2007-09-21 14:37:53REVIEW #: 1ST
 ACTION: DENIED
  
 FBC 2004 CODE FAMILY W/ 2005 AND 2006 AMENDMENTS
 FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH
  
 1. PERMIT APPLICATION INDICATES AN ADDRESS ON HANK
 AARON DRIVE, BUT PLANS SHOW AN ADDRESS ON VANDAN DRIVE.
 ENERGY CALCULATIONS SHOW AN ADDRESS OF BUILDING 4.
 PLEASE SHOW CORRECT ADDRESS ON ALL 3 LOCATIONS. FBC
 106.1.3
  
 2. M0.1: OUTSIDE AIR AND EXHAUST AIR CALCULATIONS,
 INCORRECT CODES AND REFERENCE STANDARDS ARE CITED.
 REFERENCE THE CORRECT STANDARDS WHICH ARE IN EFFECT AT
 TIME OF PERMIT APPLICATION SUCH AS FBC,M 2004 TABLE
 403.3 AND ASHRAE 62.1-2004. SEE FBC,M CH.15. ALSO, THE
 VENTILATION SYSTEMS SHALL BE DESIGNED BY EITHER FBC,M
 TABLE 403.3 OR ASHRAE 62.1-2004. SELECT AND DECLARE ONE
 METHOD OR THE OTHER TO BE USED AS ALLOWED BY FBC,M
 403.4.
  
 3. M0.2 PROVISIONS (A): IF THERE ARE CONFLICTS BETWEEN
 ANY OF THE LISTED CODES OR STANDARDS AND THE ONES
 CURRENTLY ADOPTED BY THE STATE OF FLORIDA, THE
 CURRENTLY ADOPTED CODE SHALL PREVAIL.
  
 4. M0.2 PROVISIONS (B): DUCT SMOKE DETECTORS SHALL BE
 INSTALLED IN THE SUPPLY DUCT OF ANY SYSTEM WITH A
 DESIGN CAPACITY EXCEEDING 2000 CFM, NOT JUST THOSE WITH
 COMMON PLENUMS. FBC,M 606.2.1
  
 5. M0.2 PROVISIONS (D): ALL THERMOSTATS WITHIN DWELLING
 UNITS SHALL BE AT A MAXIMUM HEIGHT OF 48" PROVIDED
 THERE IS AN UNOBSTRUCTED FORWARD APPROACH IN ACCORDANCE
 WITH FBC CH.11 PART B SECTION 5, REQUIREMENT 5.
  
 6. EXTERIOR WALL LOUVERS ARE CLASSIFIED AS PANEL WALLS
 PER FAC RULE 9B-72. AS SUCH, THEY ARE SUBJECT TO THE
 FLORIDA PRODUCT APPROVAL SYSTEM. PROVIDE PRODUCT
 APPROVALS FOR ALL WALL LOUVERS TO BE USED ON THIS
 PROJECT. FOR MORE INFORMATION ON THE FLORIDA PRODUCT
 APPROVAL SYSTEM PLEASE VISIT: WWW.FLORIDABUILDING.ORG
  
 7. M2.1.1 THROUGH M2.2.2: PROVIDE C.O. DETECTION SYSTEM
 SUBMITTAL WITH INSTALLATION INSTRUCTIONS TO FACILITATE
 A THOROUGH REVIEW OF THE GARAGE VENTILATION SYSTEM. FBC
 106.1.2 AND FBC,M 304.1
  
 8. M2.1.1 THROUGH M2.2.2: SUPPLY FANS COULD NOT BE
 LOCATED ANYWHERE IN THE GARAGE OR ON EQUIPMENT
 SCHEDULE. SUPPLY FANS ARE INDICATED IN GARAGE
 VENTILATION SEQUENCE ON PG M0.1. PLEASE CONFIRM
 SEQUENCE NEEDED TO PROVIDE MINIMUM VENTILATION RATES.
 SEE FBC,M 403.1 AND SEC.404.
  
 9. M2.2.1 AND M2.2.2: IF DRYER EXHAUST RISERS ARE OPEN
 AT THE BOTTOM WITH A GRILL, AS INDICATED ON PG M5.1,
 THE OPENINGS SHALL BE PROTECTED WITH FIRE AND SMOKE
 DAMPERS IN ACCORDANCE WITH FBC,M 607.5.5.1.
  
 10. M2.2.1 AND M2.2.2: DRYER EXHAUST RISER DUCTS WHICH
 ARE OPEN AT THE BOTTOM ARE FUNCTIONING IN ONE OF THE
 TWO FOLLOWING PROHIBITED CONDITIONS:
 A) GARAGE EXHAUST; IN THIS CASE FBC,M 504.1 REQUIRES
 DRYER EXHAUST SYSTEMS TO BE INDEPENDENT OF ALL OTHER
 SYSTEMS.
 B) MAKE-UP AIR FOR DRYER FANS; IN THIS CASE FBC,M
 401.5.1 REQUIRES INTAKE OPENINGS AT LEAST 10' FROM
 ALLEYS, STREETS OR PARKING LOTS. ALSO, MAKE-UP OR
 TRANSFER AIR CAN NOT BE DRAWN FROM DISSIMILAR
 OCCUPANCIES PER FBC,M 403.2.1(1).
  
 11. M2.2.2: MAINTENANCE OFFICE 219, THERE ARE NO
 PROVISIONS FOR AIR CONDITIONING OR VENTILATION OF THI
 SPACE SHOWN ON PLANS. PLEASE SHOW HOW VENTILATION IS TO
 BE PROVIDED IN ACCORDANCE WITH FBC,M TABLE 403.3 AS
 WELL AS THE SIZE OF EF-1 EXHAUST DUCT. ALSO, CONNECTING
 OFFICES AND SIMILAR USES THAT ARE ACCESSORY TO THE
 GARAGE SHALL BE MAINTAINED AT A POSITIVE PRESSURE PER
 FBC,M 404.3. SHOW ENOUGH OUTDOOR AIR TO PROVIDE THE
 REQUIRED VENTILATION FOR THE OCCUPANCY, MAKE-UP AIR FOR
 THE BATH FAN AND CREATE A POSITIVE PRESSURE IN THE
 SPACE.
  
 12. M2.3.1 THROUGH M2.6.2: ALL RTU RISER DUCT
 PENETRATIONS OF SHAFT ENCLOSURES SHALL BE PROTECTED BY
 FIRE AND SMOKE DAMPERS PER FBC,M 607.5.5.1. SHOW HOW
 SMOKE DAMPERS ARE TO BE ACTUATED IN ACCORDANCE WITH
 FBC,M 607.3.2.1.
  
 13. M2.3.1 THROUGH M2.6.2: ALL DUCT PENETRATIONS OF
 CORRIDOR WALLS BY RTU DUCTS SHALL BE PROTECTED BY FIRE
 AND SMOKE DAMPERS PER FBC,M 607.5 AND 607.5.4. SHOW HOW
 SMOKE DAMPERS ARE TO BE ACTUATED IN ACCORDANCE WITH
 FBC,M 607.5.4.1.
  
 14. M2.3.1 AND ALL FLOORS: RISERS PAU-1 AND PAU-2 AS
 SHOWN ON FLOOR PLAN DOES NOT CORRESPOND WITH ANY RISERS
 ON THE RISER DETAILS ON PG M5.1. IS THIS SUPPOSED TO BE
 RISERS RTU-1 AND RTU-2? PLEASE COORDINATE FLOOR PLANS
 AND RISER PLANS.
  
 15. M2.3.1 THROUGH M2.6.2: RTU-1 CALLS FOR 8630 CFM ON
 FLOOR PLAN. RTU-1 ON EQUIPMENT SCHEDULE (M6.1) CALLS
 FOR 8500 CFM. PLEASE SHOW CORRELATION BETWEEN FLOOR
 PLAN AND SCHEDULE. FBC 106.1.1.
  
 16. M2.3.2: SUPPLY DROPS IN CORRIDOR ARE MISSING SIZE
 AND CFM DESIGNATIONS. PLEASE CORRECT AND RESUBMIT. FBC
 106.3.5.1.4.THE CFM TOTALS FOR RTU-2 COULD NOT BE
 VERIFIED DUE TO MISSING INFORMATION. PLEASE VERIFY CFM
 ON FLOOR PLAN MATCHES THAT ON EQUIPMENT SCHEDULE ONCE
 MISSING INFORMATION IS PROVIDED.
  
 17. M2.3.2: RESIDENT STORAGE A/C CLOSET (313A), WHAT IS
 THE SOURCE OF R/A FOR HP-7? ROOM 313A COULD NOT BE
 FOUND ON DOOR SCHEDULE TO CHECK FOR GRILL OR LOUVERED
 DOOR. NOTE: 313A IS A PLENUM AND ALL MATERIALS USED
 SHALL BE APPROPRIATE FOR THAT APPLICATION. SEE FBC,M
 602.2.1 AND FBC,M 603.8-603.9. DOOR SHALL BE OF
 NON-COMBUSTIBLE MATERIALS OR MEET THE 25/50 RATING AS
 REQUIRED BY THIS CODE. THIS APPLIES TO ALL DOORS USED
 IN PLENUM CLOSETS IN ALL AREAS.
  
 18. M2.3.2: RESIDENT STORAGE A/C CLOSET (313A), HP-7
 DOES NOT APPEAR ON EQUIPMENT SCHEDULE. IS THIS SUPPOSED
 TO BE AHU-7? PLEASE COORDINATE FLOOR PLANS WITH
 SCHEDULES.
  
 19. M2.4.2: THE 8X6 O.A. DUCT FOR AHU-7 IS PENETRATING
 A 3-HOUR WALL BETWEEN STORAGE AND EXERCISE ROOMS, AS
 SHOWN ON A-254. SHOW OPENING PROTECTIVES IN ACCORDANCE
 WITH FBC,M 607.5. A MINIMUM 3-HOUR FIRE DAMPER IS
 REQUIRED AT THIS LOCATION PER FBC,M TABLE 607.3.1.
  
 20. M2.4.2: PG A-105 SHOWS HP-7 IN RESIDENT STORAGE 411
 TO BE IN A CLOSET (411A). THIS DOES NOT MATCH M2.4.2
 FLOOR PLAN, WHICH SHOWS AHU-7 IN A CAGE. COORDINATE
 PLANS, SHOWING COMPLIANCE WITH ALL PLENUM, SERVICE
 ACCESS AND R/A REQUIREMENTS AS STATED IN COMMENT 17.
 NOTE: ROOM 411 IN ITS ENTIRETY WILL BE CONSIDERED A
 PLENUM UNLESS THE 8X6 O.A. DUCT TIES INTO A DUCTED
 RETURN OR THE CLOSET SHOWN ON A-105 IS USED AS THE
 PLENUM.
  
