| Date |
Text |
| 2007-10-17 18:51:04 | DENIED |
| | REFERENCE: FBC-2004 PLUMBING |
| | FBC-2004 FUEL GAS |
| | FBC-2004 BUILDING |
| | FBC-2004 CHAPTER 1 |
| | FBC-2001 CHAPTER 11 |
| | FHA-98 DESIGN MANUAL |
| | FLORIDA ADMINISTRATIVE CODE |
| | FLORIDA STATUTES |
| | WPB MUNICIPAL CODE |
| | |
| | 1. ALL ARCHITECTURAL SHEETS. THE PRINTED NAME OF THE |
| | PERSON SEALING THE DOCUMENT IS REQUIRED IN THE TITLE |
| | BLOCK OF EACH SHEET. FAC 61G1-16.004(6) & FS 481.2055. |
| | PLEASE SHOW PRINTED NAME IN TITLE BLOCK OF EACH SHEET. |
| | |
| | 2. SHT A-002 BUILDING #4 DATA. THE BUILDING CODE |
| | EDITION IS SHOWN AS 2001 FBC. THE CODE IN EFFECT IS THE |
| | FBC-2004. PLEASE CORRECT CODE REFERENCE. |
| | |
| | 3. SHT A-200 BUILDING #4 DATA. ONE INTENDED USE |
| | ACCESSORY OCCUPANCY IS INDICATED AS MERCANTILE RETAIL |
| | AREA. PLEASE INDICATE THE LOCATION OF THE RETAIL AREA. |
| | SECTION 106.1.1. |
| | |
| | 4. SHT A-003 DETAIL E. THE CLEAR FLOOR SPACE FOR THE |
| | LAV IS NOT SHOWN. PLEASE SHOW CLEAR FLOOR SPACE AS |
| | INDICATED ON PAGE 7.47. ALSO SHTS A-801, A-801A, |
| | A-801B, A-801C, A-801D, A-801E, A-802, A-802B & A-802C |
| | SHALL COMPLY WITH THE FHA-08 DESIGN MANUAL FOR THE |
| | PRIMARY ENTRY LEVEL. PLEASE INDICATED ON THE PLANS AND |
| | SHOW COMPLIANCE WITH REQUIREMENTS 1 THRU 7. SEE PAGE 7 |
| | OF THE FHA DESIGN MANUAL. |
| | |
| | 5. SHT A-0003A DETAILS A & B. THE WATER CLOSET CAN NOT |
| | BE IN THE CLEAR FLOOR SPACE REQUIRED FOR THE LAV, |
| | (DETAIL A), OR SHOWER, (DETAIL B). PLEASE SHOW |
| | COMPLIANCE WITH THE CLEAR FLOOR SPACE REQUIREMENTS. |
| | |
| | 6. SHT A-104 ROOF DRAIN CALCULATIONS. NO MENTION OF THE |
| | CONTRIBUTION FROM THE ROOF AREA ABOVE DRAINING ONTO THE |
| | ROOF AREAS. SECTION 1106.3. PLEASE SHOW THE UPPER ROOF |
| | CONTRIBUTION IN THE CALCULATIONS FOR THE ROOF/DECK |
| | DRAINS. |
| | |
| | 7. SHT A-104 ROOF DRAIN CALCULATIONS. AREA "C" SCALES |
| | OUT TO BE ROUGHLY 15FT SHORTER THAN AREAS "D & E", BUT |
| | SHOWS MORE TOTAL AREA. PLEASE CLARIFY. SECTION 106.1.1. |
| | IS THERE MORE VERTICAL SF OR UPPER ROOF AREA? |
| | |
| | 8. SHT A-104 AREAS "D & E" SCALE OUT TO BE |
| | APPROXIMATELY THE SAME LENGTH, BUT AREA "E" IS |
| | INDICATED AS ABOUT TWICE THE AREA. PLEASE CLARIFY. |
| | SECTION 106.1.1. |
| | |
| | 9. SHT A-104. AREA "F" SHOWS NO CALCULATIONS FOR THE |
| | PRIMARY AND SECONDARY ROOF DRAINS. PLEASE SHOW |
| | CALCULATIONS PER SECTIONS 1106 & 1107 WITH ALL |
| | SUBSECTIONS. SHOW THE SQUARE FOOTAGE OF THE ROOF AREA, |
| | WITH 1/2 THE AREA OF ALL VERTICAL WALLS INCLUDING |
| | PARAPETS AS WELL AS THE AREA FROM THE UPPER ROOF THAT |
| | DRAINS ONTO THE ROOF FROM ABOVE. |
| | |
| | 10. SHT A-104 CALCULATIONS ARE REQUIRED FOR THE OUTDOOR |
| | LIVING PATIO & DECK DRAINS. SHOW THE SQUARE FOOTAGE OF |
| | THE DECK AREA AND SHOW 1/2 AREA OF ALL VERTICAL WALLS |
| | AND INDICATE THE SQUARE FOOT AREA OF THE ROOFS THAT |
| | DRAIN ONTO THE DECK AREA FROM ABOVE. SECTIONS 1106 & |
| | 1107 AND ALL SUBSECTIONS. |
| | |
| | 11. SHT A-104 SHOW THE LOCATIONS FOR ALL SECONDARY |
| | DRAINAGE ON THE DECK. INDICATE ALL AREAS THAT DRAIN OFF |
| | THE SIDE OF THE BUILDING IF ANY. SECTIONS 106.1.2 & |
| | 1107. |
| | |
| | 12. SHT A-104 THE LOCATIONS OF THE DECK DRAINS IN THE |
| | OUTDOOR LIVING PATIO & DECK DRAINS ARE APPROXIMATELY |
| | 6FT FROM THE SLIDING GLASS DOOR, BUT THE DISTANCE TO |
| | THE AREA WHERE THE OVERFLOW LEAVES THEPATIO AREA IS |
| | APPROXIMATELY 11FT. IS THERE ANY CONCERN THAT THE STORM |
| | WATER WILL ENTER THE UNIT BEFORE THE STORM WATER |
| | REACHES THE OVERFLOW AREA? PLEASE CLARIFY. SECTION |
| | 106.1.2. (MORE INFORMATION REQUIRED). SECTION 1503.4.3 |
| | |
| | 13. SHT A-104 THERE ARE ABOUT FIVE PLANTER DRAINS THAT |
| | RECIEVE THE WATER OF THE VERTICAL WALL FROM THE ROOF |
| | AREA. WHEN INDICATING THE SQUARE FOOTAGE BEING DRAINED |
| | BY THESE PLANTER DRAINS, PLEASE SHOW 1/2 THE AREA OF |
| | THE VERTICAL WALLS INCLUDED IN THE TOTAL SQUARE |
| | FOOTAGE. SECTION 1106.4. |
| | |
| | 14. SHT A-108 THE ROOF DRAINS DO NOT APPEAR TO BE |
| | LOCATED AT THE LOW POINT OF THE ROOF. THE LOW AREA FOR |
| | AREA"G" APPEARS TO BE IN THE ELEVATOR MACHINE ROOM. |
| | NO SLOPE INDICATION IS SHOWN FOR AREA "F" PLEASE |
| | CLARIFY. SECTION 106.1.1. ELEVATIONS SHALL BE SUBMITTED |
| | FOR ALL AREAS OF THE ROOF TO VERIFY IF THE ROOF DRAINS |
| | ARE IN THE LOWEST POINT OF THE ROOF. |
| | |
| | 15. SHTS A-205 & A-206 SHOW THE SECONDARY DRAINS FOR |
| | ALL AREAS PER SECTION 1107. |
| | |
| | 16. SHT A-206 SHOW COMPLIANCE FOR THE TOILET ROOMS. |
| | (337 & 338). |
| | ____W/C'S |
| | A. 11-4.16.2 CLEAR FLOOR SPACE |
| | ____URINAL |
| | A. 11-4.18.2 HEIGHT |
| | B. 11-4.18.3 CLEAR FLOOR SPACE |
| | C. 11-4.18.4 FLUSH CONTROLS |
| | ____LAVS |
| | A.11-4.19.3 CLEAR FLOOR SPACE |
| | ____TOILET ROOMS |
| | A. 11-4.22.3 SHOW THE 5' TURNING AREA IN THE TOILET |
| | ROOM, ITS NOT REQUIRED IN STALL |
| | |
| | 17. SHT A-907 FINISH SCHEDULE INDICATES PAINT ON GWB |
| | FOR THE ADCP TOILET ROOM, MEN'S TOILET ROOM & WOMEN'S |
| | TOILET ROOM. SECTION 1210.2 REQUIRES THE WALL WITHIN |
| | 2FT OF WATER CLOSETS OR URINALS TO HAVE A "SMOOTH, |
| | HARD, NONABSORBENT" SURFACE. PAINTED GWB DOES NOT MEET |
| | THE "HARD" REQUIREMENT OF THE CODE SECTION. PLEASE SHOW |
| | COMPLIANCE. |
| | |
| | 18. ALL CIVIL SHEETS ARE NOT SIGNED, SEALED OR DATED AS |
| | REQUIRED PER SECTION 106.1 AND FAC 61G15-23.002(2) & FS |
