| 2007-09-21 14:37:53 | REVIEW #: 1ST |
| | ACTION: DENIED |
| | |
| | FBC 2004 CODE FAMILY W/ 2005 AND 2006 AMENDMENTS |
| | FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| | |
| | 1. PERMIT APPLICATION INDICATES AN ADDRESS ON HANK |
| | AARON DRIVE, BUT PLANS SHOW AN ADDRESS ON VANDAN DRIVE. |
| | ENERGY CALCULATIONS SHOW AN ADDRESS OF BUILDING 4. |
| | PLEASE SHOW CORRECT ADDRESS ON ALL 3 LOCATIONS. FBC |
| | 106.1.3 |
| | |
| | 2. M0.1: OUTSIDE AIR AND EXHAUST AIR CALCULATIONS, |
| | INCORRECT CODES AND REFERENCE STANDARDS ARE CITED. |
| | REFERENCE THE CORRECT STANDARDS WHICH ARE IN EFFECT AT |
| | TIME OF PERMIT APPLICATION SUCH AS FBC,M 2004 TABLE |
| | 403.3 AND ASHRAE 62.1-2004. SEE FBC,M CH.15. ALSO, THE |
| | VENTILATION SYSTEMS SHALL BE DESIGNED BY EITHER FBC,M |
| | TABLE 403.3 OR ASHRAE 62.1-2004. SELECT AND DECLARE ONE |
| | METHOD OR THE OTHER TO BE USED AS ALLOWED BY FBC,M |
| | 403.4. |
| | |
| | 3. M0.2 PROVISIONS (A): IF THERE ARE CONFLICTS BETWEEN |
| | ANY OF THE LISTED CODES OR STANDARDS AND THE ONES |
| | CURRENTLY ADOPTED BY THE STATE OF FLORIDA, THE |
| | CURRENTLY ADOPTED CODE SHALL PREVAIL. |
| | |
| | 4. M0.2 PROVISIONS (B): DUCT SMOKE DETECTORS SHALL BE |
| | INSTALLED IN THE SUPPLY DUCT OF ANY SYSTEM WITH A |
| | DESIGN CAPACITY EXCEEDING 2000 CFM, NOT JUST THOSE WITH |
| | COMMON PLENUMS. FBC,M 606.2.1 |
| | |
| | 5. M0.2 PROVISIONS (D): ALL THERMOSTATS WITHIN DWELLING |
| | UNITS SHALL BE AT A MAXIMUM HEIGHT OF 48" PROVIDED |
| | THERE IS AN UNOBSTRUCTED FORWARD APPROACH IN ACCORDANCE |
| | WITH FBC CH.11 PART B SECTION 5, REQUIREMENT 5. |
| | |
| | 6. EXTERIOR WALL LOUVERS ARE CLASSIFIED AS PANEL WALLS |
| | PER FAC RULE 9B-72. AS SUCH, THEY ARE SUBJECT TO THE |
| | FLORIDA PRODUCT APPROVAL SYSTEM. PROVIDE PRODUCT |
| | APPROVALS FOR ALL WALL LOUVERS TO BE USED ON THIS |
| | PROJECT. FOR MORE INFORMATION ON THE FLORIDA PRODUCT |
| | APPROVAL SYSTEM PLEASE VISIT: WWW.FLORIDABUILDING.ORG |
| | |
| | 7. M2.1.1 THROUGH M2.2.2: PROVIDE C.O. DETECTION SYSTEM |
| | SUBMITTAL WITH INSTALLATION INSTRUCTIONS TO FACILITATE |
| | A THOROUGH REVIEW OF THE GARAGE VENTILATION SYSTEM. FBC |
| | 106.1.2 AND FBC,M 304.1 |
| | |
| | 8. M2.1.1 THROUGH M2.2.2: SUPPLY FANS COULD NOT BE |
| | LOCATED ANYWHERE IN THE GARAGE OR ON EQUIPMENT |
| | SCHEDULE. SUPPLY FANS ARE INDICATED IN GARAGE |
| | VENTILATION SEQUENCE ON PG M0.1. PLEASE CONFIRM |
| | SEQUENCE NEEDED TO PROVIDE MINIMUM VENTILATION RATES. |
| | SEE FBC,M 403.1 AND SEC.404. |
| | |
| | 9. M2.2.1 AND M2.2.2: IF DRYER EXHAUST RISERS ARE OPEN |
| | AT THE BOTTOM WITH A GRILL, AS INDICATED ON PG M5.1, |
| | THE OPENINGS SHALL BE PROTECTED WITH FIRE AND SMOKE |
| | DAMPERS IN ACCORDANCE WITH FBC,M 607.5.5.1. |
| | |
| | 10. M2.2.1 AND M2.2.2: DRYER EXHAUST RISER DUCTS WHICH |
| | ARE OPEN AT THE BOTTOM ARE FUNCTIONING IN ONE OF THE |
| | TWO FOLLOWING PROHIBITED CONDITIONS: |
| | A) GARAGE EXHAUST; IN THIS CASE FBC,M 504.1 REQUIRES |
| | DRYER EXHAUST SYSTEMS TO BE INDEPENDENT OF ALL OTHER |
| | SYSTEMS. |
| | B) MAKE-UP AIR FOR DRYER FANS; IN THIS CASE FBC,M |
| | 401.5.1 REQUIRES INTAKE OPENINGS AT LEAST 10' FROM |
| | ALLEYS, STREETS OR PARKING LOTS. ALSO, MAKE-UP OR |
| | TRANSFER AIR CAN NOT BE DRAWN FROM DISSIMILAR |
| | OCCUPANCIES PER FBC,M 403.2.1(1). |
| | |
| | 11. M2.2.2: MAINTENANCE OFFICE 219, THERE ARE NO |
| | PROVISIONS FOR AIR CONDITIONING OR VENTILATION OF THI |
