2008-02-07 20:07:482008-02-07 20:07:48
  
 *** DENIED 2ND REVIEW***
  
  
 NEW GRACE PAVILION
 PEGGY ADAMS ANIMAL RESCUE LEAGUE.
  
 *** PLEASE SEE THERE ARE ITEMS FROM PREVIOUS REVIEW
 WHICH ARE STILL IN NEED OF ADDRESSING. PLEASE ALSO SEE
 THERE ARE ALSO NEW NOTES DUE TO CHANGES, NEW ITEMS OR
 NOTES BASED ON NEW DOCUMENTS NOT PREVIOUSLY SUBMITTED,
 ** AS MENTIONED ON PREVIOUS REVIEW ALL ITEMS COULD NOT
 BE REVIEWED AND THERE MAY BE NEW COMMENTS WHICH COULD
 NOT HAVE BEEN MADE.
  
 1) NOTE: PLEASE SEE PREVIOUS REVIEW NOTES WHICH
 MENTIONED TO SEE CODE REFLECTED ON PLANS NEED TO BE
 CHANGED TO THE CURRENT CODE IN WHICH THE PROJECT WAS
 UNDER FOR DESIGN. A COUPLE OF EXAMPLES WERE GIVEN AND
 STILL NEED TO ADDRESS THESE.
 PLEASE SEE WITH THE EXCEPTION OF THE CORRECTION FOR
 CODES REFLECTED ON THE BOTTOM OF PANEL P1-S2, ALL OTHER
 PANELS STILL SHOW CODE FROM THE 1999 NFPA-70. PLEASE
 SEE THIS SAME CODE 220.13 IS STILL ALSO BEING REFLECTED
 ON THE PANEL P4 EVEN AS THIS DOES NOT APPLY TO THIS
 RESIDENTIAL UNIT. PLEASE ADJUST.
 PLEASE SHEET E-301 OCTAGONAL NOTE #6 WHICH REFLECTS
 250.81C WHICH IS FROM THE 1996 NFPA-70. PLEASE BE SURE
 TO GO OVER PLANS AND ADJUST ANY CODE REFERENCED. FBC
 106.1.2 FOR COORDINATION.
  
 2) NOTE: PLEASE CLARIFY WHY THE RESPONSE NOTES CONTAIN
 A BOOKLET FOR CAPRI ENGINEERING IN THE MIDDLE OF NOTES
 SHOWING PROJECTS ETC. IF THIS PROJECT IS BEING
 SUBMITTED AS PRIVATE PROVIDER PLEASE FOLLOW
 REQUIREMENTS OF FS 553.791. AS THIS PROJECT HAS NOT
 BEEN SUBMITTED PREVIOUSLY UNDER FS 553.791 WITH ALL
 DOCUMENTS REQUIRED IT IS UNCLEAR WHY OTHER DOCUMENTS
 WERE SUBMITTED.
 PLEASE ALSO VERIFY CURRENT DOCUMENTS FROM CAPRI
 ENGINEERING AS THESE MAY BE UPDATED.
  
 3) NOTE: PLEASE BE SURE TO MAKE SURE ADDRESSING ON ALL
 DOCUMENTS SUBMITTED IS REFLECTED TO THE NEW ADDRESS
 ASSIGNED BY THE ADDRESSING REVIEWER.
 PLEASE SEE FOR EXAMPLE: PLANS SHOW 3100, PERMIT
 APPLICATION SHOWS 3200 AND ENERGY CALCULATIONS SHOW
 3200.
 FBC ADMIN SECTION 106.1.2, 106.5
 FAC 61G1-16.004, 61G15-23.002
  