| | 472.025. PLEASE SIGN, SEAL AND DATE ALL SHEETS. |
| | |
| | 19. SHTS CS-1 & A-001A. THE PRINTED NAME OF THE PERSON |
| | SIGNING & SEALING THE DOCUMENT IS REQUIRED ON EACH |
| | SHEET. FAC 61G1-16.003, 61G1-16.004(6) & FS 481.2055. |
| | |
| | 20. ALL CIVIL SHEETS SHALL BE SIGNED, SEALED &DATED |
| | PRIOR TO PLANS BEING ISSUED. THE DATE THE SEAL AND |
| | SIGNATURE ARE AFFIXED TO THE DOCUMENTS SHALL BE ENTERED |
| | ON THE PLANS, SPECIFICATIONS, REPORTS, OR OTHER |
| | DOCUMENTS IMMEDIATELY UNDER THE SIGNATURE OF THE |
| | PROFESSIONAL ENGINEER. FAC 61G15-23.002(1)(2) & FS |
| | 471.025. |
| | |
| | 21. SHT P0.1 PLUMBING LEGEND. ALL WATER LINES ARE SOLID |
| | LINES WITH NO DIFFERENCES. PLEASE CLARIFY. SECTION |
| | 106.1.1.--PLUMBING SHEET INDEX DOES NOT INDICATE A |
| | 6TH FLOOR. PLEASE CLARIFY.--SHTS P5.2.1, P5.2.2 & |
| | P5.3.1 WERE NOT SUBMITTED IN ONE SET OF PLANS. |
| | |
| | 22. SHT P2.1.1 SHOWS SANITARY RISER #1 IN A SOLID WALL |
| | AND RISERS #5 & #8 IN COLUMNS. PER SECTION 1906.3 |
| | CONDUITS AND PIPES EMBEDDED IN CONCRETE. CONDUITS, |
| | PIPES AND SLEEVES OF ANY MATERIAL NOT HARMFUL TO |
| | CONCRETE AND WITHIN THE LIMITATIONS OF ACI 318, SECTION |
| | 6.3, ARE PERMITTED TO BE EMBEDDED IN CONCRETE WITH |
| | APPROVAL OF THE REGISTERED DESIGN PROFESSIONAL. PLEASE |
| | SUBMIT APPROVAL FROM DESIGN ENGINEER. SLEEVES MAY BE |
| | REQUIRED. SECTION 305. |
| | |
| | 23. SHT P2.1.2 SHOWS SANITARY RISERS #13 & #14 IN A |
| | SOLID WALL AND RISERS #21 & #25 & #26 IN COLUMNS. PER |
| | SECTION 1906.3 CONDUITS AND PIPES EMBEDDED IN CONCRETE. |
| | CONDUITS, PIPES AND SLEEVES OF ANY MATERIAL NOT HARMFUL |
| | TO CONCRETE AND WITHIN THE LIMITATIONS OF ACI 318, |
| | SECTION 6.3, ARE PERMITTED TO BE EMBEDDED IN CONCRETE |
| | WITH APPROVAL OF THE REGISTERED DESIGN PROFESSIONAL. |
| | PLEASE SUBMIT APPROVAL FROM DESIGN ENGINEER. SLEEVES |
| | MAY BE REQUIRED. SECTION 305. |
| | |
| | 24. SHT P2.1.3 A CLEANOUT IS REQUIRED IN THE BUILDING |
| | STORM DRAIN TO SDR'S 1 & 2 AND AT THE JUNCTION OF THE |
| | STORM SEWER AT SDR 3. SECTION 1101.8. |
| | |
| | 25. SHT P2.1.4 A CLEANOUT IS REQUIRED AT THE JUNCTION |
| | OF THE STORM SEWER AT SDR 4. SECTION 1101.8. |
| | |
| | 26. SHT P2.1.5 TWO KEY NOTES #3 SHOWN. PLEASE CLARIFY. |
| | SECTION 106.1.1. |
| | |
| | 27. SHT P2.1.5 IDENTIFY ALL STRUCTURES. (CB-1, CB-2 |
| | ETC). SECTION 106.1.2. |
| | |
| | 28. SHT P2.1.5 CONDENSATE RISER #1&2 AND SANT. RISER #1 |
| | ARE SHOWN IN A SOLID WALL. PER SECTION 1906.3 CONDUITS |
| | AND PIPES EMBEDDED IN CONCRETE. CONDUITS, PIPES AND |
| | SLEEVES OF ANY MATERIAL NOT HARMFUL TO CONCRETE AND |
| | WITHIN THE LIMITATIONS OF ACI 318, SECTION 6.3, ARE |
| | PERMITTED TO BE EMBEDDED IN CONCRETE WITH APPROVAL OF |
| | THE REGISTERED DESIGN PROFESSIONAL. PLEASE SUBMIT |
| | APPROVAL FROM DESIGN ENGINEER. SLEEVES MAY BE REQUIRED. |
| | SECTION 305. |
| | |
| | 29. SHT P2.1.5 A CLEANOUT IS REQUIRED NEAR THE JUNCTION |
| | OF THE BUILDING STORM DRAIN AND THE BUILDING STORM |
| | SEWER. SECTION 1101.8. |
| | |
| | 30. SHT P2.1.6 KEY NOTES #1 & #3 NOT FOUND. PLEASE |
| | CLARIFY. SECTION 106.1.1. |
| | |
| | 31. SHT P2.2.1 CONDENSATE RISER #1&2 AND SANT. RISER #1 |
| | ARE SHOWN IN A SOLID WALL. PER SECTION 1906.3 CONDUITS |
| | AND PIPES EMBEDDED IN CONCRETE. CONDUITS, PIPES AND |
| | SLEEVES OF ANY MATERIAL NOT HARMFUL TO CONCRETE AND |
| | WITHIN THE LIMITATIONS OF ACI 318, SECTION 6.3, ARE |
| | PERMITTED TO BE EMBEDDED IN CONCRETE WITH APPROVAL OF |
| | THE REGISTERED DESIGN PROFESSIONAL. PLEASE SUBMIT |
| | APPROVAL FROM DESIGN ENGINEER. SLEEVES MAY BE REQUIRED. |
| | SECTION 305. |
| | |
| | 32. SHT P2.2.1 SANITARY RISER #8 IS SHOWN IN A COLUMN. |
| | PER SECTION 1906.3 CONDUITS AND PIPES EMBEDDED IN |
| | CONCRETE. CONDUITS, PIPES AND SLEEVES OF ANY MATERIAL |
| | NOT HARMFUL TO CONCRETE AND WITHIN THE LIMITATIONS OF |
| | ACI 318, SECTION 6.3, ARE PERMITTED TO BE EMBEDDED IN |
| | CONCRETE WITH APPROVAL OF THE REGISTERED DESIGN |
| | PROFESSIONAL. PLEASE SUBMIT APPROVAL FROM DESIGN |
| | ENGINEER. SLEEVES MAY BE REQUIRED. SECTION 305. |
| | |
| | 33. SHT P2.2.2 THE MATCH LINE DOES NOT REFLECT THE |
| | PREVIOUS WEST SECTION MATCH LINES. PLEASE CORRLEATE |
| | MATCH LINES TO AVOID CONFUSION. SECTION 106.1.1. |
| | |
| | 34. SHT P2.2.2 SANITARY RISERS #8, #21, #22 & #26 ARE |
| | SHOWN IN COLUMNS. PER SECTION 1906.3 CONDUITS AND PIPES |
| | EMBEDDED IN CONCRETE. CONDUITS, PIPES AND SLEEVES OF |
| | ANY MATERIAL NOT HARMFUL TO CONCRETE AND WITHIN THE |
| | LIMITATIONS OF ACI 318, SECTION 6.3, ARE PERMITTED TO |
| | BE EMBEDDED IN CONCRETE WITH APPROVAL OF THE REGISTERED |
| | DESIGN PROFESSIONAL. PLEASE SUBMIT APPROVAL FROM DESIGN |
| | ENGINEER. SLEEVES MAY BE REQUIRED. SECTION 305. |
| | |
| | 35. SHT P2.2.2 SHOWS SANITARY RISERS #13 & #14 IN A |
| | SOLID WALL AND RISERS #21 & #25 & #26 IN COLUMNS. PER |
| | SECTION 1906.3 CONDUITS AND PIPES EMBEDDED IN CONCRETE. |
| | CONDUITS, PIPES AND SLEEVES OF ANY MATERIAL NOT HARMFUL |
| | TO CONCRETE AND WITHIN THE LIMITATIONS OF ACI 318, |
| | SECTION 6.3, ARE PERMITTED TO BE EMBEDDED IN CONCRETE |
| | WITH APPROVAL OF THE REGISTERED DESIGN PROFESSIONAL. |
| | PLEASE SUBMIT APPROVAL FROM DESIGN ENGINEER. SLEEVES |
| | MAY BE REQUIRED. SECTION 305. |
| | |
| | 36. SHT P2.2.2 SHOWS A MINI SUTDOR VENT. A RELEIF VENT |
| | IS REQUIRED PER SECTION 917.3.2. PLEASE SHOW ON THE |
| | FLOOR PLAN AND THE RISER DIAGRAM. |
| | |
| | 37. SHT P2.3.1A RELIEF VENT IS REQUIRED FOR THE AIR |
| | ADMITTENCE VALVE AT THE PAVILLION SINK. SECTION |
| | 917.3.2. PLEASE SHOW ON THE FLOOR PLAN AND THE RISER |
| | DIAGRAM. |
| | |
| | 38. SHT P2.3.1 SANITARY RISER #6 SHOWS A BRANCH LINE |
| | RUNNING THRU A COLUMN. PER SECTION 1906.3 CONDUITS AND |
| | PIPES EMBEDDED IN CONCRETE. CONDUITS, PIPES AND SLEEVES |
| | OF ANY MATERIAL NOT HARMFUL TO CONCRETE AND WITHIN THE |
| | LIMITATIONS OF ACI 318, SECTION 6.3, ARE PERMITTED TO |
| | BE EMBEDDED IN CONCRETE WITH APPROVAL OF THE REGISTERED |
| | DESIGN PROFESSIONAL. PLEASE SUBMIT APPROVAL FROM DESIGN |
| | ENGINEER. SLEEVES MAY BE REQUIRED. SECTION 305. |
| | |
| | 39. SHT P2.3.1 SANT. RISER #1 DESIGNATOR IS NOT |
| | LEGIBLE. SECTION 106.1.1. |
| | |
| | 40. SHT P2.3.1 CONDENSATE RISER #1&2 AND SANT. RISER #1 |
| | ARE SHOWN IN A SOLID WALL. PER SECTION 1906.3 CONDUITS |
| | AND PIPES EMBEDDED IN CONCRETE. CONDUITS, PIPES AND |
| | SLEEVES OF ANY MATERIAL NOT HARMFUL TO CONCRETE AND |
| | WITHIN THE LIMITATIONS OF ACI 318, SECTION 6.3, ARE |
| | PERMITTED TO BE EMBEDDED IN CONCRETE WITH APPROVAL OF |
| | THE REGISTERED DESIGN PROFESSIONAL. PLEASE SUBMIT |
| | APPROVAL FROM DESIGN ENGINEER. SLEEVES MAY BE REQUIRED. |
| | SECTION 305. |
| | |
| | 41. SHT P2.3.1 SHOW THE LOCATION OF CONDENSATE RISER |
| | 1/2. SECTION 106.1.2. |
| | |
| | 42. SHT P2.3.1 SANITARY RISER #9 BRANCH LINE RUNNING |
| | THRU A COLUMN. PER SECTION 1906.3 CONDUITS AND PIPES |
| | EMBEDDED IN CONCRETE. CONDUITS, PIPES AND SLEEVES OF |
| | ANY MATERIAL NOT HARMFUL TO CONCRETE AND WITHIN THE |
| | LIMITATIONS OF ACI 318, SECTION 6.3, ARE PERMITTED TO |
| | BE EMBEDDED IN CONCRETE WITH APPROVAL OF THE REGISTERED |
| | DESIGN PROFESSIONAL. PLEASE SUBMIT APPROVAL FROM DESIGN |
| | ENGINEER. SLEEVES MAY BE REQUIRED. SECTION 305. |
| | |
| | 43. SHT P2.3.1. SANITARY RISER #6 BRANCH LINE RUNNING |
| | THRU A COLUMN. PER SECTION 1906.3 CONDUITS AND PIPES |
| | EMBEDDED IN CONCRETE. CONDUITS, PIPES AND SLEEVES OF |
| | ANY MATERIAL NOT HARMFUL TO CONCRETE AND WITHIN THE |
| | LIMITATIONS OF ACI 318, SECTION 6.3, ARE PERMITTED TO |
| | BE EMBEDDED IN CONCRETE WITH APPROVAL OF THE REGISTERED |
| | DESIGN PROFESSIONAL. PLEASE SUBMIT APPROVAL FROM DESIGN |
| | ENGINEER. SLEEVES MAY BE REQUIRED. SECTION 305. |
| | |
| | 44. SHT P2.3.2 THE TITLE BLOCK READS DRAINAGE PLAN 2ND |
| | FLOOR, BUT THE PAGE TITLE INDICATEDS 3RD FLOOR. PLEASE |
| | CLARIFY. SECTION 106.1.1. |
| | |
| | 45. SHT P2.3.2 SDR 10 & ODR SDR 10 ARE SHOWN IN A |
| | COLUMN. PER SECTION 1906.3 CONDUITS AND PIPES EMBEDDED |
| | IN CONCRETE. CONDUITS, PIPES AND SLEEVES OF ANY |
| | MATERIAL NOT HARMFUL TO CONCRETE AND WITHIN THE |
| | LIMITATIONS OF ACI 318, SECTION 6.3, ARE PERMITTED TO |
| | BE EMBEDDED IN CONCRETE WITH APPROVAL OF THE REGISTERED |
| | DESIGN PROFESSIONAL. PLEASE SUBMIT APPROVAL FROM DESIGN |
| | ENGINEER. SLEEVES MAY BE REQUIRED. SECTION 305. |
| | |
| | 46. SHT P2.3.2SANITARY RISERS 16, 19, 20 & 25 SHOW |
| | BRANCH LINES RUNNING THRU COLUMNS. PER SECTION 1906.3 |
| | CONDUITS AND PIPES EMBEDDED IN CONCRETE. CONDUITS, |
| | PIPES AND SLEEVES OF ANY MATERIAL NOT HARMFUL TO |
| | CONCRETE AND WITHIN THE LIMITATIONS OF ACI 318, SECTION |
| | 6.3, ARE PERMITTED TO BE EMBEDDED IN CONCRETE WITH |
| | APPROVAL OF THE REGISTERED DESIGN PROFESSIONAL. PLEASE |
| | SUBMIT APPROVAL FROM DESIGN ENGINEER. SLEEVES MAY BE |
| | REQUIRED. SECTION 305. |
| | |
| | 47. SHT P2.3.2 REQUIRED SECONDARY DRAINS/SCUPPERS ARE |
| | NOT SHOWN. SECTION 1107. PLEASE SHOW THE LOCATION OF |
| | REQUIRED SECONDARY DRAINS OR OVERFLOW SCUPPERS AND |
| | INDICATE THE SQUARE FOOTAGE BEING DRAINED BY EACH |
| | DRAIN/SCUPPER. |
| | |
| | 48. SHT P2.3.1E FOUR PLANTERS HAVE VERTICAL |
| | CONTRIBUTION NOT INDICATED IN THE CALCULATIONS. PLEASE |
| | SHOW ALL SQUARE FOOTAGE DRAINED BY THE PLANTER DRAINS. |
| | TABLE 1106.3. |
| | |
| | 49. SHT P2.3.1E THE DISTANCE FROM THE DECK DRAINS IN |
| | THE PATIO TO THE SLIDING GLASS DOORS TO EACH UNIT US |
| | ABOUT 1/2 THE DISTANCE TO THE OVERFLOW LINE OUT OF THE |
| | PATIO AREA. IS THERE ANY CONCERN THAT THE STORM WATER |
| | WILL ENTER THE UNIT BEFORE OVERFLOWING OFF THE PATIO IF |
| | THERE IS A BLOCKAGE IN THE MAIN DECK DRAIN? PLEASE |
| | CLARIFY. SECTION 106.1.2. |
| | |
| | 50. SHT P2.3.2E REQUIRED SECONDARY DRAINS/SCUPPERS ARE |
| | NOT SHOWN. SECTION 1107. PLEASE SHOW THE LOCATION OF |
| | REQUIRED SECONDARY DRAINS OR OVERFLOW SCUPPERS AND |
| | INDICATE THE SQUARE FOOTAGE BEING DRAINED BY EACH |
| | DRAIN/SCUPPER. |
| | |
| | 51. SHT P2.4.1 SHOW THE RISER NUMBER FOR THE SANITARY |
| | RISERS AT THE SHOWER, LAV, W/C PORTION OF THE MASTER |
| | BATH, C-2 UNIT (414), & THE TUB, W/C, LAV BATH C-2 UNIT |
| | (415). SECTION 106.1.2. |
| | |
| | 52. SHT P2.4.1 WEST SECTION DRAINAGE PLAN? (SAME AS SHT |
| | P2.4.2). PLEASE CLARIFY. SECTION 106.1.1. |
| | |
| | 53. SHT P2.4.2 SHT TITLE STATES 4TH - 6TH FLOORS, BUT |
| | 5TH FLOOR & 6TH - 7TH FLOORS SUBMITTED ALSO. PLEASE |
| | CLARIFY. SECTION 106.1.1. |
| | |
| | 54. SHT P2.4.2 SHOW THE PIPING FOR TWO RISERS #8. |
| | SECTION 106.1.2. |
| | |
| | 55. SHT P2.4.2 INDICATE THE RISER NUMBER FOR THE MOP |
| | SINK SANITARY. SECTION 106.1.2 |
| | |
| | 56. SHT P2.4.2 SANITARY RISER #13 IS SHOWN IN A SOLID |
| | WALL. PER SECTION 1906.3 CONDUITS AND PIPES EMBEDDED IN |
| | CONCRETE. CONDUITS, PIPES AND SLEEVES OF ANY MATERIAL |
| | NOT HARMFUL TO CONCRETE AND WITHIN THE LIMITATIONS OF |
