| Date |
Text |
| 2008-05-15 09:03:28 | ***FAILED**** PLEASE PROVIDE THE FOLLOWING: |
| | |
| | WE HAVE NOT FOUND CIVIL DRAWINGS & ENG REVIEW INFO IN |
| | YOUR PACKAGE YOU SUBMITTED FOR THIS PERMIT.JUST TO |
| | LET YOU KNOW A HEAD OF TIME THATWE NEED FOR ENG |
| | REVIEW,STORM WATER QUALITY CALS, POLLUTION PREVENTION |
| | PLANS, CITY STANDARDS SHOWN ON DRAWINGS ETC, ETC. |
| | THEREFORE, WE ARE ASKING YOU TO INCLUDE THE FOLLOWING |
| | WHEN YOU SUBMIT CIVIL DRAWINGS FOR ENGINEERING REVIEW, |
| | SO WE CAN EXPEDITE OUR ENG REVIEW PROCESS. |
| | |
| | 1. PLEASE PROVIDE A COPY OF NOTICE OF INTENT (NOI). |
| | PLEASE APPLY AT FDEP, NPDES STORMWATER SECTION FOR |
| | NOI. |
| | YOU CAN GET NOI INFO FROM |
| | WWW.DEP.STATE.FL.US/WATER/STORMWATER/NPDES/ |
| | NOTICE OF INTENT DEP FORM 62-621.300(4)(B), |
| | EFFECTIVE MAY 1, 2003 |
| | |
| | 2. PLEASE SHOW ON CIVIL DRAWING THE SITE PLAN SHOWING |
| | STREETS/ROADS AROUND THE SITE WITH NORTH ARROW. |
| | |
| | 3.PLEASE SHOW ON DRAWING ALL CITY STANDARDS NOTES FOR |
| | SIDEWALK, DRIVEWAY, APPROACH, PARKINGS, HANDICAP |
| | PARKINGS, DUMPSTER ENCLOSURE, YOU CAN GET A C D FROM |
| | 1000, 45 STREET FOR ALL THESE CITY STANDARDS NOTES. |
| | PHONE# 494-1040 |
| | |
| | 4. PLEASE SHOW ON DRAWINGSDUMPSTER & ITS ENCLOSURE |
| | DETAILS PER CITY OF WPB, &LOCATION ON DWG, LOCATION |
| | MUST BE ACCESSIBLE FOR PICKUP TRUCK. |
| | |
| | 5. FIRST FLOOR ELEVATION, CENTER LINE OF ROAD , |
| | SIDEWALK ELEVATION MUST MEET FLOOD ZONE AREA, & 5,10, |
| | 25, 100 YEAR FLOOD CRITERIATO DETERMINE THE FIRST |
| | FLOOR ELEVATION, PLEASE SHOW IN YOUR STORM WATER CALS |
| | THAT HOW DID YOU DETERMINE THE FIRST FLOOR |
| | ELEVATION??. |
| | |
| | 6. PLEASE SHOW ON DRAWINGTHE SITE AREA, YOU ARE |
| | DEVELOPING FOR THIS PROJECT . PLEASE ALSO SHOW TOTAL |
| | PERVIOUS,& IMPERVIOUS AREA FOR THIS PROJECT, |
| | LAKE,SIDEWALK, PARKING,BUILDING AREA ETC. MAKE SURE |
| | THESE AREAS SHOWN ON DRAWINGS MUST MATCH WITH AND USED |
| | IN STORM WATER QUALITY CALCULATIONS. |
| | |
| | 7. HOW DO YOU CONNECT TO THE STORM WATER PIPES IN YOUR |
| | SITE? ITS DETAILS.PLEASE SHOW ALL STORM WATER PIPES |
| | AROUND YOUR SITE SO, WE CANSEE THE LAYOUT OF STORM |
| | WATER PIPES FROM ALL OTHER STORM WATER PIPES. PLEASE |
| | SHOW DETAIL OF THE CONTROL STRUCTURESWITH |
| | ELEVATIONS, NOTCHES, BLEEDING ELEVATION, ETC ON |
| | DRAWINGS, CALCULATION FOR EXFILTRATION TRENCHES, PLEASE |
| | SHOW DRY DETENTION/WET DETENTION AREAS IN STORM WATER |
| | CALS. |
| | |
| | 8. ALSO PLEASE SHOW ALL CATCH BASINS NEAREST,AROUND |
| | YOUR SITE FOR STORM WATER DRAIN. |
| | |
| | 9. PLEASE PROVIDE A COPY OF SFWMD PERMIT,, & PLEASE |
| | ALSO PROVIDE A COPY OF GEOTECH REPORT & STORM WATER |
| | QUALITY CALCULATIONS TO 1000 45TH STREET ENGINEERING |
| | SERVICES FOR THEIR APPROVAL BEFORE WE ISSUE A PERMIT, |
| | |
| | 10. PLEASE SHOW ON DRAWINGS THE POLLUTION PREVENTION |
| | DETAILS,CLOTHES USED FOR SILT ETC., PLANS SHOWING SILT |
| | FENCE AROUND THE SITE & CATCH BASINS.HEIGHT OF FENCE |
| | SHOULD BE HIGH ENOUGH PER FDEP TO STOP DUST & |
| | PARTICLES. |
| | |
| | 11. WATER & SEWER PLANS MUST BE APPROVED FROM 45TH |
| | STREET (MANNY G.), UTILITY DEPT BEFORE WE APPROVED. |
| | |
| | PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR |
| | PERMITTING PROCESS |
| | |
| | RASIK CHOKSHI805-6723 |