| Date |
Text |
| 2007-09-11 10:37:02 | CONSTRUCTION SERVICES DEPARTMENT |
| | 200 SECOND STREET, 3RD FLOOR, WEST PALM BEACH, |
| | FLORIDA33401 |
| | TEL:561-805-6713FAX: |
| | 561-805-6731 |
| | |
| | JAMES JOHNSTON,CBO PERMIT NO 07060182 |
| | BUILDING PLAN EXAMINERII PROJECT COOLING TOWER |
| | REPLACEMENT |
| | E-MAIL:JJOHNSTON @WPB.ORG ADDRESS 515 N. FLAGLER |
| | DRIVE |
| | CONTRACTOR AIRSTRON, INC. |
| | DATE SEPTEMBER 11, 2007 |
| | STRUCTURALPLANREVIEW (2) F.S. |
| | 713.13 NOTICE OF COMMENCEMENT TO BE FILED WITH THE |
| | CLERK OF COURT |
| | F.S.713.13 (2) IF THE WORK DESCRIBED |
| | IN THE NOTICE OF COMMENCEMENT IS NOT COMMENCED WITHIN |
| | 90 DAYS AFTER RECORDING THEREOF, SUCH NOTICE IS NULL |
| | AND VOID |
| | RESUBMIT A NEWLY RECORDED NOTICE OF COMMENCEMENT PRIOR |
| | TO PERMIT ISSUANCE. |
| | |
| | (4) SHEETS-1 PROVIDE WIND IMPORTANCE FACTOR ON DATA |
| | |
| | |
| | (5) SHEET S-2 SUBMIT DETAIL OFCOOLING TOWER WITH ALL |
| | SUPPORTS. IDENTIFY HIGHEST POINT OF |
| | |
| | TOWER FROM ROOF SLAB |
| | |
| | (6) SHEET S-1 INFORMATION ON ARBAB ENGINEERING, INC. |
| | SHEET 10 OF 25 DOES NOT MATCH |
| | |
| | SHEET S-1DRAWINGS |
| | |
| | (7) SHEET S-2 FBC 1905.1.1STRENGTH OF CONCRETE |
| | STATE DESIGN STRENGTH FOR FORMED CONCRETE COLUMN |
| | |
| | (8) SHEET S-1 PROVIDE INFORMATION STATING? |
| | MODIFICATION ? OF STUB COLUMN |
| | |
| | (9) SHEET S-2 SEE PROTECTION OF METALS AS |
| | SPECIFIED ON SHEET M-2 ?TYPICAL ROOF MOUNTED |
| | |
| | PIPING SERVICE SUPPORT INSTALLATION?PROVIDE |
| | PROTECTION FOR STRUCTURAL SUPPORTS |
| | |
| | COMPATIBLE WITH THAT SPECIFIED ON SHEET M-2. |