| | ACI 318, SECTION 6.3, ARE PERMITTED TO BE EMBEDDED IN |
| | CONCRETE WITH APPROVAL OF THE REGISTERED DESIGN |
| | PROFESSIONAL. PLEASE SUBMIT APPROVAL FROM DESIGN |
| | ENGINEER. SLEEVES MAY BE REQUIRED. SECTION 305. |
| | |
| | 57. SHT P2.4.2 SANITARY RISER NUMBERS 16,19 & 20 ARE |
| | NOT SHOWN IN THE SAME LOCATION ON THE FLOOR BELOW, |
| | (P2.3.2), AT THE TUB BATHS. ARE THE RISERS OFFSET? IF |
| | SO SHOW ON THE FLOOR PLAN AND THE RISER DIAGRAMS. |
| | SECTION 106.1.1. |
| | |
| | 58. SHT P2.4.2 SHOW THE RISER NUMBER FOR THE |
| | LAV/JACUZZI RISER IN THE C-2E UNIT, (425). SECTION |
| | 106.1.1. |
| | |
| | 59. SHT P2.4.2 RISER DIAGRAM 23 IS NOT INDICATED FOR |
| | EACH RISER, (3). PLEASE INDICATE ALL RISER NUMBERS. |
| | SECTION 106.1.2. |
| | |
| | 60. SHT P2.5.1 SANITARY RISER NUMBER IS NOT INDICATED |
| | FOR THE W/M STACK BY STAIR #3. PLEASE IDENTIFY. SECTION |
| | 106.1.2. |
| | |
| | 61. SHT P2.5.2 SANITARY RISERS 10 & 13, CONDENSATE |
| | RISER 11, AND RISER 9 WITH PLAN NOTE NUMBER 3 ARE |
| | EITHER IN A SOLID WALL OR PASSING THRU A COLUMN. PER |
| | SECTION 1906.3 CONDUITS AND PIPES EMBEDDED IN CONCRETE. |
| | CONDUITS, PIPES AND SLEEVES OF ANY MATERIAL NOT HARMFUL |
| | TO CONCRETE AND WITHIN THE LIMITATIONS OF ACI 318, |
| | SECTION 6.3, ARE PERMITTED TO BE EMBEDDED IN CONCRETE |
| | WITH APPROVAL OF THE REGISTERED DESIGN PROFESSIONAL. |
| | PLEASE SUBMIT APPROVAL FROM DESIGN ENGINEER. SLEEVES |
| | MAY BE REQUIRED. SECTION 305. |
| | |
| | 62. SHT P2.5.2 INDICATE THE RISER NUMBER FOR THE MOP |
| | SINK. SECTION 105.1.2. |
| | |
| | 63. SHTS P2.5.1 & P2.5.2 INDICATED TYPICAL 5TH FLOOR. |
| | PLEASE CLARIFY. SECTION 106.1.1. |
| | |
| | 64. SHT P2.6.2 SANITARY RISERS 10 & 13, CONDENSATE |
| | RISER 11, AND RISER 9 WITH PLAN NOTE NUMBER 3 ARE |
| | EITHER IN A SOLID WALL OR PASSING THRU A COLUMN. PER |
| | SECTION 1906.3 CONDUITS AND PIPES EMBEDDED IN CONCRETE. |
| | CONDUITS, PIPES AND SLEEVES OF ANY MATERIAL NOT HARMFUL |
| | TO CONCRETE AND WITHIN THE LIMITATIONS OF ACI 318, |
| | SECTION 6.3, ARE PERMITTED TO BE EMBEDDED IN CONCRETE |
| | WITH APPROVAL OF THE REGISTERED DESIGN PROFESSIONAL. |
| | PLEASE SUBMIT APPROVAL FROM DESIGN ENGINEER. SLEEVES |
| | MAY BE REQUIRED. SECTION 305. |
| | |
| | 65. SHT P2.6.2 INDICATE THE RISER NUMBER FOR THE MOP |
| | SINK. SECTION 105.1.2. |
| | |
| | 66. SHT P2.7.1 ROOF DRAINS DO NOT APPEAR TO BE LOCATED |
| | AT THE LOW POINT OF THE ROOF. PLEASE SUBMIT ELEVATIONS |
| | AT DIFFERENT AREAS OF THE ROOF SHOWING THE LOW POINTS |
| | AND THE HIGH POINTS OF THE ROOF TO VERIFY PROPER |
| | DRAINAGE TO THE ROOF DRAINS. SECTION 106.1.2. THE |
| | PRIMARY AND SECONDARY ROOF DRAINS APPEAR TO BE IN LINE, |
| | BUT NOT NEXT TO EACH OTHER BEFORE OFFSETTING IN |
| | DIFFERENT DIRECTIONS. THE FLOORS BELOW SHOW THE PRIMARY |
| | AND SECONDARY RISERS NEXT TO EACH OTHER ON EACH FLOOR |
| | PLAN. PLEASE CORRELATE THE ROOF DRAIN AND OFFSETS WITH |
| | THE FLOOR PLANS BELOW. SECTION 106.1.1. |
| | |
| | 67. SHT P2.7.2 ROOF DRAINS DO NOT APPEAR TO BE LOCATED |
| | AT THE LOW POINT OF THE ROOF. PLEASE SUBMIT ELEVATIONS |
| | AT DIFFERENT AREAS OF THE ROOF SHOWING THE LOW POINTS |
| | AND THE HIGH POINTS OF THE ROOF TO VERIFY PROPER |
| | DRAINAGE TO THE ROOF DRAINS. SECTION 106.1.2. THE |
| | PRIMARY AND SECONDARY ROOF DRAINS APPEAR TO BE IN LINE, |
| | BUT NOT NEXT TO EACH OTHER BEFORE OFFSETTING IN |
| | DIFFERENT DIRECTIONS. THE FLOORS BELOW SHOW THE PRIMARY |
| | AND SECONDARY RISERS NEXT TO EACH OTHER ON EACH FLOOR |
| | PLAN. PLEASE CORRELATE THE ROOF DRAIN AND OFFSETS WITH |
| | THE FLOOR PLANS BELOW. SECTION 106.1.1. |
| | |
| | 68. SHT P2.7.2 THE DRAINS FOR CCC-1, CCC-2, & CCC-3 THE |
| | MAXIMUM DISTANCE FROM THE TRAP TO THE VENT IS 12. ALL |
| | THREE EXCEED THIS LIMIT. TABLE 906.1. |
| | |
| | 69. SHT P2.7.2 SHOW THE VENT THRU ROOF LOCATION FOR ALL |
| | SANITARY RISER DIAGRAMS AND FOR THE CONDENSATE VENT |
| | THRU THE ROOF. SECTION 106.1.2. |
| | |
| | 70. SHT P2.7.2 ONE ROOF AREA "?" SHOWS NO SLOPE TO |
| | DRAIN. PLEASE INDICATE SLOPE TO ROOF DRAIN. SECTION |
| | 106.1.2. |
| | |
| | 71. SHT P2.7.2 ONE ROOF AREA "?" ROOF DRAIN AND OD NOT |
| | LABELED. PLEASE INDICATE WHICH IS THE ROOF DRAIN AND |
| | WHICH IS THE OD. SECTION 106.1.1. |
| | |
| | 72. SHT P2.7.2 PLAN NOTES (3) &(4). MORE INFORMATION IS |
| | REQUIRED. WHAT DRAINS FROM CCC-1, CCC-2 & CCC-3. IF THE |
| | DRAINAGE IS CONDENSATE, THEN IT SHALL NOT DRAIN INTO |
| | THE SANITARY SYSTEM. ARTICLE III SECTION 90-125(5)-- |
| | PLEASE INDICATE WHAT DRAINS FROM THE UNITS AND IF IT |
| | SHALL INDEED DRAIN INTO THE SANITARY SYSTEM, THEN |
| | SUBMIT A DETAIL SHOWING HOW STORM WATER WILL NOT DRAIN |
| | INTO THE FUNNEL DRAIN. SECTION 106.1.2. |
| | |
| | 73. SHT P3.1.2 IDENTIFY THE GAS PIPING TO REFLECT THE |
| | PIPING LEGEND ON SHT P0.1. |
| | |
| | 74. SHT P3.1.2 INDICATE THE MATERIAL USED FOR THE 3" |
| | UNDERGROUND WATER SERVICE TO THE PUMP ROOM. MATERIAL |
| | SHALL COMPLY WITH TABLE 605.3 AND SECTION 605.3. |
| | |
| | 75. SHT P3.2.1 SHOWS THE HOT & COLD WATER LINES THRU A |
| | COLUMN. SLEEVES MAY BE REQUIRED, AND PER SECTION 1906.3 |
| | CONDUITS AND PIPES EMBEDDED IN CONCRETE. |
| | CONDUITS, PIPES AND SLEEVES OF ANY MATERIAL NOT HARMFUL |
| | TO CONCRETE AND WITHIN THE LIMITATIONS OF ACI 318, |
| | SECTION 6.3, ARE PERMITTED TO BE EMBEDDED IN CONCRETE |
| | WITH APPROVAL OF THE REGISTERED DESIGN PROFESSIONAL. |
| | PLEASE SUBMIT APPROVAL FROM DESIGN ENGINEER. SECTION |
| | 305.3 SLEEVES MAY BE REQUIRED. |
| | |
| | 76. SHT P3.2.1 IDENTYFY ALL PIPING SYSTEMS, HOT, COLD & |
| | GAS LINES. UNABLE TO VERIFY CODE COMPLIANCE UNTIL ALL |
| | LINES ARE IDENTIFIED. SECTION 106.1.2. |
| | |
| | 77 SHT P3.2.1 HAS A NOTE THAT STATES "SEE RETAIL WATER |
| | SUPPL RISER ON SHT P7.1". SHT P7.1 NOT SUBMITTED, NOR |
| | IS IT INDICATED ON THE PLUMBING SHEET INDEX SHT P0.1. |
| | PLEASE CLARIFY. SECTION 106.1.1. |
| | |
| | 78. SHT P3.2.2 IDENTYFY ALL PIPING SYSTEMS, HOT, COLD & |
| | GAS LINES. UNABLE TO VERIFY CODE COMPLIANCE UNTIL ALL |
| | LINES ARE IDENTIFIED. SECTION 106.1.2. |
| | |
| | 79. SHT P3.2.2 WATER RISER 13 IS SHOWN THRU A COLUMN. |
| | PER SECTION 1906.3 CONDUITS AND PIPES EMBEDDED IN |
| | CONCRETE. CONDUITS, PIPES AND SLEEVES OF ANY MATERIAL |
| | NOT HARMFUL TO CONCRETE AND WITHIN THE LIMITATIONS OF |
| | ACI 318, SECTION 6.3, ARE PERMITTED TO BE EMBEDDED IN |
| | CONCRETE WITH APPROVAL OF THE REGISTERED DESIGN |
| | PROFESSIONAL. PLEASE SUBMIT APPROVAL FROM DESIGN |
| | ENGINEER. SECTION 305.3 SLEEVES MAY BE REQUIRED. |
| | |
| | 80. SHT P3.2.2 WATER RISER 23 DOES NOT SHOW A |
| | CONNECTION TO THE WATER MAIN. SECTION 106.1.2. PLEASE |
| | INDICATE WHERE THE RISER CONNECTS TO THE WATER MAIN. |
| | |
| | 81. SHT P3.3.1 TWO SHEETS WITH THE SAME NUMBER AND SAME |
| | INFORMATION SUBMITTED.DELETE ONE. SECTION 106.1.1. |
| | |
| | 82.SHT P3.3.2 SHOWS RISER 11 IN A COLUMN. PER SECTION |
| | 1906.3 CONDUITS AND PIPES EMBEDDED IN CONCRETE. |
| | CONDUITS, PIPES AND SLEEVES OF ANY MATERIAL NOT HARMFUL |
| | TO CONCRETE AND WITHIN THE LIMITATIONS OF ACI 318, |
| | SECTION 6.3, ARE PERMITTED TO BE EMBEDDED IN CONCRETE |
| | WITH APPROVAL OF THE REGISTERED DESIGN PROFESSIONAL. |
| | PLEASE SUBMIT APPROVAL FROM DESIGN ENGINEER. SECTION |
| | 305.3 SLEEVES MAY BE REQUIRED. ALSO THE RISER STARTED |
| | OUT WITH 3 SLEEVES FOR COLD WATER, GAS & HOT WATER. |
| | |
| | 83. SHT P3.4.2 SHOWS RISER 11 IN A COLUMN. PER SECTION |
| | 1906.3 CONDUITS AND PIPES EMBEDDED IN CONCRETE. |
| | CONDUITS, PIPES AND SLEEVES OF ANY MATERIAL NOT HARMFUL |
| | TO CONCRETE AND WITHIN THE LIMITATIONS OF ACI 318, |
| | SECTION 6.3, ARE PERMITTED TO BE EMBEDDED IN CONCRETE |
| | WITH APPROVAL OF THE REGISTERED DESIGN PROFESSIONAL. |
| | PLEASE SUBMIT APPROVAL FROM DESIGN ENGINEER. SECTION |
| | 305.3 SLEEVES MAY BE REQUIRED. ALSO THE RISER STARTED |
| | OUT WITH 3 SLEEVES FOR COLD WATER, GAS & HOT WATER. |
| | |
| | 84. SHT P3.5.2 SHOWS RISER 11 IN A COLUMN. PER SECTION |
| | 1906.3 CONDUITS AND PIPES EMBEDDED IN CONCRETE. |
| | CONDUITS, PIPES AND SLEEVES OF ANY MATERIAL NOT HARMFUL |
| | TO CONCRETE AND WITHIN THE LIMITATIONS OF ACI 318, |
| | SECTION 6.3, ARE PERMITTED TO BE EMBEDDED IN CONCRETE |
| | WITH APPROVAL OF THE REGISTERED DESIGN PROFESSIONAL. |
| | PLEASE SUBMIT APPROVAL FROM DESIGN ENGINEER. SECTION |
| | 305.3 SLEEVES MAY BE REQUIRED. ALSO THE RISER STARTED |
| | OUT WITH 3 SLEEVES FOR COLD WATER, GAS & HOT WATER. |
| | |
| | 85. SHT P3.6.2 SHOWS RISER 11 IN A COLUMN. PER SECTION |
| | 1906.3 CONDUITS AND PIPES EMBEDDED IN CONCRETE. |
| | CONDUITS, PIPES AND SLEEVES OF ANY MATERIAL NOT HARMFUL |
| | TO CONCRETE AND WITHIN THE LIMITATIONS OF ACI 318, |
| | SECTION 6.3, ARE PERMITTED TO BE EMBEDDED IN CONCRETE |
| | WITH APPROVAL OF THE REGISTERED DESIGN PROFESSIONAL. |
| | PLEASE SUBMIT APPROVAL FROM DESIGN ENGINEER. SECTION |
| | 305.3 SLEEVES MAY BE REQUIRED. ALSO THE RISER STARTED |
| | OUT WITH 3 SLEEVES FOR COLD WATER, GAS & HOT WATER. |
| | |
| | 86. SHT P3.6.2 OFFSET FOR RISER 23 NOT SHOWN ON THE |
| | FLOOR PLAN. SECTION 106.1.2. |
| | |
| | 87. SHT P3.7.2 RISER 11 STARTED OUT WITH 3 SLEEVES FOR |
| | COLD WATER, GAS & HOT WATER, BUT NOW SHOWS 2. CLARIFY & |
| | CORRELATE. SECTION 106.1.1. |
| | |
| | 88. SHT 3.7.2 NOTE INDICATES HOT WATER "UP TO" WATER |
| | HEATERS, BUT FROM THE HOT RISER DIAGRAM, IT APPEARS |
| | THAT IT SHOULD READ HOT WATER "DOWN FROM" THE WATER |
| | HEATERS. PLEASE CLARIFY. SECTION 106.1.1. |
| | |
| | 89. SHT P3.8.1 THE WATER SUPPLY ROOF PLAN EAST SECTION |
| | SHOWS NO WATER. PLEASE CLARIFY. SECTION 106.1.1. PLEASE |
| | INDICATE WHERE THE WATER IS LOCATED. |
| | |
| | 90. SHT P3.8.2 PRV SET AT 7"W.C. SUBMIT THE TABLE FOR |
| | THE GAS PRESSURE AT 7" W.C. AS THE MINIMUM PRESSURE |
| | TABLE IN FBC-2004 FUEL GAS IS .5PSI. |
| | |
| | 91. SHT P3.8.2 IDENTIFY WHAT THE GAS LINE THAT CONNECTS |
| | TO THE RISER AND IS ROUTED TO THE AREA BY THE |
| | CIRCULATION PUMP FOR THE RECIRCULATION OF HOT WATER. |
| | WHERE IS THE HVAC SYSTEM W/H (200KBTUH MAX) AS THE GAS |
| | APPLIANCE IS NOT SHOWN ON THE FLOOR PLAN. SECTION |
| | 106.1.2. |
| | |
| | 92. SHT P3.8.2 NOTE STATES, "GAS, CW AND RECIRC. PIPING |
| | DOWN", WHEN IT IS ACTUALLY FEEDING UP TO THE ROOF. |
| | PLEASE CLARIFY. SECTION 106.1.1. |
| | |
| | 93. SHT P4.1.1 WATER SUPPLY PLANS FOR UNITS C1, C1A & |
| | CAB. WATER HAMMER ARRESTORS ARE REQUIRED FOR BOTH THE |
| | HOT & COLD WATER AT THE WASH MACHINE. SECTION 604.9. |
| | |
| | 94. SHT P4.1.6 WATER SUPPLY PLANS FOR UNITS TH2, & TH2A |
| | THE WATER HAMMER ARRESTORS ARE REQUIRED AT THE WASH |
| | MACHINES BY SECTIONS 604.9. |
| | |
| | 95. SHT P4.1.7WATER SUPPLY PLANS FOR UNITS TH2B, & |
| | TH2C THE WATER HAMMER ARRESTORS ARE REQUIRED AT THE |
| | WASH MACHINES BY SECTIONS 604.9.--ALSO SHOW THE |
| | PIPING TO THE W/C 2ND FLOOR OF TH2B & THE W/C IN TH2C |
| | IS NOT LOCATED WHERE THE WATER LINE IS SHOWN. PLEASE |
| | CLARIFY. IF THE FLOOR PLAN IS DIFFERENT, THAN THE WATER |
| | RISER DIAGRAM CAN NOT BE TYPICAL AND A SEPARATE |
| | ISOMETRIC RISER DIAGRAM IS REQUIRED.SECTIONS 106.1.1 |
| | & 106.3.5.1.3. |
| | |
| | 96. SHT P5.1.1 THE SANITARY RISER ISOMETRIC DOES NOT |
| | REFLECT THE FLOOR PLAN AT THE BASE OF SANITARY RISERS |
| | 11 & 25. PLEASE CORRELATE. SECTION 106.1.1. |
| | |
| | 97. SHT P5.1.1 SANITARY RISER 27 DOES NOT REFLECT THE |
| | FLOOR PLAN AT THE 2ND FLOOR TOILET ROOM. PLEASE |
| | CORRELATE. SECTION 106.1.1. |
| | |
| | 98. SHT P5.1.1 EXPLAIN THE HORIZONTAL BRANCH LINE FROM |
| | SANITARY RISER 17 TO SANITARY RISER 13. SECTION |
| | 106.1.1. |
| | |
| | 99. SHT P5.1.1 THE VENTING DOES NOT REFLECT THE FLOOR |
| | PLAN BY RISERS 17 & 20. PLEASE CORRELATE. SECTION |
| | 106.1.1. |
| | |
| | 100. SHT P5.1.1 THE WASH MACHINE PIPING AND W/M BOX |
| | LOCATION DOES NOT REFLECT THE FLOOR PLAN BY SANITARY |
| | RISERS 17 & 22. PLEASE CORRELATE. SECTION 106.1.1. |
| | |
| | 101. SHT P5.1.1 THE OFFSET SHOWN ON THE FLOOR PLAN AT |
| | THE TOP OF THE RISER TO THE 2ND FLOOR FIXTURES IN UNIT |
| | TH2B IS NOT REFLECTED ON THE RISER DIAGRAM. PLEASE |
| | CORRELATE. SECTION 106.1.1. |
| | |
| | 102. SHT P5.1.1 EXPLAIN THE BRANCH LINE & CLEANOUT PAST |
| | RISER 26 ON THE RISER DIAGRAM.THIS IS NOT SHOWN ON |
| | THE FLOOR PLAN. PLEASE CORRELATE. SECTION 106.1.1. |
| | |
| | 103. SHT P5.1.2 THE SANITARY DRAINAGE ISOMETRIC DOES |
| | NOT REFLECT THE FLOOR PLAN AT THE VENTING, WASH MACHINE |
| | BOX & OFFSET ON THE SECOND FLOOR FOR TH2. PLEASE |
| | CORRELATE. SECTION 106.1.1. |
| | |
| | 104. SHT P5.1.2 THE BUILDING DRAIN CLEANOUT IS MISSING |
| | UPSTREAM OF TH2 AS INDICATED ON THE FLOOR PLAN. PLEASE |
| | CORRELATE. SECTION 106.1.1. |
| | |
| | 105. SHT P5.1.2 THE UNIT TH1D THE LAUNDRY BOX AND |
| | OFFSET AT THE TOP OF THE RISER TO THE 2ND FLOOR DOES |
| | NOT REFLECT THE FLOOR PLAN. PLEASE CORRELATE. SECTION |
| | 106.1.1. |
| | |
| | 106. SHT P5.1.2THE CLEANOUT UPSTREAM OF UNIT TH1D IS |
| | NOT SHOWN ON THE FLOOR PLAN. PLEASE CORRELATE. SECTION |
| | 106.1.1. |
| | |
| | 107. SHT P5.1.2THE RISER UPSTREAM OF UNIT TH1D DOES |
| | NOT REFLECT THE FLOOR PLAN. THE OFFSET IS NOT SHOWN & |
| | NO SANT PLUMBING FOR THE POOL ELECTRICAL ROOM FLOOR |
| | DRAIN. PLEASE CORRELATE. SECTION 106.1. |
| | |
| | 108. SHT P5.1.2THE BUILDING SANT. DRAIN JUNCTION BY |
| | THE 6" 160 DFU & 6" 495 DFU DOES NOT REFLECT YTHE FLOOR |
| | PLAN. PLEASE CORRELATE. SECTION 106.1. |
| | |
| | 109. SHT P5.1.2 THE CLEANOUT IS MISSING UPSTREAM OF |
| | RISER JUST UPSTREAM OF UNITS TH1D AND IS SHOWN |
| | DOWNSTREAM OF SANT. RISER 5 ON THE FLOOR PLAN BUT |
| | UPSTREAM OF SANT. RISER 5 ON THE RISER DIAGRAM. PLEASE |
| | CORRELATE. SECTION 106.1. |
| | |
| | 110. SHT P5.1.2 DOES NOT REFLECT THE FLOOR PLAN AT THE |
| | WASH MACHINE BOX AND AT THE TOP OF THE RISER TO THE 2ND |
| | FLOOR. PLEASE CORRELATE. SECTION 106.1. |
| | |
| | 111. SHT P5.1.2 SANITARY RISER 8 BRANCH LINE DOES NOT |
| | REFLECT THE FLOOR PLAN AS IT DOES NOT INDICATE THE |
| | LOCATION IN RESPECT TO RISERS 6 & 7. PLEASE CORRELATE. |
| | SECTION 106.1. |
| | |
| | 112. SHT P5.1.3 SANITARY RISERS 12 & 13 VENT SHALL |
| | CONNECT TO THE DRAINAGE STACK. SECTION 903.4 |
| | |
| | 113. SHT P5.1.3 SANITARY RISER 4 DOES NOT REFLECT THE |
| | FLOOR PLAN WHERE THE LAV STACK CONNECTS TO THE DRAIN |
| | LINE, (PRIOR TO MASTER BATH), AND AT THE LAV IN THE TUB |
| | BATH AS WELL AS AT THE BASE OF THE RISER TO LAV AT THE |
| | 3RD FLOOR. PLEASE CORRELATE. SECTION 106.1. |
| | |
| | 114. SHT P5.1.3 SANITARY RISER 6 DOES NOT REFLECT THE |
| | FLOOR PLAN FOR THE 3RD FLOOR TUB BATHAT THE LAV. |
| | PLEASE CORRELATE. SECTION 106.1. |
| | |
| | 115. SHT P5.1.3 SANITARY RISER 8 DOES NOT REFLECT THE |
| | FLOOR PLAN WHERE THE WASH MACHINE BRANCH LINES CONNECT |
| | TO THE BUILDING DRAIN LINE AND ONLY ONE BRANCH LINE IS |
| | SHOWN WHERE THERE ARE TWO BRANCH LINES ON THE FLOOR |
| | PLAN. ALSO WHERE THE DOUBLE LAV BRANCH LINE CONNECTS TO |
| | BLDG DRAIN. PLEASE CORRELATE. SECTION 106.1. |
| | |
| | 116. SHT ??? SHEET BETWEEN P5.1.3 & P5.1.5 IS MISSING |
| | THE TITLE BLOCK INFORMATION AND PAGE NUMBER. PLEASE |
| | CLARIFY AND MAKE SURE THE TITLE BLOCK AND SHEET NUMBER |
| | ARE INDICATED. (SHOWN AS P5.1.4 ON SECOND SET OF |
| | PLANS). |
| | |
| | 117. SHT P5.1.4SANITARY RISER 9, MINIMUM 3" REQUIRED |
| | TO THE WASH MACHINE. SECTION 406.3.--CLEANOUT PAST |
| | THE WATER CLOSET IS NOT SHOWN ON THE FLOOR PLAN.-- |
| | THE VENT SHALL CONNECT TO THE DRAINAGE STACK AT THE TUB |
| | BATH RISER. SECTION 903.4.--THE FLOOR DRAIN FOR THE |
| | WATER HEATER ROOM IS SHOWN ON THE 5TH, 6TH & 7TH FLOORS |
| | ON THE FLOOR PLAN. PLEASE CORRELATE. SECTION 106.1. |
| | |
| | 118. SHT P5.1.4 SANITARY RISER 13 DOES NOT REFLECT THE |
| | FLOOR PLAN ON THE SECOND FLOOR. PLEASE CORRELATE. |
| | SECTION 106.1. |
| | |
| | 119. SHT P5.1.4 SANITARY RISER 15 DOES NOT REFLECT THE |
| | OFFSET SHOWN ON FLOOR PLAN. PLEASE CORRELATE. SECTION |
| | 106.1. |
| | |
| | 120. SHT P5.1.4 SANITARY RISER 16/20 DOES NOT REFLECT |
| | THE FLOOR PLAN AT EITHER WASH MACHINE BRANCH LINES & |
| | WHERE THE LAV FOR THE TUB BATH CONNECTS TO THE STACK. |
| | ALSO THE DRAIN LINE FOR THE CCC UNITS DOES NOT REFLECT |
| | THE FLOOR PLAN. PLEASE CORRELATE. SECTION 106.1. |
| | |
| | 121 SHT P5.1.4 SANITARY RISER 17 DOES NOT REFLECT THE |
| | FLOOR PLAN AT OFFSETS PRIOR TO STACK AND STACK FOR |
| | JACUZZ I/LAV IS NOT SHOWN ON THE FLOOR PLAN. PLEASE |
| | CORRELATE. SECTION 106.1. |
| | |
| | 122. SHT P5.1.5 RISER DIAGRAM #18 DOES NOT REFLECT THE |
| | FLOOR PLAN AT THE BASE OF BOTH WASH MACHINES RISERS. |
| | THE FLOOR PLAN SHOWS THE LAUNDRY BOX BETWEEN THE |
| | RISERS. PLEASE CLARIFY. SECTION 106.1.1. PLEASE MAKE |
| | SURE THE RISER DIAGRAM REFLECTS THE PIPING ON THE FLOOR |
| | PLAN. |
| | |
| | 123. SHT P5.1.5 RISER DIAGRAM #19 DOES NOT REFLECT THE |
| | FLOOR PLAN AT THE BASE OF THE WASH MACHINE RISERS FOR |
| | THE OFFSETS AND THE LAUNDRY BOX SHOWN BETWEEN THE |
| | RISERS. NOR DOES IT REFLECT THE FLOOR PLAN WHERE THE |
| | BRANCH CONNECTION FOR THE JACUZZI TUB/LAV TO DRAIN LINE |
| | AS WELL AS THE LAV ARM IN THE SHOWER BATH. SECTION |
| | 106.1.1. PLEASE MAKE SURE THE RISER DIAGRAM REFLECTS |
| | THE PIPING ON THE FLOOR PLAN. |
| | |
| | 124. SHT P5.1.5 RISER DIAGRAM #21 DOES NOT REFLECT THE |
| | FLOOR PLAN AT THE BRANCH LINE TO THE |
| | KITCHEN/LAV/JACUZZI & AT THE WASH MACHINE RISERS WHERE |
| | THEY CONNECT TO THE DRAIN LINE. SECTION 106.1.1. PLEASE |
| | MAKE SURE THE RISER DIAGRAM REFLECTS THE PIPING ON THE |
| | FLOOR PLAN. |
| | |
| | 125. SHT P5.1.5 RISER DIAGRAM #25 DOES NOT REFLECT THE |
| | FLOOR PLAN AT THE BASE OF THE WASH MACHINE STACK, OFF |
| | SET NOT SHOWN AND JACUZZI TUB IS NOT LEFT OF STACK. |
| | SECTION 106.1.1. PLEASE MAKE SURE THE RISER DIAGRAM |
| | REFLECTS THE PIPING ON THE FLOOR PLAN. |
| | |
| | 126. SHT P5.1.5 RISER DIAGRAM #26 DOES NOT REFLECT THE |
| | FLOOR PLAN AT THE WASH MACHINE STACK BASE, (LAUNDRY BOX |
| | SHOWN BETWEEN THE W/M STACKS), AND AT THE LAV ARM IN |
| | THE TUB BATH ALL FLOORS.--A DRY HORIZONTAL VENT IS |
| | SHOWN UPSTREAM OF THE W/C AT THE BASE OF THE W/C STACK. |
| | SECTION 106.1.1. DRY HORIZONTAL VENTS ARE NOT APPROVED. |
| | PLEASE MAKE SURE THE RISER DIAGRAM REFLECTS THE PIPING |
| | ON THE FLOOR PLAN AND MEETS CODE REQUIREMENTS. SECTION |
| | 905.3. |
| | |
| | 127. SHT P6.1.1 RISER DOES NOT REFLECT THE FLOOR PLAN. |
| | SHOW ALL OFFSETS, CONNECTIONS TO MAINS ETC TO REFLECT |
| | THE FLOOR PLAN.--2 COLD LINES FROM PUMP ROOM AND |
| | AROUND THE 2ND FLOOR SHOWN ON THE FLOOR PLAN ARE NOT ON |
| | THE RISER DIAGRAM. THERE IS NO SUPPLY TO THE MOP SINK |
| | RISER, NOR IS THERE SUPPLY TO THE TOILET ROOM. ALL "TH" |
| | UNITS SHOW CONNECTING TO A SECOND WATER MAIN. WATER |
| | PIPING TO WATER HEATER ON THE 3RD FLOOR AND RELATED |
| | PIPING DOES NOT REFLECT THE FLOOR PLAN. PIPING AT THE |
| | BASE OF SOME RISERS DOES NOT REFLECT THE FLOOR PLAN. |
| | ALSO THE COLD WATER ISO FOR THE POOL SUPPLY LINE DOES |
| | NOT REFLECT THE FLOOR PLAN.PLEASE MAKE SURE THE RISER |
| | DIAGRAM REFLECTS THE PIPING ON THE FLOOR PLAN. --RPZV |
| | BACKFLOW SHALL BE LOCATED AS CLOSE TO THE METER AS |
| | POSSIBLE ON PRIVATE PROPERTY. PLEASE CORRELATE. SECTION |
| | 106.1. |
| | |
| | 128. SHT P6.1.2 RISER DOES NOT REFLECT THE FLOOR PLAN |
| | WHERE SOME RISERS OR DROPS CONNECT TO THE MAIN, AT |
| | OFFSETS AND AT THE TOP OF RISER 23.--CHECK VALVES |
| | ARE NOT REQUIRED AT THE BASE OF THE DROPS. (HOW CAN |
| | RISERS BE DRAINED IF REQUIRED FOR SERVICE)?SECTION |
| | 106.1.1. PLEASE MAKE SURE THE RISER DIAGRAM REFLECTS |
| | THE PIPING ON THE FLOOR PLAN. THE MOP SINK& TOILET |
| | ROOM PIPING IS NOT SHOWN. "TH" UNITS DO NOT CONNECT TO |
| | THE MAIN AS SHOWN ON THE FLOOR PLAN. PLEASE CORRELATE. |
| | SECTION 106.1. |
| | |
| | 129. SHT P6.1.5 A SEPARATE GAS PERMIT IS REQUIRED. |
| | SUBMIT THE FOLLOWING INFORMATION: |
| | |
| | A. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2004 |
| | FUEL GAS CODE. - INDICATE ALL CUT SECTIONS DOWNSTREAM |
| | OF THE REGULATOR FOR THE GAS WATER HEATERS. FINAL DROP |
| | LENGTH NOT SHOWN. |
| | |
| | B. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| | NUMBER OF CORRUGATED STAINLESS STEEL |
| | TUBING FOR EACH PIPE SIZE IF BEING USED. - SIZE OF PIPE |
| | SHOWS 1-1/4" REDUCING TO 1" THEN BACK TO 1-1/4". PLEASE |
| | CLARIFY.--ALSO SHOW THE MATERIAL TYPE OF THE |
| | VENTING FROM THE REGULATORS. (MATERIAL SHALL BE NON |
| | COMBUSTABLE). |
| | |
| | C. SHOW THE DISTANCE FROM THE POINT OF |
| | DELIVERY, (METER), TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| | FBC-2004 FUEL GAS CODE APPENDIX A - USE |
| | OF CAPACITY TABLES A.3.1(4). - ALSO SHOW THE TOTAL |
| | DISTANCE FROM THE REGULATOR TO THE MOST REMOTE OUTLET |
| | DOWNSTREAM OF THE REGULATOR FOR THE GAS WATER HEATERS. |
| | |
| | D. SUBMIT CALCULATIONS FOR COMBUSTION |
| | AIR (IF APPLICABLE) PER FBC-2004 FUEL |
| | GAS CODE SECTION 304. |
| | |
| | E. INDICATE THE DELIVERY PRESSURE (PSI) |
| | PER FBC-2004 FUEL GAS CODE SEC. 402.2. |
| | NATURAL GAS SPECIFY .5 PSI OR 2 PSI. - PLEASE SUBMIT AN |
| | APPROVED TABLE FOR 7"W.C. OR INDICATE 1/2PSI DOWNSTREAM |
| | OF THE REGULATOR. FBC-2004 FUEL GAS HAS NO 7" W.C. |
| | TABLES TO VERIFY PIPE SIZES. |
| | |
| | F. SUBMIT A DETAIL SHOWING THE TYPE, |
| | LOCATION, SIZE AND TERMINATION OF THE |
| | GAS VENTS PER FBC-2004 FUEL GAS CODE |
| | SECS. 502 THRU 505. |
| | |
| | G. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2004 FUEL GAS CODE SEC 402.2. |
| | |
| | H. SUBMIT MANUF. SPECIFICATION SHEETS FOR THE GAS |
| | REGULATORS. INDICATE MODEL NUMBER FOR EACH REGULATOR. |
| | --A UNION IS REQUIRED NEXT TO THE REGULATOR NOT AT |
| | THE END OF A RUN. (SEE GAS WATER HEATERS & HVAC SYSTEM |
| | REGULATORS). |
| | |
| | 130. SHT P6.1.4 ISOMETRIC WATER RISER DIAGRAM FOR UNITS |
| | C1, C1A & C1B REQUIRE A WATER HAMMER ARRESTOR FOR THE |
| | DISH WASHER & FOR BOTH THE HOT & COLD AT THE WASH |
| | MACHINE. SECTION 604.9. |
| | |
| | 131. SHT P6.1.4 ISOMETRIC WATER RISER DIAGRAMS FOR |
| | UNITS C2, C2C, C2F & C2D REQUIRE A WATER HAMMER |
| | ARRESTOR FOR THE DISH WASHER. 604.9. |
| | |
| | 132. SHT P6.1.4 ISOMETRIC WATER RISER DIAGRAM FOR UNITS |
| | C3 REQUIRES A WATER HAMMER ARRESTOR FOR THE DISH WASHER |
| | & THE ICE MAKER. 604.9. |
| | |
| | 133. SHT P6.1.4 ISOMETRIC WATER RISER DIAGRAM FOR UNITS |
| | C5A REQUIRES A WATER HAMMER ARRESTOR FOR THE ICE MAKER. |
| | 604.9. |
| | |
| | 134. SHT P6.1.4 ISOMETRIC WATER RISER DIAGRAMS FOR |
| | UNITS TH1, TH1A, TH1B, TH1C, TH1D & TH1E REQUIRE A |
| | WATER HAMMER ARRESTOR FOR THE ICE MAKER PER SECTION |
| | 604.9 AND DO NOT REFLECT THE FLOOR PLAN WHERE THE |
| | JACUZZI CONNECTS TO THE WATER MAIN LINES. PLEASE |
| | CORRELATE. SECTION 106.1.1. |
| | |
| | 135. SHT P6.1.4 ISOMETRIC WATER RISER DIAGRAMS FOR |
| | UNITS TH2, TH2A, TH2B & TH2C REQUIRE THE WATER HAMMER |
| | ARRESTORS TO BE LOCATED AT THE WASH MACHINE. SECTION |
| | 604.9. |
| | |
| | 136. SHT P6.1.4 SUBMIT A FLOOR PLAN FOR THE 3RD FLOOR |
| | RESTROOMS THAT SHOWS THE WATER PIPING IN PLAN VIEW THAT |
| | WILL REFLECT THE RISER DIAGRAM. IDENTIFY THE HOT AND |
| | COLD WATER LINES. SECTION 106.3.5.1.3. |
| | |
| | 137.SHT P5.2.1 ALL OFFSETS AT THE ROOF LEVEL DO NOT |
| | REFLECT THE OFFSETS SHOWN ON THE ROOF PLAN. PLEASE |
| | CORRELATE. SECTION 106.1.1. |
| | |
| | 138. SHT P5.2.1 RISER SDR2 DECK DRAIN, (FD-4), THE TRAP |
| | AND TRAP PRIMER IS NOT REQUIRED ON THE STORM DRAINAGE. |
| | PLEASE DELETE. |
| | |
| | 139. SHT P5.2.1 SDR 5 OFFSETS AT THE ROOF,MINIMUM 5" |
| | PIPE REQUIRED OR MINIMUM SLOPE 2%.PLEASE SHOW ON THE |
| | PLANS. TABLE 1106.3. |
| | |
| | 140. SHT P5.2.1 SDR'S 6, 7, 8, 9, 10, 11, 13 & 14 |
| | OFFSETS AT THE ROOF, MINIMUM 5" PIPE REQUIRED OR |
| | MINIMUM 4% SLOPE. PLEASE SHOW ON THE PLANS. TABLE |
| | 1106.3. |
| | |
| | 141. SHT P5.2.1 SDR 12 OFFSET AT THE ROOF, MINIMUM 5" |
| | PIPE REQUIRED OR MINIMUM 2% SLOPE. PLEASE SHOW ON THE |
| | PLANS. TABLE 1106.3. |
| | |
| | 142. SHT P5.2.1 SDR 15 OFFSET AT THE ROOF, MINIMUM 6" |
| | PIPE REQUIRED OR MINIMUM 4% SLOPE. PLEASE SHOW ON THE |
| | PLANS. TABLE 1106.3. |
| | |
| | 142. SHT P5.2.1 SDR'S 10 & 15 FD-4 IS NOT SHOWN ABOVE |
| | THE THIRD FLOOR BT ON THE 2ND FLOOR ON THE FLOOR PLAN. |
| | THE RISER DIAGRAM DOES NOT REFLECT THE FLOOR PLAN. |
| | PLEASE CORRELATE. SECTION 106.1.1. |
| | |
| | 143. SHT P5.2.1 THE GCO IS SHOWN UPSTREAM OF SDR 13 ON |
| | THE FLOOR PLAN BUT IS SHOWN DOWNSTREAM ON THE RISER |
| | DIAGRAM. PLEASE CORRELATE. SECTION 106.1.1. |
| | |
| | 144. SHT P5.2.2 SHOW ALL PIPE SIZES PER TABLE 1106.3. |
| | |
| | 145. SHT P5.2.2 CLEANOUTS REQUIRED BY SECTION 1101.8 |
| | SHALL BE SHOWN TO REFLECT THE FLOOR PLAN. (SOME ARE |
| | MISSING). PLEASE CORRELATE. SECTION 106.1.1. |
| | |
| | 146. SHT P5.2.2 RECHECK THE ADDITION ON DDR 1 & DDR 7 |
| | AND CORRECT ALL SQUARE FOOTAGE FOR THOSE RISERS AND ALL |
| | PIPING DOWNSTREAM. TABLE 1106.3. |
| | |
| | 147. SHT P5.2.2MINIMUM 5" PIPE REQUIRED FOR DD |
| | 2,500SF ON RISERS DDR-2 & DDR-3. TABLE 1106.3. |
| | |
| | 148. SHT P5.2.2 MINIMUM 5" PIPE REQUIRED FOR 1750SF, |
| | (4" SHOWN), ON RISER DDR-5. TABLE 1106.3. |
| | |
| | 149. SHT P5.2.2 ALL PIPING DOWNSTREAM OF THE LAST CATCH |
| | BASIN SHALL SLOPE IN A UNIFORM SLOPE OF 1/4"/FT. PLEASE |
| | SHOW ON THE PLANS. SECTION 704.1. |
| | |
| | 150. SHT P9.1.1 ROOF TOP EQUIPMENT. CONDENSATION |
| | CONNECTION DETAIL INDICATES A LINE TO DISCHARGE THAT |
| | RUNS BELOW THE ROOF & CONNECTS TO NEAREST CATCH BASIN, |
| | BUT SHT P2.7.2 SHOWS RTU-2 DISCHARGING TO NEAREST ROOF |
| | DRAIN. PLEASE CORRELATE DETAIL AND ROOF PLAN. SECTION |
| | 106.1.1. |
| | |
| | 151. THERE IS A MOP SINK INDICATED IN ROOM 339 THAT HAS |
| | NO WATER PIPING SHOWN. PLEASE CLARIFY. SECTION |
| | 106.1.1. |
| | |
| | 152. ALL LANDSCAPE PLANS THE FIRM LICENSE NUMBER, |
| | (CERTIFICATE OF AUTHORIZATION), IS REQUIRED IN THE |
| | TITLE BLOCK OF ALL SHEETS. THE SEAL FOR EACH SHEET IS |
| | NOT APPROVED AS IT IS REQUIRED TO BE APPROX. 2" IN |
| | DIAMETER. FAC 61G1-16.002, 61G1-16.004(2) & FS |
| | 481.305. |
| | |
| | 153. SHTS IR-1 THRU IR-12 THE FIRM LICENSE NUMBER, |
| | (CERTIFICATE OF AUTHORIZATION), IS REQUIRED IN THE |
| | TITLE BLOCK OF ALL SHEETS. THE SEAL FOR EACH SHEET IS |
| | NOT APPROVED AS IT IS REQUIRED TO BE APPROX. 2" IN |
| | DIAMETER.--SUBMIT ONLY THE IRRIGATION SHEETS FOR |
| | BUILDING 5 IN THE PLANS FOR BUILDING 5.--INDICATE |
| | THE WATER SOURCE FOR THE IRRIGATION AND SHOW RPZV |
| | BACKFLOW LOCATION. SHOW THE CONTROLLER LOCATION AND THE |
| | RAIN SENSOR LOCATION ON THE PLANS. FAC 61G1-16.002, |
| | 61G1-16.004(2) & FS 481.305. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE |
| | THE REVISION & REMOVE & REPLACE ANY |
| | PAGES AS NECESSARY. A TRANSMITTAL LETTER |
| | LISTING THE ORIGINAL REVIEW COMMENT NUMBER, |
| | WITH A DESCRIPTION OF THE REVISION |
| | MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND |
| | WILL HELP TO EXPEDITE YOUR PERMIT. REMOVE ALL VOID |
| | SHEETS FROM ALL PLANS AND PLACE ONE SET OF THEM LOOSELY |
| | ON TOP OF THE COLLATED PLANS TO BE REVIEWED. THANK YOU |
| | FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |