| Date |
Text |
| 2007-11-17 10:24:59 | REVIEW #: 2NE |
| | ACTION: PASS/PENDING |
| | |
| | FBC 2004 CODE FAMILY W/ 2005 AND 2006 SUPPLEMENTS |
| | FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| | |
| | THE FOLLOWING COMMENTS ARE NUMBERED TO CORRESPOND WITH |
| | PREVIOUS REVIEW COMMENTS AS WELL AS DESIGNER'S WRITTEN |
| | RESPONSES FOR THE PURPOSE OF CONTINUITY. |
| | |
| | COMMENTS 1 THROUGH 15 HAVE BEEN ADEQUATELY ADDRESSED |
| | AND ARE IN COMPLIANCE. |
| | |
| | COMMENT 16: THE SAME ENERGY CALCULATIONS FROM PREVIOUS |
| | SUBMITTAL HAVE BEEN RESUBMITTED. THE ELECTRICAL |
| | DESIGNER IS NOT LISTED ON THE COMPLIANCE FORM. ALSO, |
| | THE ROOF TYPE IS NOT CONSISTENT WITH THIS TYPE OF |
| | CONSTRUCTION. |
| | NOTE: THIS IS A RENOVATION (AS DEFINED IN FBC 13-202) |
| | OF PART OF AN EXISTING BUILDING. METHOD A "WHOLE |
| | BUILDING COMPLIANCE" IS NOT AVAILABLE AS THIS IS NOT A |
| | WHOLE BUILDING CONSTRUCTION PROJECT. METHOD B OR C |
| | SHALL BE USED TO SHOW COMPLIANCE IN ACCORDANCE WITH FBC |
| | 13-400.0.C.4. |
| | METHOD A COMPLIANCE IS ONLY ALLOWED IN EXISTING |
| | BUILDINGS IF THE BUILDING CAN NOT BE BROUGHT INTO |
| | COMPLIANCE WITH METHOD B OR C PRESCRIPTIVE REQUIREMENTS |
| | AND THE ENTIRE BUILDING IS BROUGHT INTO COMPLIANCE WITH |
| | METHOD A IN ACCORDANCE WITH FBC 13-101.4.2. |
| | PROVIDE CORRECTED ENERGY CALCULATIONS AND RESUBMIT. |
| | |
| | NOTE: MECHANICAL PLANS HAVE BEEN STAMPED, BUT REVIEW |
| | WILL BE IN "FAILED" STATUS PENDING ACCEPTANCE OF ENERGY |
| | CALCULATIONS BY ALL INTERESTED TRADES. |
| | |
| | IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |
| | RONALD J. REGUEIRO |
| | 561.805.6719 |
| | [email protected] |
| | |