| Date |
Text |
| 2008-05-28 15:09:13 | DENIED |
| | REFERENCE: FBC-2004 PLUMBING |
| | FBC-2004 FUEL GAS |
| | FBC-2004 BUILDING |
| | FBC-2004 CHAPTER 1 |
| | FBC-2004 CHAPTER 11 |
| | FLORIDA ADMINISTRATIVE CODE |
| | FLORIDA STATUTES |
| | CITY WPB MUNICIPAL CODE |
| | |
| | ****FROM PREVIOUS REVIEW: (2ND REVIEW) |
| | |
| | ******FROM PREVIOUS REVIEWS: (3RD REVIEW) |
| | |
| | 1. OK |
| | 2. OK |
| | 3. OK |
| | 4. OK |
| | 5. OK |
| | 6. OK |
| | 7. OK |
| | 8. OK |
| | 9. OK |
| | 10. OK |
| | 11. OK |
| | 12. OK |
| | 13. OK |
| | |
| | 14. SHT A-709 DETAILS 79 & 81. SHOW COMPLIANCE WITH |
| | SECTION 11-4.24 & ALL SUBSECTIONS. NOTE: FORWARD |
| | APPROACH REQUIRED ON CLEAR FLOOR SPACE AND CABINET |
| | DOORS ARE NOT APPROVED IN THE CLEAR FLOOR SPACE. |
| | ****RESPONSE NOTED, BUT SHT A-709 DETAILS 79 & 81 SHOW |
| | THE FLOOD RIM LEVEL, (COUNTER TOP), AT 3'0". PER CODE |
| | 34" IS MAXIMUM HEIGHT ALLOWED. SECTION 11-4.24.2. ALSO |
| | NOT SHOWN IS THE SINK DEPTH, SECTION 11-4.24.4, THE |
| | CLEAR FLOOR SPACE, SECTION 11-4.24.5, OR COMPLIANCE FOR |
| | THE FAUCET, SECTION 11-4.24.7. |
| | ******RESPONSE NOTED, BUT THE FOLLOWING IS STILL NOT |
| | SHOWN: THE SINK DEPTH, SECTION 11-4.24.4, THE CLEAR |
| | FLOOR SPACE, SECTION 11-4.24.5, OR COMPLIANCE FOR THE |
| | FAUCET, SECTION 11-4.24.7. ALSO INDICATE THE CLEARANCE |
| | REQUIRED BY SECTION 11-4.24.3. |
| | |
| | 15. OK |
| | 16. OK |
| | 17. OK |
| | 18. OK |
| | |
| | 19. SHT P1-101 SUBMIT A DETAIL FOR THE CANINE |
| | PRE-OP/POST-OP KENNELS. SHOW A DETAIL FOR THE WATER |
| | BACKFLOW PROTECTION AND CONNECTION TO THE DOG BOWLS. |
| | SECTION 608. SHOW THE CONNECTION TO THE TRENCH DRAINS |
| | AND THE SN-1 FIXTURES. SECTION 106.1.2. (SN-1 FIXTURES |
| | NOT SHOWN ON THE ISOMETRIC RISER DIAGRAM. CLARIFY). |
| | ****RESPONSE NOTED, BUT IT WAS A SELECTIVE RESPONSE. NO |
| | DETAIL FOR THE CANINE PRE-OP/POST-OP KENNELS WERE |
| | SUBMITTED. ALSO NO DETAIL FOR THE BACKFLOW PROTEDTION |
| | TO THE CONNECTION TO THE DOG BOWLS IS INDICATED ON SHT |
| | P2-101. THE ONLY BACKFLOW PROTECTION SHOWN IS FOR THE |
| | P-16 FIXTURES. INDICTE MANUFACTURE AND MODEL OF |
| | BACKFLOW PER TABLE 608.1. |
| | ******RESPONSE NOTED, BUT BACKFLOW PREVENTERS SHALL BE |
| | INSTALLED MAXIMUM 4 FEET ABOVE THE FLOOR FOR SERVICING |
| | AND TESTING. THE BACKFLOW PREVENTER IN THE RECESSED |
| | SHALL BE ACCESSIBLE FOR SERVICING & TESTING ALSO. |
| | |
| | 20. SHT P1-103 SEPARATE GAS PERMIT IS REQUIRED. THE |
| | FOLLOWING REQUIREMENTS SHALL BE SUBMITTED FOR GAS |
| | REVIEW: |
| | |
| | A. OK |
| | B. OK |
| | C. OK |
| | D. OK |
| | E. OK |
| | F. OK |
| | G. N/A |
| | H. N/A |
| | |
| | 21. OK |
| | 22. OK |
| | 23. OK |
| | 24. OK |
| | 25. OK |
| | 26. OK |
| | |
| | 27. SHT P3-101 SHOW ALL PIPE SIZES AND INDICATED ON THE |
| | SANITARY ISOMETRIC RISER DIAGRAM THE DFU'S AS THEY |
| | ACCUMULATE IN THE SYSTEM. TABLES 709.1, 710.1(1) & |
| | 710.1(2). |
| | ****RESPONSE NOTED, BUT THE DFU'S ARE NOT INDICATED AS |