 4) NOTE: PLEASE SEE NOTES FROM OTHER TRADES FOR ANY
 REFERENCES TO THE GENERATOR, LOCATION, SCREENING ETC.
 PLEASE SUBMIT CALCULATIONS FOR BUILDING REVIEW OF SLAB
 DETAIL. PLEASE KNOW IF IN A FLOOD ZONE, THE UNIT SHALL
 BE REQUIRED TO BE A MINIMUM OF 6INCHES ABOVE GRADE.
 PLEASE SEE THE PLANS SHOW A SLAB THICKNESS OF ONLY
 4INCHES FOR THIS 1000KW GENERATOR. PLEASE KNOW THE
 INSTALLATION SHALL MEET NFPA-110CHAPTER 7 AND MINIMUM
 INSTALLATION REQUIREMENTS AS SET-FORTH BY THE GENERATOR
 MANUFACTURE.
 PLEASE BE SURE TO SEE ANY POSSIBLE COMMENTS FROM OTHER
 REVIEWERS WITH RESPECT TO THE GENERATOR ON THE OTHER
 TRADE PLANS SUCH AS ARCHITECTURAL SITE PLANS, LANDSCAPE
 ETC. THIS IS GIVEN FOR INFORMATION ONLY BY THIS
 REVIEWER AS THIS INFORMATION WAS FORWARDED TO OTHER
 TRADES TO PLACE IN COMMENTS AS APPLICABLE.
 PLEASE SUBMIT THE MANUFACTURE SPECS/CUT SHEETS ON THIS
 UNIT AND FUEL TANK. THE FUEL TANK WILL BE REVIEWED BY
 MECHANICAL AND FIRE REVIEW AND PLEASE SEE NOTES FROM
 THOSE TRADES WITH RESPECT TO DERM STAMPS REQUIRED BASED
 ON THE SIZE OF FUEL CAPACITY.
 FBC 106.1.2
 NEC 110.3, 90.7
  
 5) NOTE: PLEASE SEE THE RISER SHOWS GFP (GROUND FAULT
 PROTECTION) ON THE GENERATOR UNIT ITSELF. IS THIS NOT
 TO READ GFS, (GROUND FAULT SENSING) OR GFA (GROUND
 FAULT ALARM) ? THE CODE REQUIRES THE GFP PROTECTION ON
 THE NORMAL SIDE OF THE SERVICE EQUIPMENT, BUT NOT ON
 THE EMERGENCY SIDE. THE CODE DOES REFERENCE GROUND
 FAULT SENSING.
 PLEASE SUBMIT THE MANUFACTURES SPECS/CUT SHEETS FOR
 THIS UNIT AS NOTED ABOVE AND FOR THE ATS DEVICE. 110.3,
 90.7
 FBC 106.1.2 FOR ADDITIONAL INFORMATION.
 THE RISER STATES TO SEE SPECS FOR THE ATS YET COULD NOT
 LOCATE ANY SUBMITTED IN PACKAGE.
  
 6) NOTE: PLEASE SEE THE RISER HAS THIS GENERATOR AS A
 SEPARATELY DERIVED UNIT WHICH IS CODE COMPLIANT AND
 CORRECT HOWEVER PLEASE SEE THE RISER DOES NOT SHOW ANY
 GROUNDING ELECTRODE SYSTEM FOR THIS UNIT. PLEASE SEE
 250.20, 250.30, 250.50.
 PLEASE SEE NFPA-110 6.2.1.5
  
 7) NOTE: PLEASE SEE THE RAISED SEAL FROM THE ENGINEER
 ON THE SEVERAL SHEETS AND SUPPORTING DOCUMENTS ARE ONCE
 AGAIN FAINT ON MANY SHEETS WHERE THE LICENSE
 INFORMATION CAN NOT BE SEEN. THIS WAS A COMMENT ON
 PREVIOUS REVIEW AND RESPONSE WAS THIS WILL BE
 ADDRESSED. MOST SHEETS ARE OK, HOWEVER SOME ARE STILL
 NOT READABLE. PLEASE SEE ENERGY CALCULATIONS FOR
 EXAMPLE AS ONE OF THE SETS COULD NOT BE READ. PLEASE
 SEE FAC 61G15-23.001 WHICH REQUIRES ALL INFORMATION TO
 BE CLEAR AND VISIBLE.
  
 8) NOTE: PLEASE SUBMIT COMPLETE ENERGY CALCULATIONS FOR
 REVIEW AND BE SURE TO COORDINATE ALL INFORMATION ON THE
 INPUT DATA REPORT WITH THE LIGHTING ON PLANS AND THE
 FIXTURE LEGEND. 13-415.1.A, 13-415.1.AB, 13-415.2 THE
 INPUT DATA REPORT IN THE REST OF THIS COMMENT WILL BE
 REFLECTED AS IDR.
  
 A) ** PLEASE BE SURE TO GO THROUGH ALL ITEMS ON THE
 INTERIOR LIGHTING SHOWN ON THE IDR AND COORDINATE WITH
 PLANS. PLEASE SEE THERE ARE DIFFERENCES IN THE AMOUNT
 OF FIXTURES, THE WATTAGES/TOTALS AND THE METHOD OF
 CONTROLS.
 PLEASE SEE FOR EXAMPLE: LOBBY AREA LIGHTING ON PLANS
 DOES NOT MATCH WITH THE AMOUNT AND TYPE OF FIXTURES ON
 THE IDR.
 PLEASE SEE FOR EXAMPLE: THE METHODS OF CONTROL FOR SOME
 ARE BEING SHOWN AS *MANUAL ON/OFF* YET THE METHOD OF
 CONTROL IS AN AUTOMATED MEANS. PLEASE GO OVER ALL
 FIXTURES ON PLANS AND COORDINATE WITH THE IDR. THIS
 OFFICE CAN NOT EMPHASIZE ENOUGH THE IMPORTANCE. THE
 ENERGY CALCULATIONS SUBMITTED DATED JUNE 07 AND DEC 07
 ARE NOT CHANGED.
  
 B) ** PLEASE BE SURE TO GO OVER PLANS AND THE SQUARE
 FOOTAGE INFORMATION ON THE CALCULATIONS SUBMITTED.
 PLEASE SEE THE PERMIT APPLICATION STATES A SQ FT LESS
 THAN CALCULATIONS AND THE CALCULATIONS COVER SHEET IS
 LESS THAN THATOF THE SQ FT SHOWN ON THE ARCHITECTURAL
 PLANS.
 13-415.1.A, 13-400.3.A
  
 C) ** PLEASE BE SURE ALL INFORMATION ON PLANS FOR
 EXTERIOR LIGHTING COORDINATES WITH THE IDR AND THE
 FIXTURE LEGEND. PLEASE SEE FOR AN EXAMPLE: THE IDR FOR
 EXTERIOR LIGHTING SHOWS A TOTAL OF 24 -40WATT FIXTURES.
 HOW IS THIS POSSIBLE WHEN NOT ONLY THE PLANS SHOWS
 DOZENS MORE FIXTURES FOR EXTERIOR LIGHTING FIXTURES BUT
 THE FIXTURE WATTAGES ON PLANS ARE SUBSTANTIALLY HIGHER
 THAN THE STATED 40WATTS ON THE IDR.
 PLEASE SEE SOME OF THESE FOR EXAMPLE ARE 400W FIXTURES,
 70W, 50W ETC ETC. PLEASE SEE THE FIXTURE LEGEND FOR
 TYPES, P, D1, S-1, L, H ETC . THIS IS NOTED ONLY FOR A
 FEW.
  
 D) ** PLEASE SEE THE CLASSIFICATION OF THE EXTERIOR
 LIGHTING FIXTURES ON THE IDR MENTIONS * LIGHTING THAT
 IS SPECIFICALLY DESIGNATED AS REQUIRED BY A HEALTH OR
 LIFE SAFETY, STATUE, ORDINANCE, OR REGULATION*. PLEASE
 PROVIDE INFORMATION ON ANY OF THESE AS THERE ARE KNOWN
 STATUTES, ORDINANCES, LIFE SAFETY CODES ETC WHICH
 REQUIRES ANY OF THESE EXTERIOR LIGHT FIXTURES. PLEASE
 ADJUST DESIGNATIONS.
  
 E) ** PLEASE BE SURE THE ENERGY CALCULATIONS ARE
 SIGNED, DATED AND SEALED WITH RAISED SEAL AS NOTED
 ABOVE AND REQUIRED PER FAC 61G15-23.002, FS 471.025 AND
 FBC 13-103.1.1.1.
 PLEASE BE SURE THE OWNER AGENT IS ALSO SIGNED ON NEW
 CALCULATIONS.
  
 9) NOTE: PLEASE SUBMIT AND SHOW ALL MAXIMUM TIMES FOR
 ALL LIGHTING CONTROL DEVICES PER 13-415.1.ABC.1.1, .1.2
 AND .1.3
  
 10) NOTE: PLEASE BE SURE TO SHOW AND LABEL ALL ROOM AND
 AREA DESIGNATIONS ON PLANS. PLEASE SEE FOR EXAMPLE
 ROOMS OFF OF LOADING DOCKS/BAY AREAS WHICH DOE NOT
 CONTAIN ANY DESIGNATIONS.
 PLEASE SEE FOR EXAMPLE: THE ROOM NORTH OF STORAGE AND
 WEST OF MECHANICAL ROOM. PLEASE KNOW AS THESE ROOMS ARE
 NOT DESIGNATE * STORAGE 101* ETC THE CIRCUITING CAN NOT
 BE VERIFIED.
 FBC 106.3.5.1.2, 106.1.2 FOR COORDINATION AND
 ADDITIONAL INFORMATION.
 NEC 408.4 ETC
  
 11) NOTE: PLEASE CORRELATE ALL CIRCUITING ON PLANS WITH
 THAT OF THE PANEL SCHEDULES SUBMITTED OR TO BE
 SUBMITTED.
 PLEASE SEE SOME EXAMPLES BELOW:
  
 A) ** THE WP GFI CIRCUITED FOR THE ROOF-TOP UNITS
 INDICATE A P-78, YET NO *P* PANEL IS ON RISER OR
 SUBMITTED WITH SCHEDULES. THIS IS ASSUMED AS MISPRINT.
  
 B) **PLEASE SEE PANEL P4 WHICH CONTAINS MANY CIRCUITS
 WHICH DO NOT CORRELATE. PLANS SHOW LAUNDRY ROOM
 RECEPTACLE ON CIRCUIT 4, YET THE PANEL SCHEDULE SHOWS
 6.
  
 C) ** PLEASE SEE PLANS SHOWS WASHER ON CIRCUIT P-14,
 YET THE PANEL SCHEDULE SHOWS P-12. THIS AFFECTS THE
 DRYER AND OTHER CIRCUITS.
  
 D) ** PLEASE SEE P4-16 AS THIS IS BEDROOM ON PLANS AND
 BATH ROOM ON SCHEDULE.
  
 ** THESE ARE SOME EXAMPLES OF THE PLANS FOR ALL. PLEASE
 SEE THERE ARE OTHERS ALSO AND SOME ARE NOTED BELOW WITH
 RESPECT TO OTHER CODES AFFECTED BY MANY NOT CIRCUITED
 CORRECTLY.
 408.4, 240.4, 310.16, ETC
 FBC 106.3.5.4, 106.3.5.1.2, 106.1.2 FOR COORDINATION.
  
 12) NOTE: PLEASE SEE NFPA-70 210.11C3 WHICH REQUIRES
 DEDICATE BATH CIRCUIT(S) IN ONLY TWO SCENARIOS. PLEASE
 KNOW WHEN THE GFI IS FED IN ONE BATH ROOM AND FEEDS
 OTHER ITEMS IN THAT *SAME* BATH, IT MAY NOT FEED ANY
 OTHER ROOMS, BATHROOMS OR APPLIANCES.
 PLEASE SEE FOR EXAMPLE: THE CIRCUIT SHOWN ON PLANS FOR
 P4-18 SHOWS THE GFI BEING FED AND THEN THE PANEL
 SCHEDULE ALSO NOTES THIS AS FEEDING NOT ONLY THE
 EXHAUST FAN IN THE SAME BATHROOM WHICH IS OK, BUT THE
 PANEL SCHEDULE ALSO SHOWS THIS FEEDING EF-82 AND83
 WHICH IS NOT PERMITTED PER CODE SECTION NOTED ABOVE.
 PLEASE ALSO SEE FOR EXAMPLE: THE PANEL SCHEDULE SHOWS
 THE P4-6 AS FEEDING BATH AND LAUNDRY ROOM COMMON
 RECEPTACLE WHICH IS NOT PERMITTED. THE PLANS ACTUALLY
 SHOW THE LAUNDRY ROOM RECEPTACLE ON WITH THE BEDROOM.
  
