| Date |
Text |
| 2007-07-21 19:15:38 | DENIED |
| | REFERENCE: FBC-2004 PLUMBING |
| | FBC-2004 CHAPTER 1 |
| | FLORIDA ADMINISTRATIVE CODE |
| | FLORIDA STATUTES |
| | CITY WPB MUNICIPAL CODE |
| | |
| | 1. SHT A-0 CONSTRUCTION NOTES: BUILDING CODE ADOPTED IS |
| | THE FBC-2004 W/2005 & 2006 AMENDMENTS NOT THE STANDARD |
| | CODE AS INDICATED. PLEASE CORRECT CODE REFERENCE. |
| | SECTION 106.1.1. |
| | |
| | 2. ALL SHEETS THE ADDRESS FOR THE ENGINEER OF RECORD |
| | DOES NOT REFLECT THE ADDRESS OF RECORD ON THE FLORIDA |
| | STATE DBPR WEBSITE. PLEASE UPDATE THE DBPR WEBSITE OR |
| | THE TITLE BLOCK INFORMATION. FAC 61G15-23.002(2) & FS |
| | 471.025. |
| | |
| | 3. SHT A-9 SUBMIT MORE INFORMATION ON THE JACUZZI'S. |
| | SUBMIT THE MANUF. SPECIFICATION SHEETS. SECTION 303.4. |
| | |
| | 4. SHTS P-1 & P-14 HAVE NOT BEEN SUBMITTED, ALSO TWO |
| | DIFFERENT SHEETS DESIGNATED P-10 HAVE BEEN SUBMITTED. |
| | SINCE NO SHEET INDEX HAS BEEN SUBMITTED, I NEED A |
| | CLARIFICATION THAT NO P-1, P-14 AND TWO P-10 SHEETS ARE |
| | CORRECT. SECTION 106.1.1. PLEASE SUBMIT A SHEET INDEX |
| | TO VERIFY ALL SHEETS TO BE SUBMITTED ARE INDEED |
| | SUBMITTED. |
| | |
| | 5.A GAS DEMO PERMIT IS REQUIRED. |
| | |
| | 6. SHT P-8 IT APPEARS THAT A 2" CONDENSATE CONNECTS TO |
| | THE SANITARY BUILDING DRAIN IN THE WEST BUILDING. THIS |
| | IS NOT APPROVED. CONDENSATE SHALL DRAIN SEPARATELY FROM |
| | THE BUILDING AND SHALL CONNECT EITHER TO THE STORM |
| | DRAIN, A CATCH BASIN. OR DRAIN TO A PLANTED AREA. |
| | MUNICIPAL CODE SECTION 90-125(B)(5). |
| | |
| | 7. SHT P-8 WEST PIPING STILL SHOWS BATHTUB WHEN CHANGED |
| | TO SHOWER. PLEASE CLARIFY. SECTION 106.1.1. |
| | |
| | 8. SHT P-8 EAST BUILDING LEGEND #(6) INDICATES A 2" |
| | SANT. & VENT. PER SECTION 406.3 A MINIMUM 3" IS |
| | REQUIRED TO THE W/M.--INDICATE WHERE THE BRANCH |
| | LINES CONNECTS TO THE BUILDING DRAIN. SECTION 106.1.1. |
| | |
| | 9. SHT P-8 EAST BUILDING. HOT WATER DESIGNATION, (A), |
| | NOT SHOWN TO KITCHEN SINK, LAVS OR SHOWERS. PLEASE |
| | INDICATE DESIGNATION FORALL HOT WATER LINES. SECTION |
| | 106.1.1. |
| | |
| | 10. SHT P-8 EAST BUILDING. A FLOOR DRAIN IS REQUIRED IN |
| | THE ROOMS CONTAINING AUTOMATIC CLOTHES WASHERS. SECTION |
| | 412.4. |
| | |
| | 11. SHT P-8 HOT WATER REQUIRED TO JANITOR SINK AND TO |
| | SINK IN THE CLEANING ROOM. SECTION 607.1. |
| | |
| | 12. SHT P-8 SHOW THE EAST BUILDING DRAIN & ALL BRANCH |
| | LINES TO ALL BATHROOM GROUPS, KITCHEN SINK, MOP SINKS, |
| | CLEANING SINKS & WASH MACHINES. SECTION 106.1.1. |
| | |
| | 13. SHT P-8 APTO 3-EAST SHOW A SHOWER ON THE FLOOR |
| | PLAN, BUT IS INDICATED AS A TUB. PLEASE CLARIFY. |
| | SECTION 106.1.1. |
| | |
| | 14. SHT P-8 SHOW UNDERGROUND SANITARY PIPING TO NEW |
| | PLUMBING FIXTURES. (W/M'S, JAN SINK, CLEANING SINKS |
| | ETC.). SECTION 106.3.5.1.3(4).--SHOW THE BUILDING |
| | DRAIN LINE, INDICATE WHERE IT EXITS THE BUILDING & SHOW |
| | WHERE & HOW ALL STACKS, FIXTURE GROUPS, NEW FIXTURES |
| | ETC. CONNECT TO THE BUILDING DRAIN. SECTION 704. |
| | |
| | 15. SHT P-9 FLOOR DRAIN REQUIRED IN THE LAUNDRY ROOMS. |
| | SECTION 412.4. |
| | |
| | 16. SHT P-9 NO #2 IN A SQUARE BOX IS INDICATED ON THE |
| | EAST BLDG. LEGEND & NOTES, BUT IS SHOWN AT AHU-1. |
| | PLEASE CORRELATE. SECTION 106.1.1. |
| | |
| | 17. SHT P-9 APTO 9-EAST SHOWS A SHOWER ON THE FLOOR |
| | PLAN, BUT IS INDICATED AS A TUB. PLEASE CLARIFY. |
| | SECTION 106.1.1. |
| | |
| | 18. SHT P-9 INDICATE USE OF SINK IN THE CLEANING ROOM. |
| | SER SECTION 607.1 IF THE SINK IS USED FOR CLEANSING OR |
| | BUILDING MAINTENANCE, HOT WATER IS REQUIRED. PLEASE |
| | CLARIFY. SECTION 106.1.1. |
| | |
| | 19. SHT P-9 FLOOR DRAINS ARE REQUIRED IN THE LAUNDRY |
| | ROOMS. IT APPEARS THAT THE FLOOR DRAIN IN THE WEST |
| | BUILDING HAS BEEN CHANGED TO A MOP SINK. SECTION |
| | 412.4. |
| | |
| | 20. SHT P-10 INDICATE USE OF SINK IN THE CLEANING ROOM. |
| | SER SECTION 607.1 IF THE SINK IS USED FOR CLEANSING OR |
| | BUILDING MAINTENANCE, HOT WATER IS REQUIRED. PLEASE |
| | CLARIFY. SECTION 106.1.1. |
| | |
| | 21. SHT P-10 FLOOR DRAINS ARE REQUIRED IN THE LAUNDRY |
| | ROOMS. IT APPEARS THAT THE FLOOR DRAIN IN THE WEST |
| | BUILDING HAS BEEN CHANGED TO A MOP SINK. SECTION |
| | 412.4. |
| | |
| | 22. SHT P-10 APTO 16 EAST SHOW A SHOWER ON THE FLOOR |
| | PLAN, BUT IS INDICATED AS A TUB. PLEASE CLARIFY. |
| | SECTION 106.1.1. |
| | |
| | 23. 2ND SHT P-10 INDICATES TYPICAL UNITS AT EAST |
| | BUILDING, BUT UNITS 1,7,14 & 21 EAST BUILDING UNITS ARE |
| | NOT TYPICAL OF THIS FLOOR PLAN. ALSO 5TH FLOOR SHOWS |
| | TUBS AND THE TYPICAL SHOWS SHOWERS. PLEASE CLARIFY. |
| | SECTION 106.1.1. |
| | |
| | 24. 2ND SHT P-10 PLEASE IDENTIFY THE NEW SANITARY |
| | ISOMETRIC RISER DIAGRAMS. IS THE NEW 2" RISER(8FU) FOR |
| | THE KITCHEN IN THE WEST BUILDING? IF SO INDICATE ON THE |
| | FLOOR PLAN WHERE THE VENT IS RUN ON THE TYPICAL UNIT |
| | FLOOR PLAN. WHERE IS THE RISERS FOR THE NEW LAUNDRY |
| | ROOMS, (2 ON 1ST FLOOR), (EAST) & NEW CLEANING ROOMS, |
| | (EAST? PLEASE CLARIFY. SECTION 106.1.1. |
| | |
| | 25. 2ND SHT P-10 ONE NEW SANITARY ISOMETRIC SHOWS A |
| | HORIZONTAL DRY VENT.PER SECTIONS 905.3 & 905.4 THIS |
| | IN NOT APPROVED. |
| | |
| | 26. 2ND SHT P-10SUBMIT A SANT RISER ISOMETRIC AND A |
| | WATER RISER ISOMETRIC FOR NEW UNIT IN THE WEST |
| | BUILDING. SHOW ALL PIPE SIZES, TRAPS AND VENTS FOR THE |
| | SANT. AND ALL PIPE SIZES, VALVES, AND REQUIRED WATER |
| | HAMMER ARRESTORS FOR THE WATER ISOMETRIC RISER DIAGRAM. |
| | SECTION 106.3.5.1.3(3)(4)(6)(10)(13). |
| | |
| | 27. 2ND SHT P-10 SUBMIT MANUF. SPECIFICATION SHEETS FOR |
| | THE TANKLESS WATER HEATERS. SHEETS SHALL SHOW LISTING. |
| | SECTION 303.4. |
| | |
| | 28. SHT P-15 IDENTIFY ALL RISERS EITHER WITH A SANT. |
| | NUMBER DESIGNATION SUCH AS S-1, S-2, S-3 ETC, OR BY |
| | BUILDING & APARTMENT NUMBER SUCH AS TYPICAL OF WEST |
| | BLDG APT0 8 & 9,OR 3 & 4 ETC. AS SHOWN I AM UNABLE TO |
| | DETERMINE WHICH RISER IS FOR WHICH UNITS. PLEASE |
| | CLARIFY. SECTION 106.1.1. |
| | |
| | 29. SHT P-16 EXISTING SANITARY RISER EAST BUILDING NOT |
| | #1 INDICATES "REWORK ALL EXISTING STACKS". PLEASE |
| | INDICATE ALL REWORKED AREAS OF EACH STACK. IDENTIFY |
| | EACH RISER PER UNIT, (APTS) OR RISER DESIGNATION. S-1, |
| | S-2 ETC. INDICATE ON THE FLOOR PLAN THE RISER |
| | DESIGNATION IF USED. SECTION 106.1.1. |
| | |
| | 30. SUBMIT NEW RISERS FOR ALL NEW FIXTURES AND SHOW THE |
| | CONNECTION OF THE RISERS TO THE BUILDING DRAIN |
| | ISOMETRIC RISER DIAGRAM. SECTION 106.1.1. |
| | |
| | 31. SHT P-17 IS INDICATED AS SHEET 16 OF 17. PLEASE |
| | CORRELATE SHEETS. SECTION 106.1.1. |
| | |
| | 32. ONE SET OF PLANS HAS SHEET E-15AFTER SHEET P-17. |
| | |
| | 33. INDICATE HOW THE JACUZZI TUBS ARE TO BE FILLED AND |
| | DRAINED. PLEASE INDICATE WHICH RISER DIAGRAMS THEY |
| | CONNECT TO. SECTION 106.1.1. |
| | |
| | 34. PLANS SEEM TO BE INCOMPLETE AT THIS TIME AND MORE |
| | COMMENTS MAY BE FORTHCOMING AT NEXT REVIEW. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |