| 2007-10-25 08:35:45 | ZONING REVIEW: FAILED |
| | |
| | 1) PLEASE SUBMIT EXTERIOR MATERIAL AND PAINT COLOR |
| | SELECTIONS TO CITY FOR APPROVAL. |
| | 2) ON A4 - 2, DOWNTOWN ACTION COMMITTEE CHAIR REQUESTED |
| | A GRILLE BE USED IN ARCH INSET AREAS ABOVE STOREFRONT |
| | ALONG CLEMATIS (TO MATCH GRILLES ON QUADRILLE FACADE). |
| | ARCHITECT SAID THIS WOULD BE OK. PLEASE CONFIRM GRILLES |
| | WILL BE ADDED. |
| | 3) SIGNAGE SHALL BE REVIEWED UNDER SEPARATE PERMIT. |
| | 4) AWNINGS SHALL BE REVIEWED UNDER SEPARATE PERMIT. |
| | 5) METER BOXES APPEAR TO BE LOCATED IN SIDEWALK ALONG |
| | EASTER SIDE OF SITE. PLEASE CONFIRM AND RELOCATE |
| | AGAINST BUILDING SO THEY DO NOT IMPEDE PEDESTRIAN |
| | MOVEMENT. |
| | 6) BIKE RACK COUNT AND LOCATIONS SHOULD BE REVIEWED IN |
| | CONSULTATION WITH CITY STAFF. THESE WILL NEED TO BE |
| | INDICATED IN PLAN. |
| | 7) PARKING ADMIN OFFICES AND EQUIPMENT LOCATIONS TO BE |
| | REVIEWED BY S. OLLEY. PLEASE CONFIRM. |
| | 8) LANDSCAPE PLANS TO BE REVIEWED UPON RESUBMILLAL OF |
| | PERMIT. |
| | 9) AWNING ALONG QUADRILLE ELEVATION ONLY SHOW FROM SIDE |
| | VIEW ON CLEMATIS AND BANYAN ELEVATION DRAWINGS. PLEASE |
| | SHOWN ON QUADRILLE ELEVATION. |
| | 10) PLEASE CONFIRM THERE IS ENOUGH CLEARANCE FOR |
| | PEDESTRIANS TO EXIT/ENTER GARAGE WITHOUT WALKING IN |
| | DRIVE LANES ALONG CLEMATIS STREET SIDE. PLANS AND |
| | ELEVATIONS INDICATE APPROXIMATELY 3'-6" OF WIDTH IN PED |
| | PASSAGES. PLEASE CONFRIM. |
| | 11) DASHED LINES ARE SHOWN ABOVE ELEVATOR/STAIRS IN |
| | A1.2/02 - NOT SURE WHAT THIS IS SHOWNING. PLEASE |
| | CLARIFY. |
| | |
| | MATT FLIS - 822-1445 |