| Date |
Text |
| 2007-10-01 17:54:36 | 2004 FBC W/2007 REVISIONS |
| | NSFR |
| | |
| | DENIED BY BUILDING |
| | |
| | 1)A RECORDED COPY OF THE NOTICE OF COMMENCEMENT |
| | MUST BE SUBMITTED BEFORE A |
| | PERMIT CAN BE ISSUED. |
| | |
| | 2) PROVIDE INFORMATION IN REGARDS TO THE SURROUNDING |
| | TERRAIN. NOTE THAT THE DEFINITION FOR EXPOSURE C HAS |
| | CHANGED EFFECTIVE DECEMBER 8, 2006 (2006 AMENDMENTS TO |
| | THE FBC), FBC1609.4, FBC R301.2.1.4. |
| | IF THERE IS EXPOSURE C TYPE TERRAIN IN ANY QUADRANT |
| | FOR A DISTANCE OF MORE THAN 600 FEET THE STRUCTURE |
| | SHALL BE DESIGNED TO EXPOSURE C. NOTE: THE COMPONENT |
| | AND CLADDING PRESSURES WILL NEED TO BE INCREASED TO |
| | EXPOSURE C VALUES, WHICH MAY AFFECT THE PRODUCT |
| | APPROVALS. |
| | |
| | 3) A ONE HOUR FIRE RATED GLASS BLOCK ASSEMBLY WILL BE |
| | REQUIRED AT THE ZERO LOT LINE PER R302.1. PLEASE |
| | SPECIFY ON THE PLANS. |
| | |
| | 4) SUBMIT PRODUCT APPROVALS, MANUFACTURER'S |
| | SPECIFICATIONS AND LISTING FOR THE ONE HOUR FIRE RATED |
| | GLASS BLOCK ASSEMBLY THAT WILL BE USED. |
| | |
| | 5) SHOW COMPLIANCE WITH FBC R401.3 DRAINAGE. |
| | |
| | 6) IN THE WINDOW SCHEDULE ON SHEET A-4.0, 2" X 4" |
| | MULLIONS ARE SPECIFIED. SUBMIT PRODUCT APPROVALS FOR |
| | THESE MULLS AS REQUIRED BY FAC RULE 9B-72 OR REVISE THE |
| | PLAN. |
| | |
| | 7) THE PRODUCT APPROVAL FOR THE IMPACT SLIDING GLASS |
| | DOOR FL251-R5 HAS BEEN REVISED AS THE NOA EXPIRED ON |
| | 11/9/05. SUBMIT THE NEW FL251-R7 AND CURRENT NOA. |
| | |
| | 8) SPECIFY WHICH FASTENERS LISTED IN THE ICC ROOF TILE |
| | PRODUCT APPROVAL WILL BE USED TO ATTACH THE TILES. |
| | CIRCLE THE NUMBER AND TYPE ON THE PRODUCT APPROVAL. |
| | |
| | - ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)805-6714 |
| | [email protected] |