Plan Review Notes
Plan Review Notes For Permit 07090042
Permit Number 07090042
Review Stop G
Sequence Number 2
Notes
Date Text
2008-04-04 08:07:05DENIED
 REFERENCE: FBC-2004 FUEL GAS
  
 ****FROM PREVIOUS REVIEW:
  
 1. A SEPARATE GAS PERMIT IS REQUIRED. THE FOLLOWING
 INFORMATION IS REQUIRED TO SECURE A PERMIT.
  
 A. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2004
 FUEL GAS CODE.-- SHOW ALL PIPING FROM THE METER TO
 THE MOST REMOTE APPLIANCE.
 ****RESPONSE NOTED, BUT THE LENGTHS OF PIPE FROM THE
 METER TO AND INCLUDING THE FIRST DROP, THE FIRST RISE
 AND SECTION OVER TO THE FIRST RISER, (12FT). ALSO THE
 DROP OUT OF THE CEILING IS ONLY SHOWN AS 2FT. PLEASE
 CLARIFY AND SHOW ALL CUT SECTION LENGHTS.
  
 B. OK
 C. OK
  
 D. SHOW THE DISTANCE FROM THE POINT OF
 DELIVERY, (METER), TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM PER
 FBC-2004 FUEL GAS CODE APPENDIX A - USE
 OF CAPACITY TABLES A.3.1(4). --TOTAL DISTANCE FROM
 THE METER TO THE MOST REMOTE OUTLET IS NOT INDICATED ON
 THE PLANS. GAS APPLIANCE SCHEDULE NOTE #4 INDICATES
 80FT DEVELOPED LENGTH FROM THE REGULATOR, BUT ADDING
 ALL CUT SECTION LENGTHS PROVIDED ON THE ISOMETRIC
 SUBMITTED ON SHT P-11.0 197FT IS INDICATED. PLEASE
 CLARIFY.
 ****RESPONSE NOTED, BUT ADDITION OF CUT SECTION LENGHTS
 SHOWN TOTALS 127FT, THIS IS WITH THE SECTIONS FROM THE
 METER TO AND INCLUDING THE FIRST DROP, AS WELL AS THE
 FIRST RISE FROM THE PE PIPE AND SECTION TO THE FIRST
 RISER (12FT) NOT ADDED. A CLARIFICATION FOR THE DROP
 DOWNSTREAM OF THE SOLINOID VALVE, (2FT),WILL BE
 REQUIRED TO BE VERIFIED.
  
 E. OK
  
 F. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2004 FUEL GAS CODE SEC 402.2.
 ****RESPONSE NOTED, BUT THE LOCATION OF THE INFORMATION
 ON THE ARCHITECTURAL SHEETS IS NOT INDICATED. ALSO THE
 LISTING INFORMATION AS WELL AS THE BTU LOAD OF EACH GAS
 APPLIANCE IS REQUIRED. WILL THIS INFORMATION BE
 AVAILABLE ON THE ARCHITECTURAL SHEETS? IF NOT SUBMIT
 MANUF. SPECIFICATION SHEETS TO VERIFY LISTING & BTU
 LOAD.
  
 G. N/A
 H. N/A
  
 I. EMERGENCY HOOD SHUT DOWN SHUT OFF
 VALVE TO BE BELOW CEILING. MANUAL SHUT
 OFF VALVE TO BE UPSTREAM. UNION TO BE
 DOWN STREAM OF MANUAL VALVE.
 ****RESPONSE NOTED, BUT THE MANUAL SHUT OFF VALVE IS
 NOT INDICATED, NOR IS THE UNION. ALSO NO INDICATION
 THAT THE VALVES/UNION ARE BELOW THE CEILING.
  
 J. SUBMIT THE MANUF. SPECIFICATION SHEETS FOR THE
 SECOND STAGE REGULATOR. INDICATE THE MODEL NUMBER. THE
 REGULATOR SHALL BE LISTED & INDICATE TOTAL BTU OUTPUT
 THAT CORRELATES TO THE TOTAL BTU LOAD DOWNSTREAM OF THE
 REGULATOR.
 ****RESPONSE NOTED, PLEASE SUBMIT PRIOR TO INSTALLATION
 TO PREVENT REMOVAL/REPLACEMENT IN CASE REGULATOR IS NOT
 APPROVED.
  
 K. A LISTED SHUTOFF VALVE SHALL BE INSTALLED
 IMMEDIATELY AHEAD OF EACH MP REGULATOR. SECTION 409.4.
 --ALSO A UNION WILL BE REQUIRED DOWNSTREAM OF THE
 SHUT OFF VALVE.PLEASE SHOW ON RISER DIAGRAM.
 ****RESPONSE NOTED, BUT THE UNION IS NOT INDICATED.
  
 **********NEW COMMENT**********
  
 1B. SHT P-11.1 THE UNIT NUMBERS FROM THE GAS APPLIANCE
 SCHEDULE DO NOT REFLECT THE NUMBERS INDICATED ON THE
 GAS ISOMETRIC RISER DIAGRAM. PLEASE CORRELATE. SECTION
 106.1.1 & TABLE 402.4(2).
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE
 THE REVISION & REMOVE & REPLACE ANY
 PAGES AS NECESSARY. A TRANSMITTAL LETTER
 LISTING THE ORIGINAL REVIEW COMMENT NUMBER,
 WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND
 WILL HELP TO EXPEDITE YOUR PERMIT. REMOVE ALL VOID
 SHEETS FROM ALL PLANS AND PLACE ONE SET OF THEM LOOSELY
 ON TOP OF THE COLLATED PLANS TO BE REVIEWED. THANK YOU
 FOR YOUR ANTICIPATED COOPERATION.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 805-6731
 E-MAIL [email protected]