| | THEY ACCUMULATE IN THE SYSTEM. |
| | ******RESPONSE NOTED, BUT MANY PIPE SIZES ARE NOT |
| | SHOWN. (EXAMPLE: ALL PIPING TO THE CAGES FOR PRE-OP & |
| | POST-OP). |
| | |
| | 28. OK |
| | 29. OK |
| | 30. OK |
| | 31. OK |
| | 32. OK |
| | 33. OK |
| | 34. OK |
| | |
| | 35. SUBMIT STORM RISER DIAGRAMS . SHOW ALL PIPE SIZES & |
| | INDICATE SQUARE FOOTAGE AS IT ACCUMULATES IN THE |
| | SYSTEM. ALSO SHOW ALL CLEANOUTS REQUIRED BY SECTION |
| | 1101.8. (ALSO SHOW CLEANOUTS ON SHT P1-105). |
| | 106.3.5.1.3(7)(13). |
| | ****RESPONSE NOTED, BUT THE SQUARE FOOTAGE AS IT |
| | ACCUMULATES IN THE SYSTEM IS NOT INDICATED. |
| | ******RESPONSE NOTED, BUT THE SQUARE FOOTAGE AS IT |
| | ACCUMULATES IN THE SYSTEM IS STILL NOT INDICATED ON THE |
| | RISER DIAGRAM. ALSO PER TABLE 1106.3, MINIMUM 6" PIPE |
| | IS REQUIRED FOR 1625SF @ 1/8"/FT. |
| | |
| | 36. OK |
| | 37. OK |
| | |
| | 38. SHT P4-101 PACKAGED WATER HEATER-STORAGE |
| | RECIRCULATION SYSTEM GWH-1. THE COLD WATER SUPPLY TURNS |
| | INTO HOT WATER SUPPLY AFTER THE DROP. PLEASE CLARIFY. |
| | --THE COLD WATER SUPPLY IS SHOWN TO THE STORAGE TANK. |
| | PLEASE EXPLAIN.--HOT & COLD INLETS TO THE STORAGE |
| | TANK? CLARIFY. SECTION 106.1.1.--A VACUUM RELIEF |
| | VALVE IS REQUIRED FOR ALL BOTTOM FED WATER HEATERS. |
| | SECTION 504.2.--THE FLOOR DRAIN IS NOT AN APPROVED |
| | INDIRECT WASTE RECEPTOR. A FLOOR SINK OR A HUB DRAIN IS |
| | REQUIRED. SECTIONS 802.3 & 802.3.2. |
| | ****RESPONSE NOTED, BUT NO CLARIFICATION OF HOW THE |
| | COLD WATER SUPPLY TURNS INTO THE HOT WATER SUPPLY. |
| | ******RESPONSE NOTED, BUT THE COLD WATER IS STILL SHOWN |
| | AS COLD WATER TO THE WATER HEATER, BUT HOT WATER TO THE |
| | STORAGE TANK. ALSO THE PUMP IS INDICATED AS PUMPING THE |
| | HOT WATER FROM THE STORAGE TANK AND INTO THE HOT WATER |
| | HEATER. PLEASE SHOW THE PUMP AS PUMPING FROM THE WATER |
| | HEATER AND INTO THE STORAGE TANK AND INDICATE DIRECTION |
| | OF FLOW.--THE MANUF. PIPING DIAGRAM STATES "THIS |
| | ILLUSTRATION IS FOR CONCEPT ONLY AND SHOULD NOT BE USED |
| | FOR ACTUAL INSTALLATION WITHOUT ENGINEERING OR |
| | TECHNICAL ADVICE FROM A LICENSED ENGINEER." |
| | |
| | 39. OK |
| | |
| | |
| | **********NEW COMMENT********** |
| | |
| | 1B. OK |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE |
| | THE REVISION & REMOVE & REPLACE ANY |
| | PAGES AS NECESSARY. A TRANSMITTAL LETTER |
| | LISTING THE ORIGINAL REVIEW COMMENT NUMBER, |
| | WITH A DESCRIPTION OF THE REVISION MADE, IDENTIFYING |
| | THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND |
| | WILL HELP TO EXPEDITE YOUR PERMIT. REMOVE |
| | ALL VOID SHEETS FROM ALL PLANS AND PLACE |
| | ONE SET OF THEM LOOSELY ON TOP OF THE |
| | COLLATED PLANS TO BE REVIEWED. |
| | THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | ****NO RESPONSE FOR THE REQUEST TO SUBMIT ONE SET OF |
| | OLD/VOID SHEETS TO HELP EXPEDITE THE REVIEW PROCESS. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |