2007-07-03 11:51:132007-07-03 11:51:13
  
 *** UNSAT ***
  
  
 NEW GRACE PAVILION
 PEGGY ADAMS ANIMAL RESCUE LEAGUE.
  
 ** PLEASE KNOW AS THERE ARE MANY ITEMS NOT YET
 SUBMITTED FOR REVIEW, WHEN PLANS AND DOCUMENTS ARE
 SUBMITTED FOR REVIEW ON THE NEXT RE-SUB THEY WILL BE
 THE FIRST TIME IN FOR REVIEW. THERE MAY BE NEW COMMENTS
 ONCE ADDITIONAL INFORMATION IS SUBMITTED.
  
  
 1) NOTE: PLEASE SEE THE SUBMITTED DOCUMENTS REQUIRE THE
 CODES TO BE STATED ON PLANS. PLEASE SEE THE FOLLOWING
 ARE REQUIRED FOR ELECTRICAL AND OTHERS WILL BE REQUIRED
 FOR OTHER TRADES. PLEASE KNOW AS OF DECEMBER 8TH, 2006
 THE STATE ADOPTED THE 2006 REVISIONS TO THE 2004 FBC.
 PLEASE SEE SOME OF THE CORRECT CODES ARE REFLECTED ON
 PLANS BUT NOT ALL. PLEASE SEE SOME PREVIOUS CODES NO
 LONGER IN EFFECT ARE STATED. PLEASE SEE SOME CODE
 SECTIONS WHICH ARE STATED ON PLANS ARE NOT FROM THE
 CURRENT NEC.
 PLEASE LIST THE FOLLOWING:
 2004 FBC W/ 2006 REVISIONS.
 2005 NFPA-70
 2003 NFPA-101
 2002 NFPA-72
 2002 NFPA-110
  
 2) NOTE: PLEASE SEE MISSING INFORMATION ON TITLE BLOCKS
 FOR THE CIVIL ENGINEERING FIRM PER FLORIDA
 ADMINISTRATIVE CODE 61G15-23.002 AND FLORIDA STATUTES
 471.023.
 PLEASE SEE THE MISSING CERTIFICATE OF AUTHORIZATION
 NUMBER.
 ** THIS IS REQUIRED FOR ALL *C* SHEETS WHETHER OR NOT
 COMMENT IS MADE BY OTHER REVIEWER(S).
  
 3) NOTE: PLEASE SEE MISSING TITLE BLOCK INFORMATION FOR
 LANDSCAPE ARCHITECTURAL FIRM AS REQUIRED PER FAC
 61G1-16.004 AND FS 481.219.
 PLEASE SEE MISSING CERTIFICATE OF AUTHORIZATION NUMBER
 ALSO KNOWN AS THE FIRM LICENSE NUMBER.
 ** PLEASE SEE THIS IS REQUIRED FOR ALL SHEETS WHETHER
 OR NOT COMMENT IS MADE BY OTHER TRADES.
  
 4) NOTE: PLEASE SEE THE ELECTRICAL SHEETS ARE MISSING
 TITLE BLOCKS FOR THE MEP FIRM AS SHOWN ON OTHER
 SHEETS.
  
 PLEASE COMPLETE THESE SHEETS WITH THE INFORMATION AS
 REQUIRED PER FAC 61G15-23.002.
  
 5) NOTE: PLEASE SEE THE RAISED SEAL FROM THE ENGINEER
 ON THE ELECTRICAL AND FP SHEETS ARE EXTREMELY FAINT.
 THE INFORMATION ON SAID SEALS ARE NOT VISIBLE OR EASILY
 READ. PLEASE SEE FAC 61G15-23.001 WHICH REQUIRES ALL
 INFORMATION TO BE CLEAR AND VISIBLE.
 ** PLEASE SEE THIS IS REQUIRED OF ALL TRADES AND FOR
 ALL SHEETS, ALTHOUGH IT IS MAINLY ON THE E AND FP
 SHEETS.
  
 6) NOTE: PLEASE SUBMIT COMPLETE ENERGY CALCULATIONS FOR
 REVIEW. PLEASE SEE FBC CHAPTER 13, 13-415.1.AB.1.1,
 13-415.1.C, AND PERFORMANCE CALCULATIONS PER 13-415.2.
 AS NO INFORMATION WAS SUBMITTED, NO REVIEW OF THESE
 COULD BE DONE.
 PLEASE BE SURE TO SEE 13-103.1.1.1 FOR SIGNED, DATED
 AND SEALED SHEETS.
 ** PLEASE CHECK WITH FLA-COM FOR LATEST VERSION AS
 EFFECTIVE DATE OF DECEMBER 8TH, 2006 WHEN THE LATEST
 CODE CHANGE WENT INTO EFFECT.
  
 7) NOTE: PLEASE INDICATE THE WORST CASE SCENARIOS FOR
 VOLTAGE DROP OF CIRCUITS FOR FEEDERS AND BRANCH
 CIRCUIT(S). 13-413.1.ABC.1
  
 8) NOTE: PLEASE SEE THERE ARE AREAS WHICH DO NOT SHOW
 ANY AUTOMATED DEVICES FOR LIGHTING CONTROLS OR SHUT
 OFFS. PLEASE SEE 13-415.1.ABC.1.1, .1.2 AND .1.3 OF THE
 2004 FBC W/2006 REVISIONS.
 PLEASE BE SURE ALL MAXIMUM TIMES ON DEVICES ARE NOTED
 AND SHOWN.
 PLEASE SEE AS THERE ARE AREAS WHICH DO NOT SHOW CONTROL
 AT THIS TIME INCLUDING UPPER LEVELS, SOME ITEMS CAN NOT
 BE REVIEWED AT THIS TIME.
  
 9) NOTE: PLEASE KNOW ALL LOW VOLTAGE SYSTEMS WILL BE
 REQUIRED TO BE UNDER SEPARATE PERMITS. THESE SUBMITTED
 PLANS MAY BE USED TO REFERENCE HOWEVER SEPARATE PERMIT
 APPLICATIONS, AND FEES WILL BE DUE FOR THAT SCOPE OF
 WORK SUCH AS LV CATV< PHONE, DATA, ETC. IF THESE ARE
 ALL DONE BY THE SAME CONTRACTOR, ALL CAN BE ON ONE
 PERMIT.
 PLEASE KNOW THAT LOW VOLTAGE PERMITS FOR FIRE ALARM
 SYSTEMS ARE SEPARATE AND REQUIRE PLANS ALONG WITH
 PERMIT APPLICATION.
 ** NO CHANGES NEED TO BE MADE TO PLANS; THIS IS BEING
 NOTED FOR INFORMATIONAL PURPOSE ONLY.
  
 10) NOTE: PLEASE SEE THE MAIN ELECTRICAL ROOM SHOWS THE
 MDF WHICH IS PART OF THE IT EQUIPMENT. PLEASE SEE THIS
 ROOM IS A HIGH VOLTAGE ELECTRICAL ROOM AND ACCESS TO
 THIS ROOM SHOULD BE LIMITED TO *QUALIFIED PERSONNEL* AS
 STATED IN THE NEC. PLEASE SEE THAT MANY TIME THIS
 EQUIPMENT ON THE MDF REQUIRES ACCESS TO OTHER THAN
 *QUALIFIED PERSONNEL*. PLEASE SEE THAT CONSIDERATION TO
 THE LOCATION OF THIS EQUIPMENT SHOULD BE TAKEN AND
 RELOCATED OR SEPARATE FROM THE MAIN ELECTRICAL ROOM AND
 EQUIPMENT.
 110.26, 110.27, 110.16, 110.18
  
 11) NOTE: PLEASE SUBMIT WIND LOAD CALCULATIONS FOR THE
 SITE LIGHTING POLES. PLEASE KNOW THESE ARE ALREADY
 STATED ON SITE PLANS MEETING THE FBC FOR WIND
 REQUIREMENTS HOWEVER THE CALCULATIONS ARE STILL NEEDED
 FOR REVIEW. THESE ARE REQUIRED TO CONTAIN THE TITLE
 BLOCKS FROM THE DESIGN PROFESSIONAL AND TO BE SIGNED,
 DATED AND SEALED.
 FBC 106.1.2
  
 12) NOTE: PLEASE CLARIFY LIGHTING FIXTURES ON PLANS.
 THE FIXTURE SCHEDULE DOES NOT INDICATE ANY BATTERY BACK
 UP LIGHT FIXTURES EVEN THOUGH MANY OF THE FIXTURES ARE
 HALF SHADED WHICH TYPICALLY STANDS FOR BATTERY BACK UP
 LIGHT FIXTURES.
 PLEASE ADJUST AND INDICATE BATTERY BACK UP FIXTURES ARE
 THE MINIMUM AMOUNT OF BATTERY BACK UP FIXTURES WILL BE
 REQUIRED TO MEET THE MINIMUM FOOT CANDLES IN EGRESS
 PATHS TO THE PUBLIC RIGHT OF WAY OUTSIDE OF THE
 BUILDING. PLEASE SEE NFPA-101 7.8 AND 7.9.
 PLEASE ALSO SEE THE MAIN ELECTRICAL ROOM WILL ALSO BE
 REQUIRED TO CONTAIN AN BATTERY BACK UP LIGHT OF SOME
 KIND.
 PLEASE SEE 700.12F FOR CIRCUITING AND 700.16.
  
 13) NOTE: PLEASE BE SURE TO STATE ALL ROOM AND AREA
 DESIGNATIONS ON PLANS AND BE SURE THESE CORRELATE WITH
 THE PANEL SCHEDULES AS SUBMITTED ON PLANS. MOST ARE
 DONE HOWEVER SOME ARE MISSING.
 FBC 106.1.2, 106.3.5.1.2
 NEC 408.4
  
 14) NOTE: PLEASE CLARIFY UPPER LEVEL PLANS FOR LIGHTING
 AND POWER. PLEASE SEE THERE ARE ELECTRICAL AND
 MECHANICAL ON PLANS HOWEVER NO CIRCUITING, NO ROOM
 DESIGNATIONS, ETC. PLEASE SEE THE SHADED AREAS ON THE
 LOWER RIGHT HAND CORNER OF PLANS ON E104 AND 204 WHICH
 INDICATES THE AREA OF THE BUILDING IN WHICH THESE AREAS
 ARE LOCATED HOWEVER THE SHADED ARE ENCOMPASSES THE
 ENTIRE BUILDING AS SHOWN. AS THESE AREAS ARE CLEAR OF
 USE, HOW AREA IS ACCESSED, CIRCUITING, LIGHTING
 CONTROLS ETC REVIEW FOR MANY ITEMS CAN NOT BE DONE AT
 THIS TIME.
 PLEASE SE FBC ADMIN SECTION 106.1.2 AND 106.3.5.1.2 FOR
 ADDITIONAL INFORMATION NEEDED.
 PLEASE SEE NEC 408.4, AND THE FOLLOWING WHICH IS TAKEN
 FROM THE NEC COMMENTARY.
  
 15) NOTE: PLEASE CLARIFY ANY ROOF-TOP GFI RECEPTACLES
 REQUIRED FOR A/C EQUIPMENT. PLEASE SEE 210.63, 210.8B3.
 AT THIS TIME THE LOCATION OF ALL EQUIPMENT IS NOT
 CERTAIN.
  
 16) NOTE: PLEASE SEE THE APARTMENT/RESIDENTIAL UNIT AS
 SHOWN ON PLANS WILL BE REQUIRED TO MEET THE NEC FOR A
 DWELLING UNIT.
 PLEASE SEE MISSING THE TWO MINIMUM REQUIRED SMALL
 APPLIANCE CIRCUITS. 210.52B1, 210.11C1, 220.52 PLEASE
 SEE THE DINGING ROOM RECEPTACLES ARE SHOWN CIRCUITED TO
 THE LIVING ROOM WHICH IS NOT PERMITTED. SAME CODE
 SECTION.
 PLEASE SEE THE MINIMUM VA FOR THESE REQUIRED CIRCUITS.
 PLEASE SEE THE MINIMUM REQUIRED FOR WASHER IS NOT
 CORRECT.210.11C2, 220.52
 PLEASE SEE THE MINIMUM FOR THE DRYER IS NOT CORRECT.
 220.54
 PLEASE SEE MISSING ARC FAULT PROTECTION PER 210.12 TO
 BE LISTED ON PANEL SCHEDULE.
 PLEASE SEE MISSING THE REQUIRED DEDICATED BATH
 CIRCUIT(S) PER 210.11C3.(THESE ARE SHOWN SHARING WITH
 OTHER DEVICES IN OTHER ROOMS AS LISTED ON PANEL
 SCHEDULE.
 PLEASE SEE MISSING GFI RECEPTACLE/PROTECTION REQUIRED
 FOR WASHING MACHINE. THIS IS NOW WITHIN 6FT OF A
 LAUNDRY TUB. IT DOES NOT MATTER IF THIS DEDICATED
 DEVICE/OUTLET UNDER THE NEW CODE. 210.8A7
 PLEASE VERIFY THE LOAD SHOWN FOR THE RANGE AS IT
 APPEARS LOW.
 PLEASE SUBMIT LOAD CALCULATIONS FOR A DWELLING FOR THIS
 PANEL.
 PLEASE SEE THE CODE SECTION AS REFLECTED TO 220.13 IS
 NOT UNDER THE 2005 NEC AND WOULD NOT APPLY.
 PLEASE SEE NEC 220, FBC 106.3.5.4
  
 17) NOTE: PLEASE SUBMIT ALL MANUFACTURES SPECS/CUT
 SHEETS FOR THE GENERATOR, ATS, SUB-BASE FUEL TANK ETC
 FOR REVIEW.
 PLEASE SEE THE MECHANICAL REVIEW AS THE PLANS WILL BE
 REQUIRED TO BE REVIEWED AND STAMPED BY DERM DUE TO THE
 SIZE OF THE TANK.
 ** PLEASE SEE THE SITE, SURVEY, CIVIL, LANDSCAPE AND
 OTHER PLANS DO NOT INDICATE ANY GENERATOR UNIT. THIS
 NOTE WILL BE FORWARDED TO OTHER TRADES AS THERE WILL BE
 COMMENTS FROM OTHER TRADES SUCH AS ELEVATION, LOCATION,
 SETBACKS, ETC.
 110.3, 90.7
 FBC 106.1.2, 106.3.5.1.2
  
 18) NOTE: PLEASE SEE THE SERVICE IS BEING SHOWN AS GFI
 PROTECTED ALONG WITH GFI PROTECTION ON THE GENERATOR?
 PLEASE SEE THE REQUIRED PROTECTION PER 230.95, 240.13
 ETC IS FOR *GFP* PROTECTION WHICH IS NOT THE SAME AS
 CLASS A GFI PROTECTION FOR PERSONNEL.
 PLEASE ADJUST THE DESIGNATION.
 PLEASE ALSO SEE THE FOLLOWING AS GFP ON THE EMERGENCY
 SECONDARY SIDE IS NOT REQUIRED AND IN FACT ON ANY
 SYSTEMS WHICH ARE CONSIDERED LEGALLY REQUIRED OR
 EMERGENCY SYSTEMS ARE NOT RECOMMENDED BY THE CODE TO
 CONTAIN SUCH PROTECTION. PLEASE KNOW BASED ON THE
 INTEREST OFLIFE SAFETY THIS AHJ WILL NOT PERMIT THIS
 AS IT CREATES THIS HAZARD TO OCCUPANTS.
 PLEASE ALSO SEE THE ATS IS BEING SHOWN AS 3-POLE AND
 NOT 4-POLE WHEN A 4-POLE SWITCH WOULD BE NEED WHEN
 THERE IS GFP PROTECTION ON THE MAIN.
 PLEASE SEE NFPA-110 6.2.15** ISOLATION OF NEUTRAL
 CONDUCTORS. PROVISIONS SHALL BE INCLUDED FOR ENSURING
 CONTINUITY, TRANSFER, AND ISOLATION OF THE PRIMARY AND
 THE EPS NEUTRAL CONDUCTORS WHEREVER THEY ARE SEPARATELY
 GROUNDED TO ACHIEVE GROUND-FAULT SENSING.
 PLEASE SEE AN ATTACHED BRIEF EXPLANATION FROM "ASCO"
 WHITE PAPER: THERE ARE NUMEROUS OTHER NOTED DOCUMENTS
 FROM MULTIPLE MANFACTURES WHICH STATE ROUGHLY THE
 SAME:
 * WHERE GROUND FAULT PROTECTION IS TRIGGERED BY THE
 CODE AND AN ALTERNATE POWER SUPPLY IS INCLUDED,
 SWITCHING OF THE NEUTRAL BECOMES NECESSARY. THE CIRCUIT
 SHOWN ABOVE ILLUSTRATES SUCH A CIRCUMSTANCE. THE
 SERVICE IS LARGER THAN 1,000 AMPS. CONSEQUENTLY, GROUND
 FAULT PROTECTION IS REQUIRED AT THE MAIN SERVICE
 DISCONNECT AT A MINIMUM. IF IT IS INSTALLED THERE AND
 THE GENERATOR NEUTRAL GROUNDING WAS THROUGH A SOLID
 CONNECTION TO THE MAIN SERVICE NEUTRAL, A GROUND FAULT
 WHEN THE GENERATOR IS FEEDING THE LOAD WILL CAUSE THE
 MAIN SERVICE DISCONNECT TO OPEN. THIS WILL NOT
 DISCONNECT THE ARCING FAULT FROM THE GENERATOR.
 COORDINATION IS THUS LOST.*
 PLEASE KNOW BASED ON THE INFORMATION FROM SEVERAL
 MANUFACTURES AND THE CODE PLEASE ADJUST AS REQUIRED.
 PLEASE ALSO SEE GENERATOR GROUNDING DETAIL WILL BE
 REQUIRED TO BE REVISED.
 PLEASE SEE 250.20, 250.30, 250.66, 240.13, 230.95,
 700.7D, 700.26
  
 19) NOTE: PLEASE INDICATE ALL TRANSFORMER GROUNDING
 ATTACHMENTS ON THE RISER AND SIZES OF CONDUCTORS.
 250.20, 250.50, 250.66, 250.58
  
 20) NOTE: PLEASE PROVIDE AN ENLARGED VIEW OF THE MAIN
 ELECTRICAL ROOM WITH EXACT SCALE FOR REVIEW OF
 ELECTRICAL EQUIPMENT.
 110.26
 FBC 106.1.2
  
 21) NOTE: PLEASE CORRELATE PLANS AND RISER FOR THE
 SIZES OF THE TRANSFORMER. PLEASE SEE RISER SHOWS 30KVA
 AND THE PLAN SHOWS 45 KVA.
 PLEASE SEE THIS MAY BE THE REASON FOR THE FOLLOWING
 COMMENT IS THE TRANSFORMER IS INDEED A 45KVA UNIT. FBC
 106.1.2 COORDINATION.
  
 22) NOTE: PLEASE SEE THE OVER CURRENT PROTECTION SHOWN
 FOR THE BREAKER TO THE 30KW TRANSFORMER ON RISER IS TOO
 HIGH AS LISTED IN THE MSB PANEL SCHEDULE AND RISER.
 PLEASE SEE 450.3 AND THE MAXIMUM OF 125%.(UNLESS
 MEETING EXCEPTION, IF SO, PLEASE PROVIDE ALL
 INFORMATION FOR THE TRANSFORMER.
  
 33) NOTE: PLEASE SEE THERE ARE SEVERAL PANELS ON RISER
 AND PANEL SCHEDULES WHICH INDICATE 60AMP MLO AND PANEL
 BEING ACTUALLY A HIGHER RATED PANEL. PLEASE KNOW IF
 PANEL HAS A 60AMP/100AMP FEED ETC AND THE PANEL IS A
 100AMP/150AMP OR 200AMP RATED PANEL PLEASE INDICATE THE
 ACTUAL PANEL RATING. THERE IS NO 60AMP RATED PANELS
 WHICH ARE 30CIRCUIT KNOWN TO THIS OFFICE.
 PLEASE SEE SEVERAL COMMENTS BELOW FOR COORDINATION OF
 PANELS, RISER, AMPERAGES, AND WHETHER OR NOT PANELS
 CONTAIN MLO OR MCB.
 FBC 106.1.2 FOR COORDINATION.
  
 34) NOTE: PLEASE SEE H3 WHICH IS SHOWN AS 60AMP MLO ON
 RISER AND SHOWN AS 400AMP MCB ON PANEL SCHEDULE. PLEASE
 CORRELATE.
 FBC 106.1.2, 106.3.5.1.2
  
 35) NOTE: PLEASE SEE PANEL P4 WHICH IS SHOWN A S 60AMP
 MLO, YET CONTAINS 30CIRCUITS.
 PLEASE CORRELATE.
 FBC 106.1.2
  
 36) NOTE: PLEASE SEE PANEL C3 WHICH IS SHOWN AS 60AMP
 MCB ON PANEL SCHEDULE AND 60AMP MLO ON RISER. PLEASE
 CORRELATE.
 FBC 106.1.2
  
 37) NOTE: PLEASE SEE PANEL C1 WHICH IS SHOWN AS 100AMP
 MCB ON RISER AND 60AMP MCB ON PANEL SCHEDULE. PLEASE
 CORRELATE.
 FBC 106.1.2
  
 38) NOTE: PLEASE SEE C2 AS THIS IS SHOWN AS 60AMP MCB
 AND MLO ON RISER.
 PLEASE CORRELATE.
 FBC 106.1.2
  
 39) NOTE: PLEASE SEE RISER INDICATES BOTH PANEL C2 AND
 C3 BEING FED FROM PANEL C1, HOWEVER PANEL C1 SCHEDULE
 DOES NOT INDICATE EITHER OF THESE TWO PANELS? PLEASE
 CORRELATE AND ADJUST LOAD CALCULATIONS ETC. THIS WILL
 AFFECT SEVERAL ITEMS.
 FBC 106.1.2, 106.3.5.1.2
 NEC 240.4, 310.16, 408.4, 215.5 ETC.
  
 40) NOTE: PLEASE SEE PANEL H2 IS SHOWN AS 150AMP MLO ON
 RISER AND 200AMP MLO ON SCHEDULE.
 PLEASE ADJUST AND CORRELATE.
 FBC 106.1.2
  
 41) NOTE: PLEASE SEE CODE SECTION NOTED BELOW ALL PANEL
 SCHEDULES WHICH INDICATES NEC 220.13? PLEASE SEE ANY
 SECTIONS OF THE NEC TO BE NOTED MUST BE FROM THE 2005
 NEC>
 PLEASE ADJUST. FBC 106.1.2
  
 42) NOTE: PLEASE SEE LOAD CALCULATIONS WILL NEED
 ADJUSTMENTS ONCE OTHER CALCULATIONS HAVE BEEN
 CORRECTED.
 PLEASE SEE THE CONTINUOUS LOADS WHICH ARE NOTED ON MANY
 OF THE PANEL SCHEDULES ARE NOT SHOWN FIGURED INTO THE
 MAIN SERVICE AND THE MSB DOES NOTE OR SHOW ANY
 CONTINUOUS LOADS AT 125%.
 215.3, 230.42, 220 ETC.
  
 43) NOTE: PLEASE KNOW PLANS WILL BE ROUTED TO
 ADDRESSING AS THIS IS A NEW BUILDING WHICH IS NOT THE
 SAME AS THE EXISTING BUILDING ON THE SAME SITE. BOTH
 BUILDINGS CAN NOT HAVE THE SAME ADDRESS.
 PLEASE ADJUST TITLE BLOCKS AS NEEDED ONCE THE ADDRESS
 HAS BEEN DETERMINED.
 FAC 61G1-16.004, 61G15-23.002.
  
 ** PLEASE SEE ONE SET OF PLANS CONTAINS MANY AREAS
 NOTED AND REDLINED IN AREAS OF NOTES.
  
 *** PLEASE KNOW AS THERE ARE SEVERAL DESIGN CHANGES
 REQUIRED AND THERE ARE NUMEROUS ITEMS ON PLANS WHICH
 ARE NOT COMPLETE THERE MAY VERY WELL BE NEW COMMENTSON
 THE FOLLOWING REVIEW.
  
 * ** IMPORTANT**
 ONCE ALL REVIEWS ARE DONE AND PLANS ARE PICKED UP FOR
 CORRECTIONS, PLEASE BE SURE TO COMPLETELY REMOVE ALL
 OLD/VOIDED SHEETS AND ONLY INSERT NEW REVISED SHEETS
 INTO TWO COMPLETE SETS FOR REVIEW AND STAMPING.DO NOT
 LEAVE ANY OLD/VOIDED SHEETS IN SETS.PLEASE KNOW ONLY
 ONE SET OF THE OLD/VOIDED SHEETS SHOULD BE SUBMITTED
 FOR REFERENCE.
 THIS WILL HELP IN THE REVIEW PROCESS AND AVOID ANY
 DELAYS.
  
 ** PLEASE BE SURE TO CALL IF THERE ARE ANY QUESTIONS OR
 COMMENTS WITH RESPECT TO THE TYPED COMMENTS ABOVE. IF
 THERE ARE ANY COMMENTS WHICH ARE NOT CLEAR IN ANY WAY,
 NOT UNDERSTOOD OR NOT TYPED IN A CLEAR MANOR, PLEASE DO
 NOT HESITATE IN CONTACTING THIS OFFICE AND THIS
 REVIEWER.
  
 ** PLEASE BE SURE TO SEE ANY COMMENTS FROM OTHER TRADES
 WHICH MAY AFFECT ELECTRICAL PLANS AND DESIGN CHANGES.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW II
 CONSTRUCTION SERVICES DEPT.
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]
  
  
  
2007-07-03 07:01:402007-02-03 07:01:40
 REVIEW CONTINUED.
2007-07-02 20:03:302007-07-02 20:03:30
 REVIEW STOPPED, REVIEW TO CONTINUE AND NOTES TO FOLLOW.
2007-07-02 18:38:372007-07-02 18:38:37
 PLANS REMOVED FROM INCOMING AND ONE ROLL IN ELEC FOR
 REVIEW. PLANS WILL BE RETURNED BACK TO INCOMING WAITING
 FOR COMM BOARD ONCE REVIEW HAS BEEN COMPLETED.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved