALSO DID NOT
 PROVIDE LICENSE NUMBERS ON THE CERTIFICATION FORM.
 DESIGN PROFESSIONALS RESPONSIBLE UNDER FLORIDA LAW FOR
 THE DESIGN OF LIGHTING, ELECTRICAL, MECHANICAL, AND
 PLUMBING SYSTEMS AND THE BUILDING SHELL, SHALL CERTIFY
 COMPLIANCE OF THOSE BUILDING SYSTEMS WITH THE CODE BY
 SIGNING AND PROVIDING THEIR PROFESSIONAL REGISTRATION
 NUMBER ON THE ENERGY CODE FORM PROVIDED AS PART OF THE
 PLANS AND SPECIFICATIONS TO THE BUILDING DEPARTMENT.
 EXCEPTION: TYPED NAMES AND REGISTRATION NUMBERS MAY BE
 PROVIDED IN LIEU OF A SIGNATURE WHERE ALL RELEVANT
 INFORMATION HAS BEEN INCLUDED ON SIGNED AND SEALED
 PLANS IN ACCORDANCE WITH FBCB 13-103.1.1.
  
 C) INPUT DATA REPORT (IDR): SOME ENTRIES IN THE IDR DO
 NOT MATCH THE INFORMATION ON THE PLANS OR THE RATINGS
 OF THE EQUIPMENT SPECIFIED. EXAMPLE: AC-1 AND AC-2 IN
 THE IDR SHOW EFFICIENCY AT 10.1 WHILE THE EQUIPMENT
 SCHEDULE AND MANUFACTURER?S DATA SHOW THESE SYSTEMS
 RATED AT 9.7 EER. THIS IS NOT AN EXHAUSTIVE LIST OF ALL
 DISCREPANCIES. PLEASE VERIFY ALL DATA WHICH IS INPUT
 INTO THE PROGRAM CORRESPONDS WITH THE INFORMATION ON
 THE PLANS IN ACCORDANCE WITH FBCB 13-103.2
  
 D) COMPLIANCE FORM SUBMITTED IS FLA/COM 2004 V3.00. THE
 CORRECT FOR IS FLA/COM V2.5 FORM 400A-04R IN ACCORDANCE
 WITH FBCB 13-400.3.A. THIS VERSION 2.5 FORM MAY
 INCORPORATE THE LATEST VERSION OF ENERGYGAUGE.
  
 NOTE: THESE CALCULATIONS ARE ONLY BEING REVIEWED FOR
 COMPLIANCE WITH THE GENERAL AND MECHANICAL PORTIONS OF
 THE ENERGY CODE. PLEASE SEE OTHER TRADE REVIEWS FOR
 ADDITIONAL COMMENTS, IF APPLICABLE.
  
 10. NOT ADDRESSED. NO INFORMATION COULD BE FOUND IN THE
 SUBMITTAL PACKAGE REGARDING THE GENERATOR.
  
 11. OK
  
 IF YOU HAVE ANY QUESTIONS PLEASE CONTACT:
 RONALD J. REGUEIRO
 561.805.6719
 [email protected]