| Date |
Text |
| 2007-07-25 17:57:23 | DENIED BY BUILDING |
| | |
| | 1)SECTION R803.2.3.1 OF 2006 REVISIONS TO 2004 FBC |
| | RESIDENTIAL CODE REQUIRES ROOF SHEATHING TO BE FASTENED |
| | WITH 8D RING SHANK NAILS IN ALL ROOF ZONES. FASTENER |
| | SPACING IS REQUIRED TO BE 4" OC IN ROOF ZONE 3. PLEASE |
| | REVISE THE NOTES ON SHEET 2. |
| | |
| | 2) SAFETY GLAZING IS REQUIRED IN THE MASTER BATHROOM |
| | WINDOW. PLEASE CLARIFY THAT T. G. IS AN ABBREVIATION |
| | FOR TEMPERED GLASS. THE ABBREVEATION TEMP. IS TYPICALLY |
| | USED TO DENOTE TEMPERED GLASS. |
| | |
| | 3) THE ENERGY CALULATION FORM THAT WAS SUBMITTED HAS |
| | BEEN REVISED BY THE 2006 REVISIONS TO THE 2004 FBC. THE |
| | CURRENT FORM IS 600C-04R WHICH IS TWO SIDED. I HAVE |
| | ATTACHED A COPY OF IT TO THE OLD FORMS. THE OWNER/AGENT |
| | IS REQUIRED TO SIGN THE FORM. THE OVERHANG OF 2' |
| | SPECIFIED ON THE FORM DOES NOT CONCUR WITH THE OVERHANG |
| | OF 1'-6"SPECIFIED ON THE WALL SECTION ON SHEET 2 OF |
| | THE PLANS. PLEASE CORRECT. |
| | |
| | 4)WPB ADMIN CODE 106.3* PRODUCT |
| | APPROVALS. THOSE PRODUCT WHICH ARE |
| | REGULATED BY DCA RULE 9B-72 SHALL BE |
| | REVIEWED AND APPROVED IN WRITING BY THE |
| | DESIGNER OF RECORD PRIOR TO SUBMITTAL |
| | FOR JURISDICTIONAL APPROVAL. |
| | |
| | 5) SUBMIT PRODUCT APPROVALS FOR THE ROOFING MATERIAL. |
| | |
| | 6) THE PRODUCT APPROVAL NOA THAT WAS SUBMITTED FOR THE |
| | STORM PANELS HAS PARTS THAT ARE NOT LEGIBLE. SUBMIT |
| | CLEAR LEGIBLE COPIES. |
| | |
| | 7) SPECIFY THE MOUNTING INSTALLATION, TYPE OF FASTENER |
| | AND FASTENER SPACING FOR THE STORM PANELS. THIS CAN BE |
| | DONE BY CIRCLING THE APPROPRIATE ITEMS ON THE PRODUCT |
| | APPROVAL. |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)805-6714 |