 13) NOTE: PLEASE SEE THE PANEL SCHEDULE SHOWS PANEL P4
 WITH THREE SMALL APPLIANCE CIRCUITS YET THE LOAD
 CALCULATIONS ONLY INDICATE TWO.
 PLEASE ALSO SEE THE PLANS ARE MISSING THE THIRD CIRCUIT
 ALSO: (15).
 PLEASE SEE 210.52B1, 210.11C1, 220.52
  
 14) NOTE: PLEASE SEE COUNTER SPACE IN BETWEEN RANGE AND
 WALL TOWARDS ELECTRICAL PANEL APPEARS TO BE MISSING A
 GFI RECEPTACLE PER 210.52C1 FOR 12 INCHES OR MORE OF
 COUNTER SPACE BASED ON SCALE ON PLANS.
  
 15) NOTE: PLEASE SEE ARC FAULT PROTECTION IS NOT SHOWN
 FOR ALL OUTLETS IN THE BEDROOMS AS REQUIRED PER 210.12
 OF THE 2005 NEC>
 PLEASE KNOW THIS REQUIRES ALL RECEPTACLES, FANS, LIGHTS
 ETC
 PLEASE SEE FOR EXAMPLE: CIRCUIT # 16 DOES NOT INDICATE
 ANY DOUBLE ** ASTERISK AS NOTED ON PANEL FOR AFCI
 BREAKER.
 PLEASE ADJUST.
  
 16) NOTE: PLEASE VERIFY SOUNDING LEVELS FOR ADA
 COMPLIANCE ON PLANS PER FBC 11-4.28.2.
  
 17) NOTE: PLEASE CLARIFY THE NOTE AND LOCATIONS OF
 LIGHTING ON SHEET E-104. THE TITLE ON THIS SHEET
 MENTIONS MECHANICAL SPACE STILL YET THE RESPONSE TO ONE
 OF THE PREVIOUS COMMENTS IS THAT MECHANICAL EQUIPMENT
 IS ON ROOF.
 PLEASE SEE THE RESPONSE TO NOTE #15 STILL MENTIONS A
 MEZZANINE LEVEL HOWEVER LIGHTING CONTROLS PER FBC
 13-415.1.ABC.1.1 AND .1.2 ARE NOT LOCATED ON THIS
 SHEET.
 THERE IS A NOTE ON LIGHTING PLANS E-103 WHICH MENTIONS
 TO INDIRECT LIGHTING ABOVE. ARE THE FIXTURES ON E-104
 OPEN AND ABOVE FIRST FLOOR AREA?
 ARE THESE SEPARATE AREAS? SEE NOTES FORM OTHER TRADES.
 NO FINAL DETERMINATION CAN BE DONE AT THIS TIME.
  
 18) NOTE: PLEASE SEE THE COLOR CODING FOR THE 277/480V
 SYSTEM CONDUCTORS WILL BE REQUIRED TO BE BROWN, PURPLE,
 AND YELLOW.
 PLEASE KNOW FOR SEVERAL DECADES ALL OF PALM BEACH
 COUNTY ALONG WITH THE CITY OF WEST PALM BEACH CONTAINED
 TECHNICAL AMENDMENTS TO THE CODE FOR COLOR CODING OF
 CONDUCTORS AS NFPA-70 DOES NOT PROVIDE COLOR CODING OF
 SYSTEM VOLTAGES. AS THE TECHNICAL AMENDMENTS ARE NO
 LONGER IN EFFECT AND KEEPING WITH THE CONSISTENCY OF
 SAFE INSTALLATION PRACTICES WITHIN THE CITY THIS IS
 REQUIRED ON A LOCAL LEVEL. THE COLOR ORANGE AS STATED
 IN DIVISION SPECS IS CLEARLY REQUIRED FOR *HIGH-LEG*
 DELTA SYSTEMS IN THE NEC AND WOULD NOT APPLY FOR
 277/480V SYSTEMS.
 PLEASE ADJUST COLOR CODING AS NOTED ABOVE. PLEASE ALSO
 SEE PAGE #4 IN 16120 3.01.
 90.4
  
 19) NOTE: PLEASE CLARIFY EMERGENCY BACK UP LIGHTING.
 THE RESPONSE MENTIONS THAT HALF SHADED FIXTURES WILL BE
 BATTERY BACK UP AND DETAILS ON LIGHTING PLANS SHOW THAT
 BATTERIES ARE PART OF THE FIXTURE WIRING HOWEVER THE
 FIXTURE SCHEDULE DOES NOT CONTAIN ANY NOTES FOR BACK UP
 BALLAST/BATTERIES. PLEASE ALSO SEE THE SHADED FIXTURES
 ON THE ELECTRICAL SYMBOL LEGEND ONLY SHOWS FIXTURES
 *B*.
 PLEASE ADJUST AND COMPLETE FIXTURE LEGENDS FOR ALL NEW
 FIXTURES AS NOTED.
 LS -101 7.8, 7.9
  
 20) NOTE: **ONLY NOTED** ANY PROPOSED INSTALLED
 LIGHTNING PROTECTION SYSTEM WILL BE UNDER SEPARATE
 PLANS, PERMIT AND MOST IMPORTANTLY SHALL MEET
 NFPA-780.
  
 21) NOTE: PLEASE CLARIFY J-BOX BEING SHOWN ABOVE
 CEILINGS FOR WATER COOLERS.
 PLEASE KNOW NO CORDS ARE PERMITTED ABOVE CEILINGS FOR
 CORD AND PLUG CONNECTED UNITS.
 PLEASE KNOW THIS CAN BE REDLINED BUT WILL STILL NEED TO
 SHOW FINAL CONNECTIONS PER NEC.
 THIS CAN BE DONE AT THIS TIME OR WILL BE NEED TO BE
 REVISED AT A LATER DATE.
 400.8
 FBC 106.1.2 FOR ADDITIONAL INFORMATION.
  
 22) NOTE: PLEASE KNOW THE REQUIRED CALCULATIONS FOR
 SITE LIGHTING POLES MAY BE PART OF A *PROVISO* WHICH
 WILL REQUIRE THESE TO BE SUBMITTED BEFORE INSTALLATION.
 THIS IS GIVEN FOR INFORMATION AT THIS TIME. IF WIND
 LOAD CALCULATIONS ARE PROVIDED AT THIS TIME, THERE WILL
 BE NO NEED FOR PROVISO.
  
 23) NOTE: PLEASE SEE THERE IS A LOSS IN TRANSLATION FOR
 THE CLARIFICATION OF THE PANEL RATINGS. THE PREVIOUS
 REVIEW NOTES MENTIONED THERE WERE SEVERAL PANELS SHOWN
 AS 60AMP RATED MAIN LUG ONLY PANELS AND 30 CIRCUITS.
 THE COMMENT MENTIONED THAT THIS OFFICE WAS NOT AWARE OF
 30CIRCUIT 60AMP RATED MLO PANELS AND TO VERIFY. THE
 PLANS HAVE NOW COME BACK WITH 42CIRCUIT 60AMP RATED MLO
 PANELS.
 IF THE PANEL IS FED FROM A 60AMP BREAKER THIS WOULD NOT
 BE A 60AMP RATED MLO PANEL. IT WOULD STILL BE RATED AT
 THE AMPERAGE RATING OF THE PANEL. IE; 150A RATED, 200
 AMP RATED, 225AMP RATED MLO.
 PLEASE SUBMIT THE MANUFACTURES SPECS/CUT SHEETS FOR ANY
 60AMP RATED 42 CIRCUIT PANELS.
 110.3, 90.7.
 FBC 106.1.2 FOR ADDITIONAL INFORMATION
  
 24) NOTE: PLEASE CLARIFY THE AIC RATINGS OF ALL THE
 PANELS AND EQUIPMENT. PLEASE SEE FOR EXAMPLE THE SAME
 PANELS AS NOTED ABOVE IN NOTE #23 ARE BEING SHOWN WITH
 A 22,000 RATING. IS THIS FOR THE PANEL? THE BRANCH
 BREAKERS? OR BOTH?
 PLEASE SEE THE MSB IS SHOWN AS 42,000 AIC RATED ON
 SCHEDULE YET THE NOTES ON RISER ON SHEET E-301 MORE
 SPECIFICALLY MSB NOTES 2A INDICATES 100,000 AIC RATED
 MAIN. WHICH ONE IS THIS?
 PLEASE INDICATE THE RATINGS OF PANELS AND BRANCH
 BREAKERS AND ANY MAIN BREAKERS.
 IF THE AIC RATING IS SHOWN AS 22K, THEN THIS IS WHAT
 WILL BE REQUIRED TO BE INSTALLED.
 110.9, 110.3, 90.7
 FBC 106.1.2 FOR ADDITIONAL INFORMATION.
  
