Plan Review Notes
Plan Review Notes For Permit 07090045
Permit Number 07090045
Review Stop E
Sequence Number 6
Notes
Date Text
2008-02-16 18:03:16** DENIEDREVISION **
  
 1) NOTE: PLEASE SEE RISER HAS NOW HAD CONDUCTORS AND
 CONDUIT REVISED WHICH HAS SEVERAL CODE ISSUESWHICH
 NEED TO BE ADDRESSED.
  
 A) AS REDLINED AND STATED ON ALL PREVIOUS REVIEWS: *AN
 EQUIPMENT GROUNDING CONDUCTOR SHALL NOT BE INSTALLED
 BEFORE THE FIRST MEANS OF DISCONNECT. PLEASE SEE 250.24
 AND 250.6. AS THE CODE REQUIRES THE GROUNDED (NEUTRAL)
 TO BE BONDED AT THE FIRST MEANS OF DISCONNECT, IF AN
 EQUIPMENT GROUNDING CONDUCTOR IS INSTALLED FROM THE
 METER TO THAT FIRST MEANS THIS WOULD PARALLEL THE
 NEUTRAL AND CREATE OBJECTIONABLE CURRENTS WHICH IS
 SPECIFICALLY STATED IN THE SECTIONS ABOVE.
  
 B) PLEASE SEE THE HOT/PHASE CONDUCTORS HAVE NOW BEEN
 DOWN SIZED TO 3/0 CONDUCTORS AND STATES PER 310.15B.
 PLEASE SEE THAT THE SECTION NOTED IS INCORRECT. THE
 SECTION IS 310.15(B)(6)AND IS STRICTLY FOR
 *RESIDENTIAL* AND NOT FOR COMMERCIAL USE.
 THE MINIMUM HOT/PHASE CONDUCTORS FOR THE 225AMP MAINS
 IN A COMMERCIAL USE PER 310.16 IS 4/0. THIS WAS ON
 ORIGINAL RISER.
  
 C) PLEASE SEE NOW THE CONDUIT SIZE HAS ALSO BEEN
 DECREASED. PLEASE KNOW AS NOTED IN SECTION B) ABOVE THE
 CONDUCTORS ARE REQUIRED TO BE 4/0. IF YOU FIGURE THE
 SIZING PER TABLES IN CHAPTER 9, EVEN USING PVC SCHEDULE
 40, OR EMT THE 2INCH CONDUIT IS NOT LARGE ENOUGH FOR
 THE CONDUCTORS.
 PLEASE SEE CONDUIT FILL NEEDS TO BE ADDRESSED EVEN IF
 #4 EQUIPMENT GROUNDING CONDUCTOR AFTER THE FIRST MEANS
 OF DISCONNECT IS USED.
 THE 2 ? INCH CONDUIT ON ORIGINAL RISER WAS CORRECT FOR
 THE CONDUCTORS WHICH WERE SHOWN ON ORIGINAL RISER.
 THE 2INCH CONDUIT BEFORE THE MAINS ARE OK FOR 4-4/0.
  
 D) PLEASE SEE A CODE SECTION OF 250.66 IS REFLECTED ON
 RISER FOR EQUIPMENT GROUNDS HOWEVER EQUIPMENT GROUNDING
 CONDUCTORS ARE SIZED FROM 250.122.
 PLEASE ALSO SEE THE RISER SHOWS 3 #4 EQUIPMENT
 GROUNDING CONDUCTORS PER CONDUIT?? PLEASE SEE 250.122
 AS ONLY ONE EQUIPMENT GROUNDING CONDUCTOR #4 IS
 REQUIRED FOR UP TO 300AMPS.
  
 ** THERE ARE SEVERAL ITEMS WHICH NEED TO BE ADDRESSED.
  
  
 ** THIS OFFICE EXPRESSES THAT IF THERE ARE ANY
 COMMENTS, QUESTIONS OR CLARIFICATION NEEDED TO PLEASE
 DO NOT HESITATE IN CONTACTING THIS OFFICE.
 PLEASE SEE BELOW FOR CONTACT INFORMATION.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW II
 CONSTRUCTION SERVICES DEPT.
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved