| Date |
Text |
| 2007-10-04 15:38:49 | ***FAILED**** PLEASE PROVIDE THE FOLLOWING: |
| | |
| | 1. PLEASE PROVIDE A COPY OF NOTICE OF INTENT (NOI). |
| | PLEASE APPLY AT FDEP, NPDES STORMWATER SECTION FOR |
| | NOI. |
| | YOU CAN GET NOI INFO FROM |
| | WWW.DEP.STATE.FL.US/WATER/STORMWATER/NPDES/ |
| | NOTICE OF INTENT DEP FORM 62-621.300(4)(B), |
| | EFFECTIVE MAY 1, 2003 |
| | 2. PLEASE SHOW ON DRAWINGSTHE LOCATION OF DUMPSTER & |
| | ITS ENCLOSURE PER CITY OF WPB, LOCATION MUST BE |
| | ACCESSIBLE FOR PICKUP TRUCK. |
| | 3. PLEASE SHOW ON YOUR CALS HOW DID YOU DETERMINE FIRST |
| | FLOOR ELEVATION, DID YOU CONSIDER IN YOUR CALS,CENTER |
| | LINE (CROWN OF) OF ROAD , FLOOD ZONE AREA, & 5,10, 25, |
| | 100 YEAR FLOOD CRITERIATO DETERMINE THE FIRST FLOOR |
| | ELEVATION, PLEASE SHOW ALL OF THESE IN YOUR CALS. 4. |
| | MAKE SURE THESE SITE AREAS SHOWN ON DRAWINGS MUST MATCH |
| | WITH AREAS USED IN STORM WATER QUALITY CALCULATIONS. |
| | 5. PLEASE SHOW ON YOUR DRAWINGS ALL STORM WATER PIPES |
| | AROUND YOUR SITE SO.PLEASE SHOW DETAIL OF THE CONTROL |
| | STRUCTURESWITH ELEVATIONS, NOTCHES, BLEEDING |
| | ELEVATION, ETC ON DRAWINGS, DO YOU HAVE EXFILTRATION |
| | TRENCHES. PLEASE SHOW DRY DETENTION/WET DETENTION AREAS |
| | WITH 100% FILL OF STORM WATER ELEVATION? |
| | 6. ALSO PLEASE SHOW ALL CATCH BASINS NEAREST AROUND |
| | YOUR SITE EVENTHOUGH THEY ARE NOT IN YOUR SITE. |
| | 7. PLEASE PROVIDE A COPY OF NPBID(OR SFWMD) PERMIT,, A |
| | COPY OF GEO-TECH REPORT AND A LATESTEST COPY OF STORM |
| | STORM WATER QUALITY CALCULATIONS THAT YOU PROVIDED AT |
| | 45TH STREET. STORM WATER CALS MUST BE APPROVED FROM |
| | 45TH STREET, BEFORE WE APPROVE. |
| | 8. WATER & SEWER PLANS MUST BE APPROVED FROM 45TH |
| | STREET (MANNY G.), UTILITY DEPT BEFORE WE APPROVED |
| | 9. PLEASE PROVIDE LATEST COPY OF SET OF CIVIL DRAWINGS |
| | THAT WERE APPROVED AT 45TH STREET IN JUNE 2007. |
| | |
| | PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR |
| | PERMITTING PROCESS |
| | |
| | RASIK CHOKSHI805-6723 |