| Date |
Text |
| 2007-10-23 09:51:55 | 2004 FBC W/2007 SUPPLEMENTS |
| | NSFR |
| | |
| | DENIED BY BUILDING |
| | |
| | 1) COMPLIED |
| | |
| | 2) A RECORDED COPY OF THE NOTICE OF COMMENCEMENT |
| | MUST BE SUBMITTED BEFORE A |
| | PERMIT CAN BE ISSUED. WORK MUST COMMENCE WITHIN 90 DAYS |
| | OF THE DATE THE NOC IS RECORDED. FS 713.13. |
| | |
| | 3) IMPACT FEES MUST BE PAID TO PALM |
| | BEACH COUNTY, PLANS STAMPED BY THEM AND |
| | COPY OF RECEIPT SUBMITTED TO CITY OF |
| | WEST PALM BEACH BUILDING DEPARTMENT, |
| | BEFORE A BUILDING PERMIT CAN BE ISSUED. |
| | |
| | 4)THE PLANS SPECIFY TYPE III UNPROTECTED |
| | CONSTRUCTION, WHICH UNDER THE 2004 CODE IS TYPE III-B. |
| | PLEASE SPECIFY A OR B ON THE PLANS. SEE FBC CHAPTER 6. |
| | NOTE: TYPE III CONSTRUCTION REQUIRES EXTERIOR WALLS TO |
| | HAVE A TWO HOUR FIRE RATING IN ADDITION TO OTHER |
| | REQUIREMENTS. SEE TABLES 601 AND 602. NOTE: THIS |
| | STRUCTURE COULD BE DECLARED TYPE V-B CONSTRUCTIONAND |
| | IT WOULD STILL COMPLY WITH THE HEIGHT AND AREA |
| | REQUIREMENTS OF TABLE 503. TYPE V-B CONSTRUCTION DOES |
| | NOT REQUIRE THE EXTERIOR WALLS TO BE FIRE RATED. IF YOU |
| | ARE SPECIFYING TYPE III CONSTRUCTION SUBMIT |
| | CALCULATIONS AS TO HOW THE 2 HOUR FIRE RATING WILL BE |
| | OBTAINED. SUBMIT A LETTER FROM THE CONCRETE BLOCK |
| | SUPPLIER THAT SPECIES THE THICKNESS AND AGGREGATE IN |
| | THE BLOCK AND THE FIRE RESISTANCE RATING IN HOURS. |
| | |
| | 5)FBC R401.4AREA OF QUESTIONABLE |
| | SOIL.SUBMIT A GEOTECHNICAL REPORT |
| | TO VERIFY THE SAFE BEARING CAPACITY OF |
| | THE SOIL. SUBMIT 2 SIGNED AND SEALED COPIES. |
| | |
| | 6) THE PLANS ARE REQUIRED TO HAVE THE CERTIFICATE OF |
| | AUTHORIZATION NUMBERS OF THE ENGINEERING AND |
| | ARCHITECTURAL FIRMS. SEE FS 471 AND 481. ALSO SEE THE |
| | ELECTRICAL REVIEW COMMENTS. |
| | |
| | 7) THE FLOOD ZONE DESIGNATION ON THE SURVEY IS |
| | SPECIFIED AS A8, WHICH IS INCORRECT. THIS AREA IS |
| | INCLUDED IN THE LETTER OF MAP REVISION (LOMR) FOR THE |
| | VILLAGES OF PALM BEACH LAKES AND SPENCER LAKES PLATS |
| | 1,2 AND 3 DATED DECEMBER 3, 1983. PLEASE CORRECT. |
| | |
| | 8) THE ENERGY CALCULATIONS LIST THE CONDITIONED FLOOR |
| | AREA AS 8000 SQFT AND THE PLANS SPECIFY 8327 SQFT. |
| | PLEASE CORRECT. FBC R CHAPTER 11 AND FBC CHAPTER 13 |
| | |
| | 9)NOTE THAT THE DEFINITION FOR EXPOSURE C HAS CHANGED |
| | EFFECTIVE DECEMBER 8, 2006 (2006 AMENDMENTS TO THE |
| | FBC), FBC1609.4, FBC R301.2.1.4. |
| | EXPOSURE C. OPEN TERRAIN WITH SCATTERED |
| | OBSTRUCTIONS, INCLUDING SURFACE UNDULATIONS OR OTHER |
| | IRREGULARITIES, HAVING HEIGHTS GENERALLY LESS THAN 30 |
| | FEET (9144 MM) EXTENDING MORE THAN 1,500 FEET (457.2 M) |
| | FROM THE BUILDING SITE IN ANY QUADRANT. THIS EXPOSURE |
| | SHALL ALSO APPLY TO ANY BUILDING LOCATED WITHIN |
| | EXPOSURE B-TYPE TERRAIN WHERE THE BUILDING IS DIRECTLY |
| | ADJACENT TO OPEN AREAS OF EXPOSURE C-TYPE TERRAIN IN |
| | ANY QUADRANT FOR A DISTANCE OF MORE THAN 600 FEET |
| | (182.9 M). THE STRUCTURE IS LOCATED ADJACENT TO A GOLF |
| | COURSE WHICH MAY REQUIRE IT TO BE DESIGNED AS EXPOSURE |
| | C. PLEASE REVISE PLANS OR INDICATE WHY THE EXPOSURE |
| | CATEGORY SHOULD NOT BE CHANGED. |
| | |
| | 10) THE WALLS OF THE WINE ROOM ARE REQUIRED TO BE |
| | WATERPROOFED IN ACCORDANCE WITH FBC R406. INDICATE HOW |
| | THIS WILL BE ACCOMPLISHED ON THE PLANS. |
| | |
| | 11) PROVIDE DETAILS OF THE MASONRY FIREPLACES AND |
| | CHIMNEYS IN THE LIVING ROOM AND AT THE COVERED PATIO. |
| | SEE SECTIONS R1001 AND R1003.SPECIFY REINFORCING, |
| | ETC. |
| | |
| | 12) PROVIDE DETAILS FOR THE PRE-FAB FIREPLACE AND |
| | CHIMNEY. SUBMIT THE MANUFACTURER'S SPECIFICATIONS AND |
| | LISTING INFORMATION FOR THE FIREPLACE AND CHIMNEY. FBC |
| | R1002 AND R1004 |
| | |
| | 13) PROVIDE DETAILS FOR THE CHIMNEY CAPS. SPECIFY |
| | MATERIALS, ATTACHMENTS, FASTENERS, ETC. FBC 106.1.1 |
| | CITY AMENDMENTS. |
| | |
| | 14) PROVIDE STRUCTURAL DETAILS FOR THE WOOD FRAME FALSE |
| | CHIMNEY. SPECIFY MATERIALS, CONNECTIONS, ETC. FBC |
| | 106.1.1 CITY AMENDMENTS. |
| | |
| | 15) AT INTERIOR STAIRS AND SECOND FLOOR LANDING SHOW |
| | COMPLIANCE WITH R312.2 GUARD OPENING LIMITATIONS. |
| | REQUIRED GUARDS ON OPEN SIDES OF STAIRWAYS, RAISED |
| | FLOOR AREAS, BALCONIES AND PORCHES SHALL HAVE |
| | INTERMEDIATE RAILS OR ORNAMENTAL CLOSURES WHICH DO NOT |
| | ALLOW PASSAGE OF A SPHERE 4 INCHES (102MM) OR MORE IN |
| | DIAMETER. |
| | |
| | 16) SHOW COMPLIANCE WITH R807.1 ATTIC ACCESS . |
| | IN BUILDINGS WITH COMBUSTIBLE CEILING OR ROOF |
| | CONSTRUCTION, AN ATTIC ACCESS OPENING SHALL BE PROVIDED |
| | TO ATTIC AREAS THAT EXCEED 30 SQUARE FEET (2.8 M 2 ) |
| | AND HAVE A VERTICAL HEIGHT OF 30 INCHES (762 MM) OR |
| | GREATER. THE ROUGH-FRAMED OPENING SHALL NOT BE LESS |
| | THAN 22 INCHES BY 30 INCHES (559 MM BY 762 MM) AND |
| | SHALL BE LOCATED IN A HALLWAY OR OTHER READILY |
| | ACCESSIBLE LOCATION. NO ATTIC ACCESS IS SPECIFIED ON |
| | THE SECOND FLOOR. |
| | |
| | 17)COMPLIED |
| | |
| | 18) SUBMIT THE MANUFACTURER'S SPECIFICATIONS AND |
| | LISTING FOR THE OUTDOOR BBQ ON THE COVERED PORCH. |
| | INCLUDE SPECS. AND LISTING FOR HOOD IF ONE IS REQUIRED. |
| | FBC 106.1.1 CITY AMENDMENTS. |
| | |
| | 19) SPECIFY THE CEILING FINISHES FOR THE FRONT PORCH, |
| | LOGGIA AND COVERED PATIO. FBC 106.1.1 CITY AMENDMENTS. |
| | |
| | 20) THE ROOF/FLOOR DRAIN AT THE FRONT PORCH IS REQUIRED |
| | TO DISCHARGE AT LEAST 1 FOOT AWAY FROM THE STRUCTURE IN |
| | ACCORDANCE WITH R320.7. SPECIFY ON THE PLANS. |
| | |
| | 21) SHOW COMPLIANCE WITH R502.1.2 DRAFTSTOPPING |
| | REQUIRED. |
| | WHEN THERE IS USABLE SPACE BOTH ABOVE AND BELOW THE |
| | CONCEALED SPACE OF A FLOOR/CEILING ASSEMBLY, DRAFTSTOPS |
| | SHALL BE INSTALLED SO THAT THE AREA OF THE CONCEALED |
| | SPACE DOES NOT EXCEED 1,000 SQUARE FEET (92.9 M 2 ). |
| | DRAFTSTOPPING SHALL DIVIDE THE CONCEALED SPACE INTO |
| | APPROXIMATELY EQUAL AREAS. WHERE THE ASSEMBLY IS |
| | ENCLOSED BY A FLOOR MEMBRANE ABOVE AND A CEILING |
| | MEMBRANE BELOW DRAFTSTOPPING SHALL BE PROVIDED IN |
| | FLOOR/CEILING ASSEMBLIES UNDER THE FOLLOWING |
| | CIRCUMSTANCES: |
| | 1.CEILING IS SUSPENDED UNDER THE FLOOR FRAMING. 2. |
| | FLOOR FRAMING IS CONSTRUCTED OF TRUSS-TYPE OPEN-WEB OR |
| | PERFORATED MEMBERS. |
| | R502.1.2.1 MATERIALS. |
| | DRAFTSTOPPING MATERIALS SHALL NOT BE LESS THAN 1/2-INCH |
| | (12.7 MM) GYPSUM BOARD, 3 / 8 -INCH (9.5 MM) WOOD |
| | STRUCTURAL PANELS, 3 / 8 -INCH (9.5 MM) TYPE 2-M-W |
| | PARTICLEBOARD OR OTHER APPROVED MATERIALS ADEQUATELY |
| | SUPPORTED. DRAFTSTOPPING SHALL BE INSTALLED PARALLEL TO |
| | THE FLOOR FRAMING MEMBERS UNLESS OTHERWISE APPROVED BY |
| | THE BUILDING OFFICIAL. THE INTEGRITY OF ALL DRAFTSTOPS |
| | SHALL BE MAINTAINED. |
| | SPECIFY THE MATERIAL THAT WILL BE USED AND LOCATIONS ON |
| | THE PLANS. |
| | |
| | 22)COMPLIED |
| | |
| | 23) REVISE GENERAL NOTE E(2) ON A9 TO SPECIFY ACI |
| | 315-02 AND NOTE F(2) FROM SBC TO FBC. WHICH ARE THE |
| | CORRECT REFERENCES PER 2004 FBC RESIDENTIAL CHAPTER |
| | 43. |
| | |
| | 24) ON SHEET S1.01, NOTE 2 INCORRECTLY LISTS S3.01 AS |
| | THE SHEET CONTAINING THE WINDOW AND DOOR PRESSURES. THE |
| | TABLE IS LOCATED ON S 3.02. |
| | |
| | 25) PLEASE SPECIFY THE COMPONENT AND CLADDING PRESSURES |
| | AT EACH OF THE OPENINGS ON THE PLANS BASED ON THE |
| | OPENING SIZES, EXPOSURE CATEGORY AND LOCATIONS. FBC * |
| | 106.1.2 |
| | |
| | 26) COMPLIED |
| | |
| | 27) ON SHEET A.01 THE STAIR CALCULATIONS ARE INCORRECT. |
| | THE SUM OF THE 2 RISERS AND A TREAD IS 23.95" NOT 24" |
| | AS SPECIFIED, WHICH IS NOT BETWEEN 24 AND 25 INCHES. |
| | SEE FBC R311.5.3.2 PLEASE CORRECT. |
| | |
| | 28) THE (2)LB-3 BEAMS SPECIFIED AT THE COVERED PORCH |
| | ON SHEET S2.01 ARE NOT LISTED IN THE SECOND BEAM |
| | SCHEDULE ON SHEET S2.01. PLEASE CORRECT. FBC 106.1.2 |
| | CITY AMENDMENTS |
| | |
| | 29) THE SIMPSON H10 OR USP RT16 "R" IN SCHEDULE ON |
| | S2.02) WILL NOT WORK FOR ATTACHING THE FLOOR TRUSSES TO |
| | THE LEDGERS. THE FLOOR TRUSSES ARE 3-1/2" WIDE AND THE |
| | CONNECTORS HAVE A 1-9/16" OPENING FOR THE TRUSS. PLEASE |
| | CORRECT. |
| | |
| | 30) N/A |
| | |
| | 31) CONNECTOR "L" IN THE SCHEDULE ON S2.02A SIMPSON |
| | MTSM 20,REQUIRES 4 CONCRETE SCREWS TO ACHIEVE THE |
| | UPLIFT SPECIFIED. ONLY 3 FASTENERS ARE SPECIFIED IN THE |
| | SCHEDULE. PLEASE CORRECT. |
| | |
| | 32) CONNECTOR "N" ON S2.O2 , THE SIMPSON HTT22 IS |
| | INCORRECTLY SPECIFIED WITH 3/4" DIA. ANCHORS AND THE |
| | SIMPSON CATALOG SPECS. 5/8" DIA ANCHORS. PLEASE |
| | CORRECT. |
| | |
| | 33) NOTE #4 ON SHEETS S2.01 AND S2.02 STATE SEE PLYWOOD |
| | NAILING SCHEDULE ON THIS SHEET AND THE SCHEDULE IS ON |
| | SHEET S3.02. PLEASE CORRECT. |
| | |
| | 34) CORRECTED |
| | |
| | 35) THE TRUSS LAYOUT IS REQUIRED TO BE REVIEWED AND |
| | APPROVED IN WRITING BY THE DESIGNER OF RECORD FOR THE |
| | STRUCTURE. R802.1.6 AND FBC106.1.1.2 CITY AMENDMENTS |
| | |
| | 36) THE ROOF TRUSSES ARE REQUIRED TO HAVE A MINIMUM |
| | BOTTOM CORD LIVE LOAD OF 10 PSF. SEE TABLE R301.5. |
| | PLEASE CORRECT. |
| | |
| | 37) THE TRUSS DRAWING SUBMITTAL DOES NOT MEET THE |
| | REQUIREMENTS OF FAC 61G-15-31.003. PLEASE SEPARATE THE |
| | DRAWINGS AND PLACE THEM WITH THE APPROPRIATE COVER |
| | SHEETS AND NUMBER THE DRAWINGS TO CORRESPOND TO THE |
| | NUMBERING ON THE COVERSHEETS. |
| | |
| | 38) THE PLYWOOD SHEATHING FASTENING SCHEDULE FOR WALLS |
| | AND ROOFS ON S 3.02 SPECIFIES #8 SCREWS AND THE NOTE |
| | CALLS FOR 2-1/2" SELF DRILLING SCREWS FOR ATTACHING TO |
| | A METAL DECK.THE SHEATHING AND FRAMING FOR THIS |
| | PROJECT IS WOOD. PLEASE CORRECT. FBC R803.2.3.1 |
| | REQUIRES 8D RING SHANK NAILS IN ALL ROOF ZONES. PLEASE |
| | CORRECT. |
| | |
| | 39)CORRECTED |
| | |
| | 40) FBC 106.3* CITY AMENDMENTS PRODUCT |
| | APPROVALS. THOSE PRODUCT WHICH ARE |
| | REGULATED BY DCA RULE 9B-72 SHALL BE |
| | REVIEWED AND APPROVED IN WRITING BY THE |
| | DESIGNER OF RECORD PRIOR TO SUBMITTAL |
| | FOR JURISDICTIONAL APPROVAL. |
| | |
| | 41) SPECIFY THE METHOD OF ATTACHMENT THAT WILL BE USED |
| | TO INSTALL THE ROOF TILES. PLEASE CIRCLE THE |
| | APPROPRIATE METHOD FROM THOSE LISTED IN THE PRODUCT |
| | APPROVAL NOA. FBC 106.1.2 CITY AMENDMENTS. |
| | |
| | 42)THE GENERIC PRESSURES IN THE SCHEDULE ON S3.02 ARE |
| | TOO HIGH FOR THE GARAGE DOORS. SEE TABLE R301.2(4). |
| | PLEASE INDICATE THE REQUIRED OPENING PRESSURES FOR THE |
| | GARAGE DOORS ON THE PLANS. |
| | |
| | 43)SUBMIT THE PRODUCT EVALUATION REPORT AND |
| | INSTALLATION INSTRUCTIONS FOR THE NAN YA PLASTIC CORP. |
| | EXTERIOR DOORS IN ACCORDANCE WITH FAC RULE 9B-72. |
| | |
| | 44) SUBMIT PRODUCT APPROVALS FOR THE FIXED WINDOWS AS |
| | REQUIRED BY FAC RULE 9B-72. |
| | |
| | 45) CORRECTED |
| | |
| | 46) THE LOCAL PRODUCT APPROVAL APPLICATION FOR THE |
| | "SIGNATURE DOOR INC." EXTERIOR DOORS IS INCOMPLETE. |
| | SUBMIT THE EVALUATION REPORT, INSTALLATION |
| | INSTRUCTIONS, ETC. REQUIRED BY FAC RULE 9B-72. |
| | |
| | 47)ON THE FIRST FLOOR PLAN SHEET A.01, THERE IS A |
| | WALL TYPE 6 SPECIFIED. HOWEVER, THIS WALL TYPE IS NOT |
| | LISTED IN THE WALL SCHEDULE. PLEASE CORRECT. FBC |
| | 106.1.2 CITY AMENDMENTS. |
| | |
| | 48) IN ORDER TO EXPEDITE PLAN REVIEW AND HELP AVOID |
| | ADDITIONAL PLAN REVIEWS, PLEASE INCLUDE A RESPONSE |
| | LETTER SPECIFYING HOW THE COMMENTS HAVE BEEN |
| | ADDRESSED. |
| | |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)805-6714 |
| | [email protected] |
| | |
| | |
| | |
| | |
| | |
| | |