| | SPACE SHOWN ON PLANS. PLEASE SHOW HOW VENTILATION IS TO |
| | BE PROVIDED IN ACCORDANCE WITH FBC,M TABLE 403.3 AS |
| | WELL AS THE SIZE OF EF-1 EXHAUST DUCT. ALSO, CONNECTING |
| | OFFICES AND SIMILAR USES THAT ARE ACCESSORY TO THE |
| | GARAGE SHALL BE MAINTAINED AT A POSITIVE PRESSURE PER |
| | FBC,M 404.3. SHOW ENOUGH OUTDOOR AIR TO PROVIDE THE |
| | REQUIRED VENTILATION FOR THE OCCUPANCY, MAKE-UP AIR FOR |
| | THE BATH FAN AND CREATE A POSITIVE PRESSURE IN THE |
| | SPACE. |
| | |
| | 12. M2.3.1 THROUGH M2.6.2: ALL RTU RISER DUCT |
| | PENETRATIONS OF SHAFT ENCLOSURES SHALL BE PROTECTED BY |
| | FIRE AND SMOKE DAMPERS PER FBC,M 607.5.5.1. SHOW HOW |
| | SMOKE DAMPERS ARE TO BE ACTUATED IN ACCORDANCE WITH |
| | FBC,M 607.3.2.1. |
| | |
| | 13. M2.3.1 THROUGH M2.6.2: ALL DUCT PENETRATIONS OF |
| | CORRIDOR WALLS BY RTU DUCTS SHALL BE PROTECTED BY FIRE |
| | AND SMOKE DAMPERS PER FBC,M 607.5 AND 607.5.4. SHOW HOW |
| | SMOKE DAMPERS ARE TO BE ACTUATED IN ACCORDANCE WITH |
| | FBC,M 607.5.4.1. |
| | |
| | 14. M2.3.1 AND ALL FLOORS: RISERS PAU-1 AND PAU-2 AS |
| | SHOWN ON FLOOR PLAN DOES NOT CORRESPOND WITH ANY RISERS |
| | ON THE RISER DETAILS ON PG M5.1. IS THIS SUPPOSED TO BE |
| | RISERS RTU-1 AND RTU-2? PLEASE COORDINATE FLOOR PLANS |
| | AND RISER PLANS. |
| | |
| | 15. M2.3.1 THROUGH M2.6.2: RTU-1 CALLS FOR 8630 CFM ON |
| | FLOOR PLAN. RTU-1 ON EQUIPMENT SCHEDULE (M6.1) CALLS |
| | FOR 8500 CFM. PLEASE SHOW CORRELATION BETWEEN FLOOR |
| | PLAN AND SCHEDULE. FBC 106.1.1. |
| | |
| | 16. M2.3.2: SUPPLY DROPS IN CORRIDOR ARE MISSING SIZE |
| | AND CFM DESIGNATIONS. PLEASE CORRECT AND RESUBMIT. FBC |
| | 106.3.5.1.4.THE CFM TOTALS FOR RTU-2 COULD NOT BE |
| | VERIFIED DUE TO MISSING INFORMATION. PLEASE VERIFY CFM |
| | ON FLOOR PLAN MATCHES THAT ON EQUIPMENT SCHEDULE ONCE |
| | MISSING INFORMATION IS PROVIDED. |
| | |
| | 17. M2.3.2: RESIDENT STORAGE A/C CLOSET (313A), WHAT IS |
| | THE SOURCE OF R/A FOR HP-7? ROOM 313A COULD NOT BE |
| | FOUND ON DOOR SCHEDULE TO CHECK FOR GRILL OR LOUVERED |
| | DOOR. NOTE: 313A IS A PLENUM AND ALL MATERIALS USED |
| | SHALL BE APPROPRIATE FOR THAT APPLICATION. SEE FBC,M |
| | 602.2.1 AND FBC,M 603.8-603.9. DOOR SHALL BE OF |
| | NON-COMBUSTIBLE MATERIALS OR MEET THE 25/50 RATING AS |
| | REQUIRED BY THIS CODE. THIS APPLIES TO ALL DOORS USED |
| | IN PLENUM CLOSETS IN ALL AREAS. |
| | |
| | 18. M2.3.2: RESIDENT STORAGE A/C CLOSET (313A), HP-7 |
| | DOES NOT APPEAR ON EQUIPMENT SCHEDULE. IS THIS SUPPOSED |
| | TO BE AHU-7? PLEASE COORDINATE FLOOR PLANS WITH |
| | SCHEDULES. |
| | |
| | 19. M2.4.2: THE 8X6 O.A. DUCT FOR AHU-7 IS PENETRATING |
| | A 3-HOUR WALL BETWEEN STORAGE AND EXERCISE ROOMS, AS |
| | SHOWN ON A-254. SHOW OPENING PROTECTIVES IN ACCORDANCE |
| | WITH FBC,M 607.5. A MINIMUM 3-HOUR FIRE DAMPER IS |
| | REQUIRED AT THIS LOCATION PER FBC,M TABLE 607.3.1. |
| | |
| | 20. M2.4.2: PG A-105 SHOWS HP-7 IN RESIDENT STORAGE 411 |
| | TO BE IN A CLOSET (411A). THIS DOES NOT MATCH M2.4.2 |
| | FLOOR PLAN, WHICH SHOWS AHU-7 IN A CAGE. COORDINATE |
| | PLANS, SHOWING COMPLIANCE WITH ALL PLENUM, SERVICE |
| | ACCESS AND R/A REQUIREMENTS AS STATED IN COMMENT 17. |
| | NOTE: ROOM 411 IN ITS ENTIRETY WILL BE CONSIDERED A |
| | PLENUM UNLESS THE 8X6 O.A. DUCT TIES INTO A DUCTED |
| | RETURN OR THE CLOSET SHOWN ON A-105 IS USED AS THE |
| | PLENUM. |
| | |
| | 21. M2.4.2: FITNESS ROOM, AHU-9 APPEARS TO BE IN SOME |
| | KIND OF ENCLOSURE WITH NO OPENINGS FOR R/A OR SERVICE. |