 25) NOTE: PLEASE SEE THE CEILING FANS IN THE
 RESIDENTIAL UNIT WILL REQUIRE LIGHT KITS OR OTHER MEANS
 OF TURNING ON LIGHTING IN ROOMS PER 210.70 SHALL BE
 SUPPLIED. THIS CAN BE DONE WITH SWITCHED RECEPTACLE OR
 OTHER LIGHTING MEANS. THE FIXTURE LEGEND FOR FANS
 INDICATES NO LIGHTING TO BE A PART OF THE FANS. IN FACT
 IT IS BLANK.
 LS 101 7.8
  
 26) NOTE: PLEASE KNOW AS MENTIONED ON PREVIOUS REVIEW
 AND IN MEETING HELD AFTER THE FIRST REVIEW, IF THE
 DISCONNECTING MEANS ON THE GENERATOR DOES NOT MEET THE
 *EXCEPTIONS* IN THE CODE MORE SPECIFICALLY 702.11. A
 DISCONNECT RATED FOR THE LOAD SERVED SHALL BE REQUIRED
 AT THE BUILDING PER 225.31-225.39. THIS DISCONNECT AS
 PREVIOUSLY MENTIONED DOES NOT REQUIRE OVER CURRENT
 PROTECTION. THIS ONLY REQUIRES DISCONNECT TO BE RATED
 FOR THE LOAD SERVED. THE SHUNT/BUTTON SHOWN ON RISER
 DOES NOT MEET CODE FOR THIS REQUIREMENT.
  
 27)NOTE: PLEASE SEE NOTICE TO FLORIDA STATUTES
 553.80(2)(B) IS BEING GIVEN WITH RESPECT TO REPEAT
 COMMENTS FOR CODE COMPLIANCE. THIS IS ONLY GIVEN AS A
 NOTICE AT THIS TIME.
 PLEASE KNOW THAT ONE SET OF ELECTRICAL PLANS MAY BE
 RETAINED BY THIS OFFICE ALONG WITH ONE SET OF THE
 ENERGY CALCULATIONS.
  
 28) NOTE: PLEASE CONFIRM THE LOCATION OF THE FACP WHICH
 IS NOW IN THE TELECOM ROOM.
 PLEASE BE SURE TO CONTACT THE FIRE MARSHAL AS THIS WILL
 HAVE AN AFFECT ON THE ELECTRICAL PLANS AND ANY
 RELOCATION NEEDED.
  
 ** AS THERE ARE ITEMS NOT YET SUBMITTED, OR ITEMS FROM
 OTHER TRADES WHICH MAY AFFECT PROJECT DESIGN, PLEASE
 KNOW THAT ANY CHANGES ETC WHICH ARE NOT PART OF THIS
 SUBMITTED PACKAGE COULD NOT BE REVIEWED AT THIS TIME.
  
 ** THIS OFFICE EXPRESSES THAT IF THERE ARE ANY
 COMMENTS, QUESTIONS OR CLARIFICATION NEEDED TO PLEASE
 DO NOT HESITATE IN CONTACTING THIS OFFICE.
 PLEASE SEE BELOW FOR CONTACT INFORMATION.
  
 * ** IMPORTANT**
 ONCE ALL REVIEWS ARE DONE AND PLANS ARE PICKED UP FOR
 CORRECTIONS, PLEASE BE SURE TO COMPLETELY REMOVE ALL
 OLD/VOIDED SHEETS AND ONLY INSERT NEW REVISED SHEETS
 INTO TWO COMPLETE SETS FOR REVIEW AND STAMPING. DO NOT
 LEAVE ANY OLD/VOIDED SHEETS IN SETS.
 PLEASE KNOW ONLY ONE SET OF THE OLD/VOIDED SHEETS
 SHOULD BE SUBMITTED FOR REFERENCE.
 THIS WILL HELP IN THE REVIEW PROCESS AND AVOID ANY
 DELAYS.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW II
 CONSTRUCTION SERVICES DEPT.
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]
2008-02-06 19:31:372008-02-06 19:31:37
  
 ONE SET OF PLANS AND SPECS IN ELEC FOR REVIEW.