| 2007-06-21 09:03:11 | ***** FAILED ***** |
| | |
| | WE KNOW THAT THIS IS A PERMIT FOR A SITE PREPARATION. |
| | HOWEVER, YOU STATED IN THIS APPLICATION THAT THIS |
| | PERMIT FOR STORM DRAINAGE SYSTM, RETENTION POND TOO. |
| | BECAUSE SITE PREPARATION MAY INCLUDE POND, STORM WATER |
| | PIPES ETC., |
| | PLEASE NOTE THAT WE REVIEWED YOUR MASTER PERMIT # |
| | 07030559 FOR ENGINEERING ON 04/06/07 & FAILED, HAS NOT |
| | BEEN PASSEDYET. |
| | PLEASE PROVIDE FOLLOWING INFO FOR THIS PERMIT: |
| | |
| | 1. PLEASE SHOW STANDARDS NOTES OF CITY OF WPB ON |
| | DRAWINGSFOR SIDEWALK WIDTH , ITS SLOPE, DRIVEWAY, |
| | PARKING, HANDICAP PARKING, PAINTPER CITY CODES ETC.,, |
| | MUST MEET PER ADA,,ETC.,YOU CAN GET STANDARD NOTES OF |
| | CITY OF WPB IN A C.D. FROM 1000 45TH STREET. WE SHOULD |
| | HAVE THOSE NOTES ON YOUR DRAWINGS. |
| | 2. PLEASE SHOW ON DRAWINGSDUMPSTER & ITS ENCLOSURE |
| | DETAILS PER CITY OF WPB, &LOCATION ON DWG, LOCATION |
| | MUST BE ACCESSIBLE FOR PICKUP TRUCK. |
| | 3. FIRST FLOOR ELEVATION, CENTER LINE OF ROAD , |
| | SIDEWALK ELEVATION MUST MEET FLOOD ZONE, 5, 10, 25, 100 |
| | YEAR RAIN CRITERIA & FL BLDG CODE TO DETERMINE FIRST |
| | FLOOR ELEVATION. |
| | 4. PLEASE PROVIDE A COPY OF SFWMD PERMIT,, & GEO TECH |
| | REPORT.TO DETERMINE WATER CONDUCTIVITY FOR EXFILTRATION |
| | TRENCH IF YOU HAVE IT. |
| | 5.PLEASE PROVIDE WATER QUALITY CALCULATIONS,WE USE |
| | SFWMD CRITERIA. DETAIL OF CONTROL STRUCTURE. DO YOU |
| | KEEP ALL STORM WATER ON SITE??, OR ANY CANAL? PLEASE |
| | EXPLAIN. |
| | 6. WHAT IS THE SITE AREA, YOU ARE DEVELOPING FOR THIS |
| | PROJECT ONLY ?ALSO, WHAT IS TOTAL PERVIOUS,& IMPERVIOUS |
| | AREA FOR THIS PROJECT., DO YOU HAVE LAKE? |
| | 7. HOW YOU CONNECT TO THE STORM WATER PIPES IN YOUR |
| | SITE? ITS DETAILS.PLEASE SHOW ALL STORM WATER PIPES |
| | AROUND YOUR SITE SO, WE CANSEE THE BEST PIPE TO |
| | CONNECT WITH THE STORM WATERFROM ALL OTHER STORM |
| | WATER PIPES. PLEASE SHOW DETAIL OF THE CONTROL |
| | STRUCTURES WITH ELEVATIONS, NOTCHES, BLEEDING |
| | ELEVATION, ETC DID YOU USE EXFILTRATION TRENCH ? |
| | 8. POLLUTION PREVENTION DETAILS,CLOTHES USED FOR SILT |
| | ETC., PLANS MUST SHOW SILT FENCE ALL AROUND THE SITE, |
| | YOUR PLANS DO NOT SHOW ALL AROUND AND ALL AROUND CATCH |
| | BASINS. HEIGHT OF SILT5' OR MORE. |
| | 9. WATER & SEWER PLANS MUST BE APPROVED FROM 45TH |
| | STREET (MANNY G.), UTILITY DEPT BEFORE WE APPROVED |
| | 10. ALSO PLEASE SHOW ALL CATCH BASINS NEAREST,AROUND |
| | YOUR SITE FOR STORM WATER DRAIN. |
| | 11. PLEASE APPLY FOR NOTICE OF INTENT(NOI) AT FDEP, AND |
| | PROVIDE A COPY. |
| | |
| | PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR |
| | PERMITTING PROCESS |
| | |
| | RASIK CHOKSHI805-6723 |