| | SHOW SOURCE OF RETURN AIR FOR AHU-9. BALANCED RETURN IS |
| | REQUIRED PER FBC,M 601.4. ALSO, SHOW MEANS OF SERVICE |
| | ACCESS AS REQUIRED BY FBC,M SEC.306. |
| | |
| | 22. M2.4.2: THERE IS NO SOURCE OF CONDENSER WATER SHOWN |
| | FOR AHU-7 OR AHU-9. PLEASE CLARIFY. FBC106.1.1 |
| | |
| | 23. M2.5.2: THE 8X6 O.A. DUCT FOR AHU-7 IS PENETRATING |
| | A 3-HOUR WALL BETWEEN STORAGE (511) AND OFFICE |
| | (RESIDENTS' CONFERENCE CENTER 533) AS SHOWN ON A-255. |
| | SHOW OPENING PROTECTIVES IN ACCORDANCE WITH FBC,M |
| | 607.5. A MINIMUM 3-HOUR FIRE DAMPER IS REQUIRED AT THIS |
| | LOCATION PER FBC,M TABLE 607.3.1. |
| | |
| | 24. M2.5.2: OFFICE, AHU-9 APPEARS TO BE IN SOME KIND OF |
| | ENCLOSURE WITH NO OPENINGS FOR R/A OR SERVICE. SHOW |
| | SOURCE OF RETURN AIR FOR AHU-9. BALANCED RETURN IS |
| | REQUIRED PER FBC,M 601.4. ALSO, SHOW MEANS OF SERVICE |
| | ACCESS AS REQUIRED BY FBC,M SEC.306. |
| | |
| | 25. M2.5.2: THERE IS NO SOURCE OF CONDENSER WATER SHOWN |
| | FOR AHU-9. PLEASE CLARIFY. FBC106.1.1 |
| | |
| | 26. M2.5.2: FOR STORAGE ROOM 511, SEE COMMENT #20 AND |
| | SHOW COMPLIANCE WITH THE SAME. COORDINATE MECHANICAL |
| | FLOOR PLAN WITH PG A-106. |
| | |
| | 27. M2.6.1 AND M2.6.2: PLAN INDICATES IN ONE LOCATION |
| | THAT THESE PAGES ARE TYPICAL FOR FLOORS 5 THRU 7, AND |
| | IN ANOTHER INDICATE FLOORS 6 AND 7. THESE PAGES APPEAR |
| | TO BE FOR FLOORS 6 AND 7 SINCE THERE ARE SEPARATE PAGES |
| | FOR THE 5TH FLOOR WHICH IS NOT TYPICAL. PLEASE CORRECT |
| | PAGE TITLES AND CLARIFY. FBC 106.1.3. |
| | |
| | 28. M2.6.2: FOR STORAGE ROOM 611 AND 711, SEE COMMENT |
| | #20 AND SHOW COMPLIANCE WITH THE SAME. COORDINATE |
| | MECHANICAL FLOOR PLAN WITH PG A-107. |
| | |
| | 29. M2.7.1: CONDENSER WATER LINE SIZES ON ROOF PLAN DO |
| | NOT MATCH THOSE ON RISERS AS SHOWN ON M5.2.1. EXAMPLE: |
| | RISER DIAGRAM SHOWS 3" LINES FEEDINGCWR-1 (2 1/2") |
| | AND CWR-2 (2"), BUT ROOF PLAN SHOWS A 4" LINE FEEDING |
| | BOTH RISERS WITH THE 4" LINES CONTINUING TO CWR-2. |
| | PLEASE COORDINATE DRAWINGS. |
| | |
| | 30. M2.7.2: CONDENSER WATER LINE SIZES ON ROOF PLAN DO |
| | NOT MATCH THOSE ON RISER DIAGRAMS AS SHOWN ON M5.2.1 |
| | AND M2.5.2. EXAMPLE: CWR-10 ON ROOF PLAN SHOWS 2 1/2" |
| | LINES BUT RISER DIAGRAM SHOWS 2" LINES. PLEASE |
| | COORDINATE DRAWINGS. |
| | |
| | 31. M 2.7.2: TX-21 RISER TERMINATES IN OR UNDER THE |
| | ELEVATOR MACHINE ROOM. MECHANICAL EXHAUST SHALL BE |
| | DISCHARGED TO THE OUTDOORS PER FBC,M 501.2. |
| | |
| | 32. M2.7.2: AC BOILER, THIS DOES NOT APPEAR ON ANY |
| | MECHANICAL EQUIPMENT SCHEDULES OR IN PLUMBING PLANS |
| | OTHER THAN THE GAS ISOMENTRIC DIAGRAM. SHOW THE TOTAL |
| | BTU/H OF ALL GAS APPLIANCES IN THE BOILER ROOM (SEE |
| | COMMENT #56 REGARDING SIZE OF BOILER), SIZE AND |
| | LOCATION OF VENTING, AMOUNT OF COMBUSTION AIR REQUIRED, |
| | METHOD USED TO CALCULATE COMBUSTION AIR (FBC,FG 304.6) |
| | AND FREE AREA ASSOCIATED WITH ALL LOUVERS AND GRILLS |
| | USED FOR COMBUSTION AIR (FBC,FG 304.10). |
| | |
| | 33. M2.7.1 AND 2.7.2: VERIFY THAT OARTU'S HAVE |
| | SUFFICIENT CLEARANCE FOR SERVICE AND VENTILATION |
| | RELATED TO POTENTIAL OBSTRUCTIONS SUCH AS MANSARD ROOF |
| | STRUCTURES AND MECHANICAL SCREEN WALLS. FBC,M 306.1 |
| | |
| | 34. M4.1 - 4.3: SOME SUPPLY FLEX DROPS ARE MISSING |
| | INFORMATION SUCH AS DUCT SIZE, CFM AND GRILL SIZE. |
| | PLEASE PROVIDE ALL MISSING INFORMATION ON APARTMENT |
| | FLOOR PLANS. IF A SUPPLY DROP CFM FALLS OUTSIDE THE CFM |
| | RANGE OF THE FLEX DUCT SCHEDULE AS SHOWN ON M6.1, |
| | EITHER REVISE THE SCHEDULE TO SHOW THE SIZE TO BE USED |
| | OR SHOW ALL DUCT SIZES ON FLOOR PLANS. SHOWING ALL FLEX |
| | DUCT SIZES ON FLOOR PLANS WOULD BE BENEFICIAL DURING |
| | THE INSPECTION PROCESS. |
| | |
| | 35. M4.1 - 4.3: SEVERAL BRANCH AND TRANSFER RECTANGULAR |
| | DUCTS ARE MISSING SIZES FOR SUPPLY AND RETURN. PLEASE |
| | PROVIDE ALL MISSING INFORMATION. FBC 106.1.1 AND FBC |
| | 106.3.5.1.4 |
| | |
| | 36. M4.1 - 4.3: SOME R/A TRANSFER DUCTS, ESPECIALLY IN |
| | THE MASTER SUITES ARE NOT DESIGNED TO MEET THE BALANCED |
| | RETURN EXCEPTIONS UNDER FBC,M 601.4. IF TRANSFERS AND |
| | JUMPERS ARE NOT DESIGNED TO MEET THESE EXCEPTIONS, A |
| | FIELD TEST WILL BE REQUIRED AAT FINAL INSPECTION TO |
| | VERIFY PRESSURE DIFFERENTIALS ACROSS CLOSED BEDROOM |
| | DOORS DO NOT EXCEED 0.01" W.C. IN ACCORDANCE WITH THIS |
| | SECTION. |
| | |
| | 37. M4.1: UNIT C3, FLOOR PLAN DOES NOT SHOW OUTDOOR AIR |
| | DUCT PENETRATION FROM CORRIDOR AS SHOWN ON M2.4.2. |
| | PLEASE COORDINATE DRAWINGS. ALSO, SEE COMMENT # 13 |
| | REGARDING DUCT PENETRATIONS OF CORRIDOR WALLS. THIS |
| | APPLIES TO ALL UNIT FLOOR PLANS. |
| | |
| | 38. M4.1, M4.2, M5.1: BATH AND DRYER EXHAUST DUCTS |
| | WHICH ENTER A SHAFT AND UTILIZE A SUBDUCT SYSTEM ARE |
| | EXEMPT FROM FIRE DAMPERS UNDER THE EXCEPTIONS LISTED IN |
| | FBC,M 607.5.5.1. HOWEVER, THEY ARE NOT EXEMPT FROM |
| | SMOKE DAMPERS WHICH ARE REQUIRED BY THIS SECTION. NOTE: |
| | SMOKE DAMPERS SHALL NOT BE INSTALLED IN CLOTHES DRYER |
| | EXHAUST DUCTS PER FBC,M 504.2. ALSO, AN INLINE |
| | BACKDRAFT DAMPER IS ALSO PROHIBITED UNDER THIS SECTION. |
| | SEE ALSO COMMENTS #9 AND #10. |
| | |
| | 39. M4.1, M4.2, M5.1: BATH EXHAUST SUBDUCT SYSTEM |
| | REQUIRES A CONTINUOUS AIRFLOW UPWARD TO THE OUTSIDE IF |
| | THE FIRE DAMPER EXCEPTION IS TO BE CLAIMED UNDER FBC,M |
| | 607.5.5.1 (1.1). THIS WOULD REQUIRE A FAN ON THE ROOF |
| | ABOVE THE SUBDUCT SYSTEM WHICH WOUDL RUN CONTINUOUSLY, |
| | EVEN UNDER EMERGENCY CONDITIONS. |
| | |
| | 40. M4.1 AND M4.2: MECHANICAL FLOOR PLANS SHOW RETURNS |
| | DUCTED TO A/C CLOSETS WHICH ARE BEING USED AS PLENUMS |
| | (SOME WITH SOLID DOORS). FLOOR PLAN ON A-803 (FOR |
| | EXAMPLE) SHOWS A/C CLOSETS WITH 7'8" CEILINGS, WHICH |
| | WOULD NOT ALLOW FOR THE DUCTED RETURN TO GET BACK TO |
| | THE A/C UNIT, AND BIFOLD DOORS. IS THE R/A TO BE DUCTED |
| | TO THE CLOSET OR THROUGH BIFOLD LOVER DOORS? MECHANICAL |
| | AND ARCHITECTURAL PLANS ARE IN CONFLICT. PLEASE |
| | CLARIFY. NOTE: SEE COMMENT #17 REGARDING A/C CLOSET |
| | DOORS. |
| | |
| | 41. M4.2 AND M4.3: TH1, 2 AND 3 ALL SHOW DRYER EXHAUST |
| | DUCTS TO BE 5 INCH ROUND. THIS WOULD NOT CONFORM TO |
| | MOST DRYER MANUFACTURER'S INSTALLATION INSTRUCTIONS. |
| | THIS CAN NOT BE VERIFIED AS INSTALLATION INSTRUCTIONS |
| | WERE NOT PROVIDED. CLOTHES DRYERS SHALL BE EXHAUSTED IN |
| | ACCORDANCE WITH THE MANUFACTURER?S INSTRUCTIONS IN |
| | ACCORDANCE WITH FBC,M 504.1. PROVIDE DRYER |
| | MANUFACTURER'S INSRUCTIONS TO DEMONSTRATE THAT THE |
| | EXHAUST AS SHOWN ON PLANS IS IN COMPLIANCE. |
| | |
| | 42. M4.2: TH3, PLAN SHOWS 12X8 DUCT DOWN FROM 2ND FLOOR |
| | TO KITCHEN. THE RISER DUCT IS SHOWN IN THE EXACT SAME |
| | LOCATION AS A CONCRETE COLUMN. SEE PG A-808. THERE IS A |
| | CHASE WITHIN THE UNIT DESIGNED FOR THIS RISER DUCT |
| | MAKING THE 2-HOUR RATED ENCLOSURE IN THE PARKING GARAGE |
| | UNNECESSARY, ASIDE FROM THE FACT THAT IT IS IN CONFLICT |
| | WITH A STRUCTURAL COLUMN. PLEASE COORDINATE MECHANICAL |
| | PLANS WITH ARCHITECTURAL PLANS. |
| | |
| | 43. M4.3: TH1, MECHANICAL FLOOR PLAN SHOWS A/C DUCT |
| | DESIGNED TO THE LAUNDRY ROOM INSTEAD OF THE A/C CLOSET. |
| | SEE PG A-801 FOR APARTMENT LAYOUT. COORDINATE |
| | MECHANICAL AND ARCHITECTURAL FLOOR PLANS. THE DUCT |
| | SYSTEM CANNOT BE REVIEWED FOR CODE COMPLIANCE AT THIS |
| | TIME UNTIL THE DUCT SYSTEM MATCHES FLOOR PLANS. ALSO, |
| | IF A/C UNIT IS TO BE LOCATED IN KITCHEN, PLEASE SEE |
| | FBC,M 407.1 REGARDING RETURN AIR INTAKE LOCATIONS. |
| | |
| | 44. M4.3: TH2, THERE IS NO SUPPLY DUCT GOING TO A/C |
| | CLOSET. SUPPLY DUCT ONLY GOES FROM 2ND FLOOR DOWN TO |
| | 1ST FLOOR, WITH NO SOURCE OF SUPPLY AIR. PLEASE |
| | CLARIFY. |
| | |
| | 45. M4.1 THROUGH M4.3: NO INFORMATION COULD BE FOUND ON |
| | PLANS REGARDING VENTILATION FOR UNITS. SHOW COMPLIANCE |
| | WITH FBC,M SEC.402 OR TABLE 403.3. ALSO, SHOW HOW UNITS |
| | ARE TO BE PRESSURIZED WITH RESPECT TO THE OUTDOORS IN |
| | ACCORDANCE WITH FBC 13-409.1.ABC.2. |
| | |
| | 46. M4.4: IF LOWER AND UPPER LOBBY AREAS ARE DEEMED TO |
| | BE AN ATRIUM RATHER THAN A MEZZANINE DURING BUILDING |
| | PLAN REVIEW, SMOKE CONTROL SHALL BE REQUIRED PER FBC |
| | SEC. 404. |
| | |
| | 47. M4.4: MECHANICAL FLOOR PLAN ON 2ND FLOOR SHOWS THE |
| | SUPPLY RISER GOING DOWN THROUGH THE CORNER OF A |
| | CONCRETE BLOCK WALL TO THE FIRST FLOOR. THE FLOOR PLAN |
| | OR A-301 SHOWS A CHASE IN THE A/C CLOSET (PROBABLY FOR |
| | A/C DUCT) AND THE DOOR TO THE A/C CLOSET IS SHOWN WHERE |
| | THE RETURN WALL GRILL IS LOCATED. PLEASE COORDINATE |
| | PLANS. ALSO, LIFE SAFETY PLAN A-252 SHOWS THE |
| | MECHANICAL ROOM WALL AS 2-HOUR RATED. SHOW OPENING |
| | PROTECTIVES AT ALL DUCT PENETRATIONS OF RATED |
| | ASSEMBLIES (VERTICAL AND HORIZONTAL) IN ACCORDANCE WITH |
| | FBC,M 607.5. |
| | |
| | 48. M4.4: WHAT IS THE PURPOSE OF THE ACCESS PANELS IN |
| | THE 2-HOUR RATED ENCLOSURES? IF THIS IS THE LOCATION OF |
| | SUPPLY FANS, PLEASE SHOW THE FANS ON THE PLANS. FBC |
| | 106.1.1 AND FBC 106.3.5.1.4. NOTE: 60X30 SAR'S WOULD |
| | INDICATE THAT THESE ARE SUPPLY DUCTS. |
| | |
| | 49. M4.4: M4.4: EF-1 IN TOILET ROOM 124 SHALL BE |
| | INTERLOCKED TO RUN WITH AHU-6 TO ENSURE ALL AIR |
| | SUPPLIED TO THAT SPACE IS EXHAUSTED IN ACCORDANCE WITH |
| | FBC,M 403.2.1(3). PROVISIONS SHALL ALSO BE MADE TO |
| | ASSURE THAT BOTH THE AHU AND THE EF ARE RUNNING |
| | WHENEVER THE SPACE IS OCCUPIED IN ACCORDANCE WITH FBC,M |
| | 401.3 (UNLESS BOTH ARE SET TO RUN CONTINUOUS). |
| | |
| | 50. M5.1: PLAN SHOWS ROOF CURBS FOR RTU 1 AND 2 USED |
| | FOR SUPPLY DUCT. IF SO, CURBS SHALL BE LINED WITH MIN. |
| | R-8, UL-181 APPROVED DUCT MATERIAL IN ACCORDANCE WITH |
| | FBC TABLE 13-410.1.ABC.2.2 AND FBC,M 604.13. IF THIS IS |
| | A LISTED SYSTEM, PROVIDE SUBMITTAL. |
| | |
| | 51. M5.1: M5.1: ALL DUCT PENETRATIONS OF SHAFT FOR RTU |
| | 1 AND 2 SHALL BE PROTECTED BY FIRE AND SMOKE DAMPERS |
| | PER FBC,M 607.5.5.1. SEE COMMENT #13. |
| | |
| | 52. M5.1: TOILET EXHAUST RISER PENETRATIONS REQUIRE |
| | SMOKE DAMPERS AND ROOFTOP EXHAUST FANS TO RUN |
| | CONTINUOUS UNDER ALL CONDITIONS PER FBC,M 607.5.5.1. |
| | SEE COMMENT #38 AMD #39. |
| | |
| | 53. M5.1: DRYER EXHAUST RISERS ARE NOT EXEMPT FROM |
| | SMOKE DAMPER REQUIREMENTS. SEE COMMENT #9 AND #38. |
| | |
| | 54. M5.2.1: COORDINATE PIPE SIZES WITH THOSE SHOWN ON |
| | ROOF PLAN (M2.7.1, M2.7.2) AND WATER FLOW DIAGRAM |
| | (M5.3). ALSO, SHOW ALL PIPE SIZES, INCLUDING BRANCHES |
| | FOR AHU'S 2,5,6,14. |
| | |
| | 55. M5.2.2: COORDINATE PIPE SIZES WITH THOSE SHOWN ON |
| | ROOF PLAN (M2.7.1, M2.7.2) AND WATER FLOW DIAGRAM |
| | (M5.3). ALSO, SHOW ALL PIPE SIZES, INCLUDING BRANCHES |
| | FOR AHU'S 10,11,12. |
| | |
| | 56. M5.3: DIAGRAM ON THIS PAGE SHOWS AC BOILER TO BE |
| | 600,000 BTU/H BUT PLUMBING PLAN SHOWS THE BOILER AT |
| | 200,000 BTU/H. PLEASE CLARIFY. PROVIDE SUBMITTAL FOR |
| | THE BOILER AND ALL EQUIPMENT SHOWN ON THIS PAGE. FBC |
| | 106.1.2. |
| | |
| | 57. M5.3: COORDINATE PIPE SIZES WITH THOSE SHOWN ON |
| | ROOF PLAN (M2.7.1, M2.7.2) AND RISER DIAGRAMS (M5.2.1, |
| | M5.2.2). |
| | |
| | 58. M5.3: TOWER NOTES, NOTE #2, PROVIDE DETAIL AND WIND |
| | LOAD CALCULATIONS FOR THIS INSTALLATION. FBC,M 301.13, |
| | FBC, CH.16 AND FCB 106.1.2. |
| | |
| | 59. M6.1: EF-3, 4 POOL TOILET AND POOL EQUIPMENT ROOMS |
| | COULD NOT BE LOCATED ON MECHANICAL PLANS. PROVIDE |
| | MISSING INFORMATION. FBC 106.1.1 |
| | |
| | 60. M6.1: SHOW LOCATION OF EF-7 AND FIRE PUMP ROOM ON |
| | PLANS. ELECTRICAL PLAN INDICATES FIRE PUMPS ARE DIESEL |
| | OPERATED. PROVIDE INFORMATION ON FUEL STORAGE MEANS, |
| | LOCATION AND QUANTITIES AS WELL AS LOCATION AND DETAILS |
| | OF ALL FUEL DELIVERY AND REFUELING LINES. PROVIDE |
| | SUBMITTALS FOR ALL LISTED EQUIPMENT USED FOR FUEL |
| | STORAGE AND DELIVERY. STATIONARY COMBUSTION ENGINES |
| | SHALL COMPLY WITH NFPA 37-02 AND FUEL STORAGE SHALL |
| | COMPLY WITH NFPA 30-00. |
| | |
| | 61. M6.1: HEAT PUMP SCHEDULE, NOTE INDICATES HONEYWELL |
| | "T-87" THERMOSTAT. THIS TYPE OF THERMOSTAT IS NOT |
| | PROGRAMMABLE AS CALLED FOR ON PG M0.2 AUTOMATIC |
| | TEMPERATURE CONTROLS NOTE (A). THERMOSTATS SHALL COMPLY |
| | WITH FBC 13-407.1.ABC.2.4.1. |
| | |
| | 62. M6.1: PROVIDE SUBMITTALS FOR ALL LISTED MECHANICAL |
| | EQUIPMENT TO BE USED ON THIS PROJECT. FBC 106.1.3 |
| | |
| | 63. M6.1: WATER SOURCE HEAT PUMPS SHALL HAVE |
| | TWO-POSITION AUTOMATIC VALVES INTERLOCKED TO SHUT OFF |
| | WATER FLOW WHEN THE COMPRESSOR IS OFF IN ACCORDANCE |
| | WITH FBC 13-411.1.ABC.1.4. |
| | |
| | 64. M7.1: ROOFTOP CLEARANCE SCHEDULE, THE INCORRECT |
| | CODE YEAR AND CODE SECTION ARE REFERENCED. THE CORRECT |
| | YEAR/SECTION ARE AS FOLLOWS: FBC 2004 TABLE 1509.7. |
| | |
| | 65. M7.1: INSULATED DUCT THRU ROOF DETAIL, THIS DETAIL |
| | DOES NOT MAKE SENSE AS THE NOTES POINT TO STRUCTURAL |
| | STEEL COMPONENTS WHERE NONE EXIST. THE DETAIL ALSO |
| | INDICATES PENETRATION OF AN EXISTING ROOF DECK. THIS IS |
| | NEW CONSTRUCTION. NOTHING IS EXISTING. ALSO, IF |
| | FLASHING AND DUCT ARE TO BE WELDED, PLEASE PROVIDE |
| | ADDDITIONAL INFO, SUCH AS METHOD OF WELDING AND |
| | REQUIRED THICKNESS OF SHEET METAL FOR EACH. |
| | |
| | 66. M7.1: CLOSED CIRCUIT COOLER DETAIL, WHERE VIBRATION |
| | ISOLATION IS EMPLOYED, AN APPROVED MEANS OF |
| | SUPPLEMENTAL RESTRAINT SHALL BE USED TO ACCOMPLISH |
| | SUPPORT AND RESTRAINT IN ACCORDANCE WITH FBC,M 301.10. |
| | ALSO, SHOW COMPLIANCE WITH FBC,M 301.13 FOR WIND |
| | RESISTANCE. |
| | |
| | 67. M7.1: HEAT PUMP DETAIL, THERE IS ANOTHER DETAIL FOR |
| | THIS SAME INSTALLATION ON M7.3, BUT THE DETAILS DO NOT |
| | MATCH. PLEASE CHOOSE ONE METHOD AND REMOVE THE OTHER |
| | FROM PLANS TO AVOID CONFLICT. FBC 106.1.1. |
| | |
| | 68. M7.2: DUCT SUPPORT DETAIL, THERE IS ANOTHER DETAIL |
| | FOR THIS SAME INSTALLATION ON M7.3, BUT THE DETAILS DO |
| | NOT MATCH. PLEASE CHOOSE ONE METHOD AND REMOVE THE |
| | OTHER FROM PLANS TO AVOID CONFLICT. FBC 106.1.1. NOTE: |
| | COMPLIANCE WITH FBC,M 301.13 AND FBC TABLE 1509.7 IS |
| | REQUIRED. |
| | |
| | 69. M7.3: SHOW HOW AIR SEPARATOR AND EXPANSION TANK ARE |
| | TO BE SECURED TO STRUCTURE IN A MANNER THAT MEETS WIND |
| | LOAD REQUIREMENTS OF FBC,M 301.13 AND FBC CH.16. |
| | |
| | 70. M7.2 AND 7.3: FIRE DAMPERS, SMOKE DAMPERS AND |
| | COMBINATION FIRE/SMOKE DAMPERS SHALL BE INSTALLED IN |
| | ACCORDANCE WITH THEIR LISTING AND MANUFACTURER'S |
| | INSTALLATION INSTRUCTIONS PER FBC,M 607.2. WHERE |
| | CONFLICTS BETWEEN DETAIL ON PLANS AND MANUFACTURER'S |
| | INSTRUCTIONS OCCUR, THE MANUFACTURER'S INSTRUCTIONS |
| | SHALL GOVERN. |
| | |
| | 71. M7.3:THERE ARE TWO DETAILS FOR VERTICAL PIPE FLOOR |
| | PENETRATIONS ON THIS PAGE. WHICH IS TO BE USED? PROVIDE |
| | MANUFACTURER AND LISTING FOR ALL THROUGH-PENETRATION |
| | FIRESTOP SYSTEMS TO BE USED AT RATED ASSEMBLIES. FBC |
| | SEC.712 |
| | |
| | 72. M7.3: ROOF MOUNTED EF DETAIL HAS A NOTE FOR |
| | STRUCTURAL ENGINEER TO DETERMINE AND VERIFY ATTACHMENT |
| | DETAILS FOR REQUIRED WIND LOADS. NO SUCH INFORMATION |
| | COULD BE FOUND IN STRUCTURAL PLANS. FBC 301.13 |
| | |
| | 73. M7.4: GARAGE EF 14-16 MOUNTING DETAIL DOES NOT SHOW |
| | HOW FANS, SLEEVES OR SOUND ATTENUATION BOXES ARE TO BE |
| | SECURED TO STRUCTURE. PROVIDE SUFFICIENT DETAIL AND |
| | EQUIPMENT SUBMITTALS. FBC 106.1.2 |
| | |
| | 74. M7.4: GARAGE EF 8-13, SHOW HOW FANS ARE TO BE |
| | SECURED TO STRUCTURE TO MEET WIND LOAD REQUIREMENTS PER |
| | FBC,M 301.13 AND CLEARANCE REQUIREMENTS OF FBC TABLE |
| | 1509.7. ALSO PROVIDE SUBMITTAL FOR FLEXIBLE DUCT |
| | CONNECTIONS, SHOWING SUITABLILITY FOR OUTDOOR USE. |
| | |
| | 75. GARAGE EF 17-18, SHOW HOW FANS ARE TO BE SECURED TO |
| | STRUCTURE TO MEET WIND LOAD REQUIREMENTS PER FBC,M |
| | 301.13. PROVIDE SUBMITTAL SHOWING PENTHOUSE TYPE FAN |
| | HOUSING SUITABLE FOR USE IN 140 MPH WIND ZONE. FBC |
| | CH.16 |
| | |
| | 76. M7.4: VERTICAL HP DETAIL, SHOW MEANS OF AUXILIARY |
| | DRAIN PROTECTION PER FBC,M 307.2.3. |
| | |
| | 77. M7.4: TOILET AND DRYER EXHAUST DETAILS, VERIFY |
| | SIZES OF WALL CAPS CORRESPOND WITH THOSE SHOWN ON FLOOR |
| | PLANS. BE SURE TO VERIFY DRYER EXHAUST SIZES ARE IN |
| | COMPLIANCE WITH DRYER MANUFACTURER'S INSTALLATION |
| | INSTRUCTIONS. SEE COMMENT #41. |
| | |
| | 78. M7.4: DUCT SMOKE DETECTORS SHALL BE CONNECTED TO |
| | THE BUILDING FIRE ALARM SYSTEM PER FBC,M 606.4.1. |
| | |
| | ENERGY CALCULATIONS: |
| | |
| | 79. OUTDOOR AIR QUANTITIES SHOWN ON SIZING SUMMARY DO |
| | NOT MATCH THOSE GIVEN ON PG M0.1. THESE VALUES SHOULD |
| | CORRESPOND. EXAMPLE: EXERCISE ROOM ON SCHEDULE CALLS |
| | FOR 150 CFM O.A. WHILE THE SUMMARY SHOWS 120 CFM O.A. |
| | PLEASE SHOW CORRELATION BETWEEN DESIGN ON PLANS AND |
| | CALCULATIONS USED FOR SIZING OF EQUIPMENT. |
| | |
| | 80. COIL SIZING/ COOLING CAPACITY SHOWN ON SIZING |
| | SUMMARY DO NOT MATCH THOSE GIVEN ON PG M6.1. EXAMPLE 1: |
| | APT C2 ON SCHEDULE SHOWS 23.83 MBH AND APT C2 ON |
| | SUMMARY SHOWS 28.8 MBH.THIS UNIT LOOKS TO BE |
| | SIGNIFICANTLY UNDERSIZED BASED ON THE SIZING |
| | SUMMARY/COOLING LOADS. PLEASE CLARIFY. |
| | EXAMPLE 2: SUMMARY FOR AHU-OFFICES CALLS FOR SENSIBLE |
| | COIL LOAD OF 11.3 MBH WHILE ON SCHEDULE AHU-4 SHOWS |
| | 16.87 MBH. HVAC SYSTEMS AND EQUIPMENT SHALL BE SIZED TO |
| | PROVIDE NO MORE THAN THE SPACE AND SYSTEM LOADS |
| | CALCULATED IN ACCORDANCE WITH FBC 13-407.1.ABC.1. |
| | PLEASE SHOW EQUIPMENT TO BE SIZED ACCORDINGLY. |
| | |
| | 81. SYSTEM REPORT COMPLIANCE: SYSTEM SIZES AS SHOWN ON |
| | REPORT DO NOT CORRESPOND WITH SYSTEMS IN THE SYSTEM |
| | SIZING SUMMARY. GROUPING OF SYSTEMS WILL INCREASE THE |
| | SIZE OF THE SYSTEM IN THE REPORT WILL DISTORT THE |
| | ALLOWED EFFICIENCY CRITERIA WHICH WOULD PROVIDE UNDUE |
| | TRADE-OFF CREDIT FOR EFFICIENCY OF THE COOLING SYSTEMS. |
| | EXAMPLE: SYSTEM 1 IS LISTED FOR ALL TOWNHOMES AS ONE |
| | "WATER COOLED >240,000 BTU/H" UNIT. THE TOWNHOMES ARE |
| | EACH COOLED BY INDIVIDUAL UNITS AND WOULD BE |
| | CATEGORIZED AS "WATER COOLED 17,000 TO <135,000 BTU/H" |
| | IN ACCORDANCE WITH FBC TABLE 13-407.1.ABC.3.2B. THIS |
| | TABLE GIVES A MINIMUM EFFICIENCY CRITERIA OF 12.00 EER. |
| | "SYSTEMS" SHOULD CORRESPOND WITH "ZONES" IN THE INPUT |
| | DATA REPORT. FOR GUIDANCE AS TO WHAT ACTUALLY |
| | CONSTITUTES A ZONE, PLEASE SEE FBC 13-407.1.ABC.2.2.1. |
| | |
| | 82. INPUT DATA REPORT: BUILDING ENVELOPE COMPONENTS AS |
| | SHOWN ON THE INPUT DATE REPORT DO NOT CORRESPOND WITH |
| | THE TYPE OF CONSTRUCTION SHOWN ON PLANS. EXAMPLE: |
| | REPORT SHOWS THE ROOF TO BE INSULATED WITH R-19 BATTS. |
| | DETAILS ON A-652 INDICATE THE ROOF INSULATED WITH RIGID |
| | BOARD TO A VALUE OF R-14 IN A BUILT-UP ROOF SYSTEM. |
| | ALSO, NO INFORMATION COULD BE FOUND REGARDING TYPE OR |
| | R-VALUE OF INSULATION TO BE USED IN THE MANSARD ROOF |
| | SECTIONS WHICH ARE ABOVE CONDITIONED SPACES. NO |
| | INFORMATION COULD BE FOUND IN ARCHITECTURAL PLANS OR |
| | DETAILS SHOWING 1.36" INSULATION AT EXTERIOR WALLS AS |
| | INDICATED ON THE REPORT. PLEASE CLARIFY ON PLANS AND |
| | PROVIDE CORRESPONDING INFORMATION ON CALCULATIONS. |
| | |
| | 83. WHAT IS THE R-VALUE OF THE 3RD FLOOR FLOOR/CEILING |
| | ASSEMBLY BETWEEN THE PARKING GARAGE AND THE 3RD FLOOR |
| | APARTMENTS? THIS INFORMATION IS NOT SHOWN ON PLANS OR |
| | IN THE REPORT. ALSO, PLEASE EXPLAIN HOW AN 8" |
| | LIGHTWEIGHT CONCRETE BLOCK WITH 1.36" INSULATION SYSTEM |
| | IS TO BE USED FOR THE FLOOR IN THE LOBBY AS INDICATED |
| | IN THE REPORT. |
| | |
| | 84. ENERGY CALCULATIONS SHOW A "PLANT" CHILLER AT 390 |
| | TONS. THERE IS NO CHILLER SHOWN AS PART OF THIS SYSTEM. |
| | ALSO, THE CLOSED CIRCUIT COOLERS AND A/C BOILER WERE |
| | OMITTED FROM THE CALCULATIONS. PLEASE CORRECT AND |
| | RESUBMIT. |
| | |
| | 85. STAIR AND ELEVATOR SHAFT VENTS SHALL BE EQUIPPED |
| | WITH MOTORIZED DAMPERS THAT ARE CAPABLE OF BEING |
| | AUTOMATICALLY CLOSED DURING NORMAL BUILDING OPERATION |
| | AND ARE INTERLOCKED TO OPEN AS REQUIRED BY FIRE AND |
| | SMOKE DETECTION SYSTEMS. FBC 13-409.1.ABC.3.1 |
| | |
| | 86. MECHANICAL SYSTEMS SHALL BE DESIGNED TO ASSURE THAT |
| | BUILDINGS ARE PRESSURIZED WITH RESPECT TO OUTDOORS. |
| | PROVIDE AIR BALANCE SCHEDULE(S) SHOWING COMPLIANCE FOR |
| | ALL ZONES/FLOORS. FBC 13-409.1.ABC.2 |
| | |
| | 87. SHOW SHUTOFF DAMPER CONTROLS FOR O.A. SUPPLY AND |
| | EXHAUST SYSTEMS AS REQUIRED BY FBC 13-409.1.ABC.3.3. |
| | |
| | 88. DEMONSTRATE COMPLIANCE WITH FBC 13-406.1.ABC.1.1 |
| | FOR AIR INFILTRATION AT EXTERIOR DOORS AND WINDOWS. |
| | |
| | IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |
| | RONALD J. REGUEIRO |
| | 561.805.6719 |