| 2007-07-14 09:20:35 | DENIED |
| | REFERENCE: FBC-2004 FUEL GAS |
| | FBC-2004 CHAPTER 1 |
| | |
| | 1. SUBMIT A SURVEY/SITE PLAN SHOWING THE MEASUREMENTS |
| | FROM ALL PROPERTY LINES, STRUCTURES, OPENINGS IN |
| | STRUCTURES AND SHOWING COMPLIANCE WITH MANUF. |
| | INSTALLATION CLEARANCE REQUIREMENTS. SECTION 106.1.2. |
| | |
| | 2. UPON REVIEW OF "BILL OF MATERIAL" FROM CUMMINGS |
| | POWER GENERATION A BIFUEL VALVE IS INDICATED. AS SUCH |
| | PLEASE SEE REQUIREMENTS FOR FUEL GAS. |
| | |
| | A. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2004 |
| | FUEL GAS CODE. |
| | |
| | B. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| | NUMBER OF CORRUGATED STAINLESS STEEL |
| | TUBING FOR EACH PIPE SIZE IF BEING USED. |
| | |
| | C. TYPE OF GAS, (LP OR NATURAL). |
| | |
| | D. BTU LOAD OF EACH APPLIANCE AND THE |
| | TOTAL BTU LOAD ON THE SYSTEM. REFER TO |
| | THE FBC-2004 FUEL GAS CODE SECS. 401.8 |
| | THRU 402.6.1 AND TABLES 402.4(1) THRU |
| | 402.4(33). |
| | |
| | E. SHOW THE DISTANCE FROM THE POINT OF |
| | DELIVERY, (METER), TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| | FBC-2004 FUEL GAS CODE APPENDIX A - USE |
| | OF CAPACITY TABLES A.3.1(4). |
| | |
| | F. SUBMIT CALCULATIONS FOR COMBUSTION |
| | AIR (IF APPLICABLE) PER FBC-2004 FUEL |
| | GAS CODE SECTION 304. |
| | |
| | G. INDICATE THE DELIVERY PRESSURE (PSI) |
| | PER FBC-2004 FUEL GAS CODE SEC. 402.2. |
| | NATURAL GAS SPECIFY .5 PSI OR 2 PSI. |
| | |
| | H. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2004 FUEL GAS CODE SEC 402.2. NO BTU LOAD IS |
| | INDICATED IN THE MANUF. SPECIFICATION SHEETS FOR THE |
| | GENERATORS. SUBMIT INFORMATION SHOWING MAXIMUM BTU LOAD |
| | AT 100%. |
| | |
| | I. CLEARLY SHOW THE LOCATION AND CAP- |
| | ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| | OR ASME), THE DISTANCE OF THE TANK FROM |
| | THE BUILDING AND ADJACENT PROPERTY LINES |
| | THE DISTANCE OF THE TANK FROM ALL SOUR- |
| | CES OF IGNITION, OTHER CONTAINERS, BUILD |
| | INGS, AND THE LOCATION OF ANY BUILDING |
| | OPENINGS BELOW THE RELIEF VALVE OF THE |
| | TANK PER NFPA 58, TABLE 3-2.2.2. |
| | |
| | J. CLEARLY INDICATE ON THE PLAN IF THE |
| | LP TANK IS ABOVE OR BELOW GROUND, AND |
| | SHOW REQUIRED PROTECTION OF THE TANK AND APPURTENANCES |
| | PER NFPA 58. IF THE TANK |
| | IS BELOW GROUND THE CONTAINER SHALL BE |
| | SECURILY ANCHORED PER NFPA 58 SECTION |
| | 3-2.2.7(H). |
| | |
| | 3. SEPARATE GAS PERMIT REQUIRED. |
| | |
| | 4. SEE COMMENT #1 FROM ELECTRICAL REVIEW AND COMMENT #3 |
| | FROM THE MECHANICAL REVIEW. THIS ISSUE TO BE ADDRESSED |
| | PRIOR TO PERMIT ISSUANCE. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE |
| | THE REVISION & REMOVE & REPLACE ANY |
| | PAGES AS NECESSARY. A TRANSMITTAL LETTER |
| | LISTING THE ORIGINAL REVIEW COMMENT NUMBER, |
| | WITH A DESCRIPTION OF THE REVISION |
| | MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND |
| | WILL HELP TO EXPEDITE YOUR PERMIT. REMOVE ALL VOID |
| | SHEETS FROM ALL PLANS AND PLACE ONE SET OF THEM LOOSELY |
| | ON TOP OF THE COLLATED PLANS TO BE REVIEWED. THANK YOU |
| | FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |