| Plan Review Notes For Permit 07080804 |
| Permit Number |
07080804 |
|
| Review Stop |
B |
| Sequence Number |
4 |
|
| Notes |
| Date |
Text |
| 2008-04-05 11:14:34 | | | | | | | DENIED | | | | | | THE FOLLOWING COMMENTS WERE NOT ADDRESSED FROM THE 3RD | | | REVIEW | | | | | | 6)SHUTTERAPPLICATIONS REQUIRE A KEY PLAN (WITH | | | EGRESS SHOWN), SHUTTER SCHEDULE AND THE PRODUCT | | | APPROVALS. APPROVAL DRAWINGS SHALL BE MARKED FOR | | | MOUNTING METHOD AND CONNECTION TYPE AND THE SCHEDULE | | | FILLED OUT WITH ALL PERTINENT INFORMATION SPECIFIC TO | | | THE SITE (TYPE OF CONSTRUCTION, MOUNTING CONNECTION | | | METHOD, ANCHOR TYPE, SHUTTER SPAN (VERTICAL OR | | | HORIZONTAL), ETC.)***************PLEASE SEE THE | | | ATTACHED MEMO AND SCHEDULE.**************** | | | | | | *******NOTE******** | | | SHUTTER INSTALLATION: FASTENERS FOR FILLED CELL | | | BLOCK-WORK-CONTRACTOR CANNOT ASSUME THAT THERE IS A | | | CONCRETE SUBSTRATE WHEN SELECTING FASTENERS (AND | | | SPACING) UNLESS THEY CAN PROVIDE DOCUMENTATION TO | | | VERIFY COMPRESSIVE STRENGTH OF 3,000 PSI, OR 3,500 PSI, | | | ETC, AND THE REQUIRED FASTENER EMBEDMENT DEPTH,AS | | | REQUIRED ON THE PRODUCT APPROVAL. IF DOCUMENTATION IS | | | NOT PROVIDED THE SUBSTRATE SHALL BE CONSIDERED MASONRY | | | AND THE O/C SPACING SHALL BE ADJUSTED ACCORDINGLY. | | | | | | 7)PER 713.13(2) F.S. IF THE IMPROVEMENT DESCRIBED IN | | | THE NOC HAS NOT COMMENCED WITHIN 90 DAYS OF RECORDING, | | | THE NOTICE IS VOID, PLEASE HAVE RERECORDED | | | | | | BLDG PLAN REVIEW | | | ADRIAN MORSE | | | 561-805-6716 | | | |
|