| Date |
Text |
| 2007-07-16 19:14:12 | 1009 BANYAN WPB WATER TREATMENT PHASE I |
| | BUILDING PLAN REVIEW |
| | PERMIT: 07050991 |
| | ADD: 1009 BANYAN BLVD |
| | CONT: CARDINAL CONTRACTORS, INC. |
| | TEL: (954)587-6653 |
| | |
| | FL BLD CODE= 2004 FLORIDA BUILDING CODE |
| | W/ 2006 FBC REVISIONS |
| | * WEST PALM BEACH AMENDMENTS |
| | |
| | REVIEW |
| | ACTION: DENIED |
| | |
| | 1)--- VERY IMPORTANT STATEMENT --- |
| | PLEASE DO NOT IGNORE! |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE & REPLACE ANY PAGES AS NECESSARY. A TRANSMITTAL |
| | LETTER LISTING THE ORIGINAL REVIEW COMMENT NUMBER, WITH |
| | A DESCRIPTION OF THE REVISION MADE, IDENTIFYING THE |
| | SHEET OR SPECIFICATION PAGE WHERE THE CHANGES CAN BE |
| | FOUND |
| | WILL HELP TO EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR |
| | ANTICIPATED COOPERATION. |
| | |
| | 2) PLEASE PROVIDE INFORMATIION ON THE NEW FERRIC SULATE |
| | STORAGE TANK. HOW MUCH OF THIS CHEMICAL WILL BE IN THE |
| | TANK? WHAT PRECAUTIONS WILL BE TAKEN FOR THIS HEALTH |
| | HAZARDOUS MATERIAL? |
| | |
| | 3) FOR THE FERRIC SULFATE TANK AND TRANSFER PUMP HOW |
| | WILL IT BE HELD IN PLACE TO RESIST THE MOMENT OF OVER |
| | TURNING? TABLE 1609.2.2, 1609, |
| | 2004 FL. BLD CODE 1603.1.4 THE |
| | FOLLOWING INFORMATION RELATED TO WIND |
| | SHALL BE SHOWN ON THE CONSTRUCTION |
| | DRAWINGS, |
| | 1)- BASIC WIND SPEED, MPH |
| | 2)- WIND IMPORTANCE FACTOR, & BUILDING |
| | CATEGORY SEE TABLE 1604.5 IMPORTANCE FACTOR OF 1.15 3)- |
| | WIND EXPOSURE |
| | 4)- INTERNAL PRESSURE COEFFICIENT, |
| | 5)- COMPONENTS & CLADDING, THE DESIGN |
| | WIND PRESSURES IN TERMS OF PSF. |
| | |
| | 4)PROVIDE ADDITIONAL INFORMATION ON THE MODIFICATION |
| | OF HAOH AND FESO4 CHEMICAL SYSTEMS IN THE CHEMICAL |
| | BUILDING. 106.1.2. |
| | |
| | 5) PROVIDE ADDITIONAL INFORMATION ON THE SOIUM |
| | HYDROXIDE, QUANITITIES TO BE STORED. SHEET C2 NOTE 9 |
| | INDICATES THAT NO SECONDARY CONTAINMENTPIPING IS TO |
| | BE USED? |
| | PROVIDE PLAN FOR IF A LINE BREAKS HOW WILL THE |
| | MATERIALS BE RETRIEVED. |
| | |
| | A THOROUGH REVIEW CAN NOT BE MADE AT THIS TIME, AS A |
| | RESULT OF THE ADDITIONAL INFORMATION REQUESTED |
| | ADDITIONAL COMMENTS MAY APPEAR THAT WERE NOT PART OF |
| | THIS REVIEW. |
| | |
| | |
| | BUILDING PLAN REVIEW II |
| | JIM WITMER C. B. O. |
| | |
| | TEL: (561)805-6715 |
| | FAX: (561)659-8026 |
| | E-MAIL: [email protected] |