 21. M2.4.2: FITNESS ROOM, AHU-9 APPEARS TO BE IN SOME
 KIND OF ENCLOSURE WITH NO OPENINGS FOR R/A OR SERVICE.
 SHOW SOURCE OF RETURN AIR FOR AHU-9. BALANCED RETURN IS
 REQUIRED PER FBC,M 601.4. ALSO, SHOW MEANS OF SERVICE
 ACCESS AS REQUIRED BY FBC,M SEC.306.
  
 22. M2.4.2: THERE IS NO SOURCE OF CONDENSER WATER SHOWN
 FOR AHU-7 OR AHU-9. PLEASE CLARIFY. FBC106.1.1
  
 23. M2.5.2: THE 8X6 O.A. DUCT FOR AHU-7 IS PENETRATING
 A 3-HOUR WALL BETWEEN STORAGE (511) AND OFFICE
 (RESIDENTS' CONFERENCE CENTER 533) AS SHOWN ON A-255.
 SHOW OPENING PROTECTIVES IN ACCORDANCE WITH FBC,M
 607.5. A MINIMUM 3-HOUR FIRE DAMPER IS REQUIRED AT THIS
 LOCATION PER FBC,M TABLE 607.3.1.
  
 24. M2.5.2: OFFICE, AHU-9 APPEARS TO BE IN SOME KIND OF
 ENCLOSURE WITH NO OPENINGS FOR R/A OR SERVICE. SHOW
 SOURCE OF RETURN AIR FOR AHU-9. BALANCED RETURN IS
 REQUIRED PER FBC,M 601.4. ALSO, SHOW MEANS OF SERVICE
 ACCESS AS REQUIRED BY FBC,M SEC.306.
  
 25. M2.5.2: THERE IS NO SOURCE OF CONDENSER WATER SHOWN
 FOR AHU-9. PLEASE CLARIFY. FBC106.1.1
  
 26. M2.5.2: FOR STORAGE ROOM 511, SEE COMMENT #20 AND
 SHOW COMPLIANCE WITH THE SAME. COORDINATE MECHANICAL
 FLOOR PLAN WITH PG A-106.
  
 27. M2.6.1 AND M2.6.2: PLAN INDICATES IN ONE LOCATION
 THAT THESE PAGES ARE TYPICAL FOR FLOORS 5 THRU 7, AND
 IN ANOTHER INDICATE FLOORS 6 AND 7. THESE PAGES APPEAR
 TO BE FOR FLOORS 6 AND 7 SINCE THERE ARE SEPARATE PAGES
 FOR THE 5TH FLOOR WHICH IS NOT TYPICAL. PLEASE CORRECT
 PAGE TITLES AND CLARIFY. FBC 106.1.3.
  
 28. M2.6.2: FOR STORAGE ROOM 611 AND 711, SEE COMMENT
 #20 AND SHOW COMPLIANCE WITH THE SAME. COORDINATE
 MECHANICAL FLOOR PLAN WITH PG A-107.
  
 29. M2.7.1: CONDENSER WATER LINE SIZES ON ROOF PLAN DO
 NOT MATCH THOSE ON RISERS AS SHOWN ON M5.2.1. EXAMPLE:
 RISER DIAGRAM SHOWS 3" LINES FEEDINGCWR-1 (2 1/2")
 AND CWR-2 (2"), BUT ROOF PLAN SHOWS A 4" LINE FEEDING
 BOTH RISERS WITH THE 4" LINES CONTINUING TO CWR-2.
 PLEASE COORDINATE DRAWINGS.
  
 30. M2.7.2: CONDENSER WATER LINE SIZES ON ROOF PLAN DO
 NOT MATCH THOSE ON RISER DIAGRAMS AS SHOWN ON M5.2.1
 AND M2.5.2. EXAMPLE: CWR-10 ON ROOF PLAN SHOWS 2 1/2"
 LINES BUT RISER DIAGRAM SHOWS 2" LINES. PLEASE
 COORDINATE DRAWINGS.
  
 31. M 2.7.2: TX-21 RISER TERMINATES IN OR UNDER THE
 ELEVATOR MACHINE ROOM. MECHANICAL EXHAUST SHALL BE
 DISCHARGED TO THE OUTDOORS PER FBC,M 501.2.
  
 32. M2.7.2: AC BOILER, THIS DOES NOT APPEAR ON ANY
 MECHANICAL EQUIPMENT SCHEDULES OR IN PLUMBING PLANS
 OTHER THAN THE GAS ISOMENTRIC DIAGRAM. SHOW THE TOTAL
 BTU/H OF ALL GAS APPLIANCES IN THE BOILER ROOM (SEE
 COMMENT #56 REGARDING SIZE OF BOILER), SIZE AND
 LOCATION OF VENTING, AMOUNT OF COMBUSTION AIR REQUIRED,
 METHOD USED TO CALCULATE COMBUSTION AIR (FBC,FG 304.6)
 AND FREE AREA ASSOCIATED WITH ALL LOUVERS AND GRILLS
 USED FOR COMBUSTION AIR (FBC,FG 304.10).
  
 33. M2.7.1 AND 2.7.2: VERIFY THAT OARTU'S HAVE
 SUFFICIENT CLEARANCE FOR SERVICE AND VENTILATION
 RELATED TO POTENTIAL OBSTRUCTIONS SUCH AS MANSARD ROOF
 STRUCTURES AND MECHANICAL SCREEN WALLS. FBC,M 306.1
  
 34. M4.1 - 4.3: SOME SUPPLY FLEX DROPS ARE MISSING
 INFORMATION SUCH AS DUCT SIZE, CFM AND GRILL SIZE.
 PLEASE PROVIDE ALL MISSING INFORMATION ON APARTMENT
 FLOOR PLANS. IF A SUPPLY DROP CFM FALLS OUTSIDE THE CFM
 RANGE OF THE FLEX DUCT SCHEDULE AS SHOWN ON M6.1,
 EITHER REVISE THE SCHEDULE TO SHOW THE SIZE TO BE USED
 OR SHOW ALL DUCT SIZES ON FLOOR PLANS. SHOWING ALL FLEX
 DUCT SIZES ON FLOOR PLANS WOULD BE BENEFICIAL DURING
 THE INSPECTION PROCESS.
  
 35. M4.1 - 4.3: SEVERAL BRANCH AND TRANSFER RECTANGULAR
 DUCTS ARE MISSING SIZES FOR SUPPLY AND RETURN. PLEASE
 PROVIDE ALL MISSING INFORMATION. FBC 106.1.1 AND FBC
 106.3.5.1.4
  
 36. M4.1 - 4.3: SOME R/A TRANSFER DUCTS, ESPECIALLY IN
 THE MASTER SUITES ARE NOT DESIGNED TO MEET THE BALANCED
 RETURN EXCEPTIONS UNDER FBC,M 601.4. IF TRANSFERS AND
 JUMPERS ARE NOT DESIGNED TO MEET THESE EXCEPTIONS, A
 FIELD TEST WILL BE REQUIRED AAT FINAL INSPECTION TO
 VERIFY PRESSURE DIFFERENTIALS ACROSS CLOSED BEDROOM
 DOORS DO NOT EXCEED 0.01" W.C. IN ACCORDANCE WITH THIS
 SECTION.
  
 37. M4.1: UNIT C3, FLOOR PLAN DOES NOT SHOW OUTDOOR AIR
 DUCT PENETRATION FROM CORRIDOR AS SHOWN ON M2.4.2.
 PLEASE COORDINATE DRAWINGS. ALSO, SEE COMMENT # 13
 REGARDING DUCT PENETRATIONS OF CORRIDOR WALLS. THIS
 APPLIES TO ALL UNIT FLOOR PLANS.
  
 38. M4.1, M4.2, M5.1: BATH AND DRYER EXHAUST DUCTS
 WHICH ENTER A SHAFT AND UTILIZE A SUBDUCT SYSTEM ARE
 EXEMPT FROM FIRE DAMPERS UNDER THE EXCEPTIONS LISTED IN
 FBC,M 607.5.5.1. HOWEVER, THEY ARE NOT EXEMPT FROM
 SMOKE DAMPERS WHICH ARE REQUIRED BY THIS SECTION. NOTE:
 SMOKE DAMPERS SHALL NOT BE INSTALLED IN CLOTHES DRYER
 EXHAUST DUCTS PER FBC,M 504.2. ALSO, AN INLINE
 BACKDRAFT DAMPER IS ALSO PROHIBITED UNDER THIS SECTION.
 SEE ALSO COMMENTS #9 AND #10.
  
 39. M4.1, M4.2, M5.1: BATH EXHAUST SUBDUCT SYSTEM
 REQUIRES A CONTINUOUS AIRFLOW UPWARD TO THE OUTSIDE IF
 THE FIRE DAMPER EXCEPTION IS TO BE CLAIMED UNDER FBC,M
 607.5.5.1 (1.1). THIS WOULD REQUIRE A FAN ON THE ROOF
 ABOVE THE SUBDUCT SYSTEM WHICH WOUDL RUN CONTINUOUSLY,
 EVEN UNDER EMERGENCY CONDITIONS.
  
 40. M4.1 AND M4.2: MECHANICAL FLOOR PLANS SHOW RETURNS
 DUCTED TO A/C CLOSETS WHICH ARE BEING USED AS PLENUMS
 (SOME WITH SOLID DOORS). FLOOR PLAN ON A-803 (FOR
 EXAMPLE) SHOWS A/C CLOSETS WITH 7'8" CEILINGS, WHICH
 WOULD NOT ALLOW FOR THE DUCTED RETURN TO GET BACK TO
 THE A/C UNIT, AND BIFOLD DOORS. IS THE R/A TO BE DUCTED
 TO THE CLOSET OR THROUGH BIFOLD LOVER DOORS? MECHANICAL
 AND ARCHITECTURAL PLANS ARE IN CONFLICT. PLEASE
 CLARIFY. NOTE: SEE COMMENT #17 REGARDING A/C CLOSET
 DOORS.
  
 41. M4.2 AND M4.3: TH1, 2 AND 3 ALL SHOW DRYER EXHAUST
 DUCTS TO BE 5 INCH ROUND. THIS WOULD NOT CONFORM TO
 MOST DRYER MANUFACTURER'S INSTALLATION INSTRUCTIONS.
 THIS CAN NOT BE VERIFIED AS INSTALLATION INSTRUCTIONS
 WERE NOT PROVIDED. CLOTHES DRYERS SHALL BE EXHAUSTED IN
 ACCORDANCE WITH THE MANUFACTURER?S INSTRUCTIONS IN
 ACCORDANCE WITH FBC,M 504.1. PROVIDE DRYER
 MANUFACTURER'S INSRUCTIONS TO DEMONSTRATE THAT THE
 EXHAUST AS SHOWN ON PLANS IS IN COMPLIANCE.
  
 42. M4.2: TH3, PLAN SHOWS 12X8 DUCT DOWN FROM 2ND FLOOR
 TO KITCHEN. THE RISER DUCT IS SHOWN IN THE EXACT SAME
 LOCATION AS A CONCRETE COLUMN. SEE PG A-808. THERE IS A
 CHASE WITHIN THE UNIT DESIGNED FOR THIS RISER DUCT
 MAKING THE 2-HOUR RATED ENCLOSURE IN THE PARKING GARAGE
 UNNECESSARY, ASIDE FROM THE FACT THAT IT IS IN CONFLICT
 WITH A STRUCTURAL COLUMN. PLEASE COORDINATE MECHANICAL
 PLANS WITH ARCHITECTURAL PLANS.
  
 43. M4.3: TH1, MECHANICAL FLOOR PLAN SHOWS A/C DUCT
 DESIGNED TO THE LAUNDRY ROOM INSTEAD OF THE A/C CLOSET.
 SEE PG A-801 FOR APARTMENT LAYOUT. COORDINATE
 MECHANICAL AND ARCHITECTURAL FLOOR PLANS. THE DUCT
 SYSTEM CANNOT BE REVIEWED FOR CODE COMPLIANCE AT THIS
 TIME UNTIL THE DUCT SYSTEM MATCHES FLOOR PLANS. ALSO,
 IF A/C UNIT IS TO BE LOCATED IN KITCHEN, PLEASE SEE
 FBC,M 407.1 REGARDING RETURN AIR INTAKE LOCATIONS.
  
 44. M4.3: TH2, THERE IS NO SUPPLY DUCT GOING TO A/C
 CLOSET. SUPPLY DUCT ONLY GOES FROM 2ND FLOOR DOWN TO
 1ST FLOOR, WITH NO SOURCE OF SUPPLY AIR. PLEASE
 CLARIFY.
  
 45. M4.1 THROUGH M4.3: NO INFORMATION COULD BE FOUND ON
 PLANS REGARDING VENTILATION FOR UNITS. SHOW COMPLIANCE
 WITH FBC,M SEC.402 OR TABLE 403.3. ALSO, SHOW HOW UNITS
 ARE TO BE PRESSURIZED WITH RESPECT TO THE OUTDOORS IN
 ACCORDANCE WITH FBC 13-409.1.ABC.2.
  
 46. M4.4: IF LOWER AND UPPER LOBBY AREAS ARE DEEMED TO
 BE AN ATRIUM RATHER THAN A MEZZANINE DURING BUILDING
 PLAN REVIEW, SMOKE CONTROL SHALL BE REQUIRED PER FBC
 SEC. 404.
  
 47. M4.4: MECHANICAL FLOOR PLAN ON 2ND FLOOR SHOWS THE
 SUPPLY RISER GOING DOWN THROUGH THE CORNER OF A
 CONCRETE BLOCK WALL TO THE FIRST FLOOR. THE FLOOR PLAN
 OR A-301 SHOWS A CHASE IN THE A/C CLOSET (PROBABLY FOR
 A/C DUCT) AND THE DOOR TO THE A/C CLOSET IS SHOWN WHERE
 THE RETURN WALL GRILL IS LOCATED. PLEASE COORDINATE
 PLANS. ALSO, LIFE SAFETY PLAN A-252 SHOWS THE
 MECHANICAL ROOM WALL AS 2-HOUR RATED. SHOW OPENING
 PROTECTIVES AT ALL DUCT PENETRATIONS OF RATED
 ASSEMBLIES (VERTICAL AND HORIZONTAL) IN ACCORDANCE WITH
 FBC,M 607.5.
  
 48. M4.4: WHAT IS THE PURPOSE OF THE ACCESS PANELS IN
 THE 2-HOUR RATED ENCLOSURES? IF THIS IS THE LOCATION OF
 SUPPLY FANS, PLEASE SHOW THE FANS ON THE PLANS. FBC
 106.1.1 AND FBC 106.3.5.1.4. NOTE: 60X30 SAR'S WOULD
 INDICATE THAT THESE ARE SUPPLY DUCTS.
  
 49. M4.4: M4.4: EF-1 IN TOILET ROOM 124 SHALL BE
 INTERLOCKED TO RUN WITH AHU-6 TO ENSURE ALL AIR
 SUPPLIED TO THAT SPACE IS EXHAUSTED IN ACCORDANCE WITH
 FBC,M 403.2.1(3). PROVISIONS SHALL ALSO BE MADE TO
 ASSURE THAT BOTH THE AHU AND THE EF ARE RUNNING
 WHENEVER THE SPACE IS OCCUPIED IN ACCORDANCE WITH FBC,M
 401.3 (UNLESS BOTH ARE SET TO RUN CONTINUOUS).
  
 50. M5.1: PLAN SHOWS ROOF CURBS FOR RTU 1 AND 2 USED
 FOR SUPPLY DUCT. IF SO, CURBS SHALL BE LINED WITH MIN.
 R-8, UL-181 APPROVED DUCT MATERIAL IN ACCORDANCE WITH
 FBC TABLE 13-410.1.ABC.2.2 AND FBC,M 604.13. IF THIS IS
 A LISTED SYSTEM, PROVIDE SUBMITTAL.
  
 51. M5.1: M5.1: ALL DUCT PENETRATIONS OF SHAFT FOR RTU
 1 AND 2 SHALL BE PROTECTED BY FIRE AND SMOKE DAMPERS
 PER FBC,M 607.5.5.1. SEE COMMENT #13.
  
 52. M5.1: TOILET EXHAUST RISER PENETRATIONS REQUIRE
 SMOKE DAMPERS AND ROOFTOP EXHAUST FANS TO RUN
 CONTINUOUS UNDER ALL CONDITIONS PER FBC,M 607.5.5.1.
 SEE COMMENT #38 AMD #39.
  
 53. M5.1: DRYER EXHAUST RISERS ARE NOT EXEMPT FROM
 SMOKE DAMPER REQUIREMENTS. SEE COMMENT #9 AND #38.
  
 54. M5.2.1: COORDINATE PIPE SIZES WITH THOSE SHOWN ON
 ROOF PLAN (M2.7.1, M2.7.2) AND WATER FLOW DIAGRAM
 (M5.3). ALSO, SHOW ALL PIPE SIZES, INCLUDING BRANCHES
 FOR AHU'S 2,5,6,14.
  
 55. M5.2.2: COORDINATE PIPE SIZES WITH THOSE SHOWN ON
 ROOF PLAN (M2.7.1, M2.7.2) AND WATER FLOW DIAGRAM
 (M5.3). ALSO, SHOW ALL PIPE SIZES, INCLUDING BRANCHES
 FOR AHU'S 10,11,12.
  
 56. M5.3: DIAGRAM ON THIS PAGE SHOWS AC BOILER TO BE
 600,000 BTU/H BUT PLUMBING PLAN SHOWS THE BOILER AT
 200,000 BTU/H. PLEASE CLARIFY. PROVIDE SUBMITTAL FOR
 THE BOILER AND ALL EQUIPMENT SHOWN ON THIS PAGE. FBC
 106.1.2.
  
 57. M5.3: COORDINATE PIPE SIZES WITH THOSE SHOWN ON
 ROOF PLAN (M2.7.1, M2.7.2) AND RISER DIAGRAMS (M5.2.1,
 M5.2.2).
  
 58. M5.3: TOWER NOTES, NOTE #2, PROVIDE DETAIL AND WIND
 LOAD CALCULATIONS FOR THIS INSTALLATION. FBC,M 301.13,
 FBC, CH.16 AND FCB 106.1.2.
  
 59. M6.1: EF-3, 4 POOL TOILET AND POOL EQUIPMENT ROOMS
 COULD NOT BE LOCATED ON MECHANICAL PLANS. PROVIDE
 MISSING INFORMATION. FBC 106.1.1
  
 60. M6.1: SHOW LOCATION OF EF-7 AND FIRE PUMP ROOM ON
 PLANS. ELECTRICAL PLAN INDICATES FIRE PUMPS ARE DIESEL
 OPERATED. PROVIDE INFORMATION ON FUEL STORAGE MEANS,
 LOCATION AND QUANTITIES AS WELL AS LOCATION AND DETAILS
 OF ALL FUEL DELIVERY AND REFUELING LINES. PROVIDE
 SUBMITTALS FOR ALL LISTED EQUIPMENT USED FOR FUEL
 STORAGE AND DELIVERY. STATIONARY COMBUSTION ENGINES
 SHALL COMPLY WITH NFPA 37-02 AND FUEL STORAGE SHALL
 COMPLY WITH NFPA 30-00.
  
 61. M6.1: HEAT PUMP SCHEDULE, NOTE INDICATES HONEYWELL
 "T-87" THERMOSTAT. THIS TYPE OF THERMOSTAT IS NOT
 PROGRAMMABLE AS CALLED FOR ON PG M0.2 AUTOMATIC
 TEMPERATURE CONTROLS NOTE (A). THERMOSTATS SHALL COMPLY
 WITH FBC 13-407.1.ABC.2.4.1.
  
 62. M6.1: PROVIDE SUBMITTALS FOR ALL LISTED MECHANICAL
 EQUIPMENT TO BE USED ON THIS PROJECT. FBC 106.1.3
  
 63. M6.1: WATER SOURCE HEAT PUMPS SHALL HAVE
 TWO-POSITION AUTOMATIC VALVES INTERLOCKED TO SHUT OFF
 WATER FLOW WHEN THE COMPRESSOR IS OFF IN ACCORDANCE
 WITH FBC 13-411.1.ABC.1.4.
  
 64. M7.1: ROOFTOP CLEARANCE SCHEDULE, THE INCORRECT
 CODE YEAR AND CODE SECTION ARE REFERENCED. THE CORRECT
 YEAR/SECTION ARE AS FOLLOWS: FBC 2004 TABLE 1509.7.
  
 65. M7.1: INSULATED DUCT THRU ROOF DETAIL, THIS DETAIL
 DOES NOT MAKE SENSE AS THE NOTES POINT TO STRUCTURAL
 STEEL COMPONENTS WHERE NONE EXIST. THE DETAIL ALSO
 INDICATES PENETRATION OF AN EXISTING ROOF DECK. THIS IS
 NEW CONSTRUCTION. NOTHING IS EXISTING. ALSO, IF
 FLASHING AND DUCT ARE TO BE WELDED, PLEASE PROVIDE
 ADDDITIONAL INFO, SUCH AS METHOD OF WELDING AND
 REQUIRED THICKNESS OF SHEET METAL FOR EACH.
  
 66. M7.1: CLOSED CIRCUIT COOLER DETAIL, WHERE VIBRATION
 ISOLATION IS EMPLOYED, AN APPROVED MEANS OF
 SUPPLEMENTAL RESTRAINT SHALL BE USED TO ACCOMPLISH
 SUPPORT AND RESTRAINT IN ACCORDANCE WITH FBC,M 301.10.
 ALSO, SHOW COMPLIANCE WITH FBC,M 301.13 FOR WIND
 RESISTANCE.
  
 67. M7.1: HEAT PUMP DETAIL, THERE IS ANOTHER DETAIL FOR
 THIS SAME INSTALLATION ON M7.3, BUT THE DETAILS DO NOT
 MATCH. PLEASE CHOOSE ONE METHOD AND REMOVE THE OTHER
 FROM PLANS TO AVOID CONFLICT. FBC 106.1.1.
  
 68. M7.2: DUCT SUPPORT DETAIL, THERE IS ANOTHER DETAIL
 FOR THIS SAME INSTALLATION ON M7.3, BUT THE DETAILS DO
 NOT MATCH. PLEASE CHOOSE ONE METHOD AND REMOVE THE
 OTHER FROM PLANS TO AVOID CONFLICT. FBC 106.1.1. NOTE:
 COMPLIANCE WITH FBC,M 301.13 AND FBC TABLE 1509.7 IS
 REQUIRED.
  
 69. M7.3: SHOW HOW AIR SEPARATOR AND EXPANSION TANK ARE
 TO BE SECURED TO STRUCTURE IN A MANNER THAT MEETS WIND
 LOAD REQUIREMENTS OF FBC,M 301.13 AND FBC CH.16.
  
 70. M7.2 AND 7.3: FIRE DAMPERS, SMOKE DAMPERS AND
 COMBINATION FIRE/SMOKE DAMPERS SHALL BE INSTALLED IN
 ACCORDANCE WITH THEIR LISTING AND MANUFACTURER'S
 INSTALLATION INSTRUCTIONS PER FBC,M 607.2. WHERE
 CONFLICTS BETWEEN DETAIL ON PLANS AND MANUFACTURER'S
 INSTRUCTIONS OCCUR, THE MANUFACTURER'S INSTRUCTIONS
 SHALL GOVERN.
  
 71. M7.3:THERE ARE TWO DETAILS FOR VERTICAL PIPE FLOOR
 PENETRATIONS ON THIS PAGE. WHICH IS TO BE USED? PROVIDE
 MANUFACTURER AND LISTING FOR ALL THROUGH-PENETRATION
 FIRESTOP SYSTEMS TO BE USED AT RATED ASSEMBLIES. FBC
 SEC.712
  
 72. M7.3: ROOF MOUNTED EF DETAIL HAS A NOTE FOR
 STRUCTURAL ENGINEER TO DETERMINE AND VERIFY ATTACHMENT
 DETAILS FOR REQUIRED WIND LOADS. NO SUCH INFORMATION
 COULD BE FOUND IN STRUCTURAL PLANS. FBC 301.13
  
 73. M7.4: GARAGE EF 14-16 MOUNTING DETAIL DOES NOT SHOW
 HOW FANS, SLEEVES OR SOUND ATTENUATION BOXES ARE TO BE
 SECURED TO STRUCTURE. PROVIDE SUFFICIENT DETAIL AND
 EQUIPMENT SUBMITTALS. FBC 106.1.2
  
 74. M7.4: GARAGE EF 8-13, SHOW HOW FANS ARE TO BE
 SECURED TO STRUCTURE TO MEET WIND LOAD REQUIREMENTS PER
 FBC,M 301.13 AND CLEARANCE REQUIREMENTS OF FBC TABLE
 1509.7. ALSO PROVIDE SUBMITTAL FOR FLEXIBLE DUCT
 CONNECTIONS, SHOWING SUITABLILITY FOR OUTDOOR USE.
  
 75. GARAGE EF 17-18, SHOW HOW FANS ARE TO BE SECURED TO
 STRUCTURE TO MEET WIND LOAD REQUIREMENTS PER FBC,M
 301.13. PROVIDE SUBMITTAL SHOWING PENTHOUSE TYPE FAN
 HOUSING SUITABLE FOR USE IN 140 MPH WIND ZONE. FBC
 CH.16
  
 76. M7.4: VERTICAL HP DETAIL, SHOW MEANS OF AUXILIARY
 DRAIN PROTECTION PER FBC,M 307.2.3.
  
 77. M7.4: TOILET AND DRYER EXHAUST DETAILS, VERIFY
 SIZES OF WALL CAPS CORRESPOND WITH THOSE SHOWN ON FLOOR
 PLANS. BE SURE TO VERIFY DRYER EXHAUST SIZES ARE IN
 COMPLIANCE WITH DRYER MANUFACTURER'S INSTALLATION
 INSTRUCTIONS. SEE COMMENT #41.
  
 78. M7.4: DUCT SMOKE DETECTORS SHALL BE CONNECTED TO
 THE BUILDING FIRE ALARM SYSTEM PER FBC,M 606.4.1.
  
 ENERGY CALCULATIONS:
  
 79. OUTDOOR AIR QUANTITIES SHOWN ON SIZING SUMMARY DO
 NOT MATCH THOSE GIVEN ON PG M0.1. THESE VALUES SHOULD
 CORRESPOND. EXAMPLE: EXERCISE ROOM ON SCHEDULE CALLS
 FOR 150 CFM O.A. WHILE THE SUMMARY SHOWS 120 CFM O.A.
 PLEASE SHOW CORRELATION BETWEEN DESIGN ON PLANS AND
 CALCULATIONS USED FOR SIZING OF EQUIPMENT.
  
 80. COIL SIZING/ COOLING CAPACITY SHOWN ON SIZING
 SUMMARY DO NOT MATCH THOSE GIVEN ON PG M6.1. EXAMPLE 1:
 APT C2 ON SCHEDULE SHOWS 23.83 MBH AND APT C2 ON
 SUMMARY SHOWS 28.8 MBH.THIS UNIT LOOKS TO BE
 SIGNIFICANTLY UNDERSIZED BASED ON THE SIZING
 SUMMARY/COOLING LOADS. PLEASE CLARIFY.
 EXAMPLE 2: SUMMARY FOR AHU-OFFICES CALLS FOR SENSIBLE
 COIL LOAD OF 11.3 MBH WHILE ON SCHEDULE AHU-4 SHOWS
 16.87 MBH. HVAC SYSTEMS AND EQUIPMENT SHALL BE SIZED TO
 PROVIDE NO MORE THAN THE SPACE AND SYSTEM LOADS
 CALCULATED IN ACCORDANCE WITH FBC 13-407.1.ABC.1.
 PLEASE SHOW EQUIPMENT TO BE SIZED ACCORDINGLY.
  
 81. SYSTEM REPORT COMPLIANCE: SYSTEM SIZES AS SHOWN ON
 REPORT DO NOT CORRESPOND WITH SYSTEMS IN THE SYSTEM
 SIZING SUMMARY. GROUPING OF SYSTEMS WILL INCREASE THE
 SIZE OF THE SYSTEM IN THE REPORT WILL DISTORT THE
 ALLOWED EFFICIENCY CRITERIA WHICH WOULD PROVIDE UNDUE
 TRADE-OFF CREDIT FOR EFFICIENCY OF THE COOLING SYSTEMS.
 EXAMPLE: SYSTEM 1 IS LISTED FOR ALL TOWNHOMES AS ONE
 "WATER COOLED >240,000 BTU/H" UNIT. THE TOWNHOMES ARE
 EACH COOLED BY INDIVIDUAL UNITS AND WOULD BE
 CATEGORIZED AS "WATER COOLED 17,000 TO <135,000 BTU/H"
 IN ACCORDANCE WITH FBC TABLE 13-407.1.ABC.3.2B. THIS
 TABLE GIVES A MINIMUM EFFICIENCY CRITERIA OF 12.00 EER.
 "SYSTEMS" SHOULD CORRESPOND WITH "ZONES" IN THE INPUT
 DATA REPORT. FOR GUIDANCE AS TO WHAT ACTUALLY
 CONSTITUTES A ZONE, PLEASE SEE FBC 13-407.1.ABC.2.2.1.
  
 82. INPUT DATA REPORT: BUILDING ENVELOPE COMPONENTS AS
 SHOWN ON THE INPUT DATE REPORT DO NOT CORRESPOND WITH
 THE TYPE OF CONSTRUCTION SHOWN ON PLANS. EXAMPLE:
 REPORT SHOWS THE ROOF TO BE INSULATED WITH R-19 BATTS.
 DETAILS ON A-652 INDICATE THE ROOF INSULATED WITH RIGID
 BOARD TO A VALUE OF R-14 IN A BUILT-UP ROOF SYSTEM.
 ALSO, NO INFORMATION COULD BE FOUND REGARDING TYPE OR
 R-VALUE OF INSULATION TO BE USED IN THE MANSARD ROOF
 SECTIONS WHICH ARE ABOVE CONDITIONED SPACES. NO
 INFORMATION COULD BE FOUND IN ARCHITECTURAL PLANS OR
 DETAILS SHOWING 1.36" INSULATION AT EXTERIOR WALLS AS
 INDICATED ON THE REPORT. PLEASE CLARIFY ON PLANS AND
 PROVIDE CORRESPONDING INFORMATION ON CALCULATIONS.
  
 83. WHAT IS THE R-VALUE OF THE 3RD FLOOR FLOOR/CEILING
 ASSEMBLY BETWEEN THE PARKING GARAGE AND THE 3RD FLOOR
 APARTMENTS? THIS INFORMATION IS NOT SHOWN ON PLANS OR
 IN THE REPORT. ALSO, PLEASE EXPLAIN HOW AN 8"
 LIGHTWEIGHT CONCRETE BLOCK WITH 1.36" INSULATION SYSTEM
 IS TO BE USED FOR THE FLOOR IN THE LOBBY AS INDICATED
 IN THE REPORT.
  
 84. ENERGY CALCULATIONS SHOW A "PLANT" CHILLER AT 390
 TONS. THERE IS NO CHILLER SHOWN AS PART OF THIS SYSTEM.
 ALSO, THE CLOSED CIRCUIT COOLERS AND A/C BOILER WERE
 OMITTED FROM THE CALCULATIONS. PLEASE CORRECT AND
 RESUBMIT.
  
 85. STAIR AND ELEVATOR SHAFT VENTS SHALL BE EQUIPPED
 WITH MOTORIZED DAMPERS THAT ARE CAPABLE OF BEING
 AUTOMATICALLY CLOSED DURING NORMAL BUILDING OPERATION
 AND ARE INTERLOCKED TO OPEN AS REQUIRED BY FIRE AND
 SMOKE DETECTION SYSTEMS. FBC 13-409.1.ABC.3.1
  
 86. MECHANICAL SYSTEMS SHALL BE DESIGNED TO ASSURE THAT
 BUILDINGS ARE PRESSURIZED WITH RESPECT TO OUTDOORS.
 PROVIDE AIR BALANCE SCHEDULE(S) SHOWING COMPLIANCE FOR
 ALL ZONES/FLOORS. FBC 13-409.1.ABC.2
  
 87. SHOW SHUTOFF DAMPER CONTROLS FOR O.A. SUPPLY AND
 EXHAUST SYSTEMS AS REQUIRED BY FBC 13-409.1.ABC.3.3.
  
 88. DEMONSTRATE COMPLIANCE WITH FBC 13-406.1.ABC.1.1
 FOR AIR INFILTRATION AT EXTERIOR DOORS AND WINDOWS.
  
 IF YOU HAVE ANY QUESTIONS PLEASE CONTACT:
 RONALD J. REGUEIRO
 561.805.6719
 [email protected]
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved