| 2007-07-11 16:48:43 | *** DENIED *** |
| | 1) PLEASE PROVIDE COMBUSTION AND MAKE-UP AIR, AND |
| | CALCULATIONS FOR GAS CLOTHES DRYERS AS THEY ARE IN A |
| | CONFINED SPACE, SEE 2004 FBC/FG 304. |
| | |
| | 2) PLEASE RE-CALCULATE OUTSIDE AIR CALCULATIONS. MY |
| | CALCULATIONS SHOW THAT ZONE 1 REQUIRES 1,000 CFM'S, |
| | ZONE 2 REQUIRES 531 CFM'S, AND ZONE 3 REQUIRES 750 |
| | CFM'S, SEE 2004 FBC/M TABLE 403.3 'SPECIALTY SHOPS' |
| | 'BEAUTY' . |
| | |
| | 3) SEE A/C SYSTEMS ON MECHANICAL PLANS ARE NOT LABELED |
| | CORRECT, CHECK THE WSHP SCHEDULE. |
| | |
| | 4) SEE RETURN AIR GRILL FROM UNIT 2 IS COMMON DUCTED TO |
| | UNIT 3 GRILL ALSO AND THIS WOULD REQUIRE SMOKE DETECTOR |
| | IN THE SUPPLY AND RETURN DUCTS, PER 2004 FBC/M 606.2.2. |
| | IF THE ERV SUPPLIED OUTSIDE AIR TO UNIT 3 RETURN AIR |
| | GRILL THEN THE RETURNS WOULD NOT BE A COMMON RETURN AND |
| | NOT REQUIRE SMOKE DETECTORS IN THE RETURNS, ONLY THE |
| | SUPPLIES. |
| | |
| | 5) PLEASE SHOW THE LOCATION OF THE DUCT SMOKE DETECTORS |
| | ON THE PLANS, ALSO THE ERV. SEE 2004 FBC/M 606.1. |
| | |
| | 6) PLEASE LIST THE ERV IN THE EQUIPMENT SCHEDULE. |
| | |
| | 7) PLEASE SUBMIT DETAILED MANUFACTURER'S |
| | SPECIFICATION'S AND INSTALLATION INSTRUCTIONS FOR THE |
| | ERV. |
| | |
| | 8) PLEASE SHOW THE CFM'S FOR THE BATHROOM EXHAUST FANS |
| | ON THE MECHANICAL PLANS. |
| | |
| | 9) THE FAN SCHEDULE IS SHOWING EF-2 AT 750 CFM'S, BUT |
| | IN THE NAILS ROOM IT SHOWS 1200 CFM'S, PLEASE CORRECT. |
| | |
| | 10) IF EF-2 IS REMOVING 1200 CFM'S AND OUTSIDE AIR INTO |
| | THE BUILDING IS ONLY 650 CFM'S THE BUILDING WOULD BE IN |
| | A NEGATIVE PRESSURE, PLEASE CORRECT. |
| | |
| | MECHANICAL PLAN REVIEW BY; |
| | TOM GORDON (561) 805-6729. |