Date Text
2007-06-12 15:55:42**PLAN CHECK ONLY**
 NO PERMIT APPLIED FOR.
  
 -----------------DENIED---------------------
  
 FBC 2004 CODE FAMILY W/2006 REVISIONS
 FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH
  
 1. PLEASE PROVIDE ADDITIONAL INFORMATION REGARDING THE
 COOKING EQUIPMENT (OVENS) IN THE SUBWAY SPACE AND SHOW
 HOW THE REQUIREMENTS OF FBC,M 507.2.2 ARE TO BE MET.
  
 2. PG SWMP1: TRANSFER GRILL IN OFFICE IS NOT DESIGNED
 TO MEET THE EXCEPTIONS (50 SQ.IN. PER 100 CFM W/ 1"
 UNDERCUT DOOR). A FIELD TEST MAY BE REQUIRED TO VERIFY
 BALANCED RETURN IN THIS AREA UNLESS DESIGNED TO MEET
 THE EXCEPTIONS.
  
 3. ENERGY CALCULATIONS ARE TO BE SIGNED AND SEALED BY
 AN ARCHITECT OR ENGINEER. ALSO, DESIGN PROFESSIONALS
 RESPONSIBLE UNDER FLORIDA LAW FOR THE DESIGN OF
 LIGHTING, ELECTRICAL, MECHANICAL, AND PLUMBING SYSTEMS
 AND THE BUILDING SHELL, SHALL CERTIFY COMPLIANCE OF
 THOSE BUILDING SYSTEMS WITH THE CODE BY SIGNING AND
 PROVIDING THEIR PROFESSIONAL REGISTRATION NUMBER ON THE
 ENERGY CODE FORM PROVIDED AS PART OF THE PLANS AND
 SPECIFICATIONS TO THE BUILDING DEPARTMENT. FBC
 13-103.1.1.1
  
 4. ENERGY CALCULATIONS INPUT REPORT FOR THE ROOF SHOWS
 "METAL BLDG ROOF W/R-19 BATTS" IN ALL ZONES. THIS DOES
 NOT CORRESPOND WITH ARCHITECTURAL PLANS. PLEASE
 CORRECT. FBC 106.1.1
  
 5. PG.M3: DETAIL #4 SHOWS 1/4" LAG SCREWS INTO ROOF
 CURB AND RTU. LAG SCREWS ARE WOOD SCREWS. HOW WILL THEY
 BE USED TO FASTEN THE RTU AND THE BRACKET? PLEASE SHOW
 A FASTENER MORE SUITED TO THE APPLICATION. SHOW THE
 SIZE AND LENGTH OF THE FASTENER, NUMBER OF SCREWS IN
 EACH BRACKET AND THE NUMBER AND SPACING OF THE
 BRACKETS. FBC 1609
  
 6. PLEASE SHOW DETAIL FOR THE CONNECTION OF ROOFTOP
 EXHAUST FANS TO ROOF CURBS WHICH IS DESIGNED TO MEET
 MINIMUM 140 MPH WIND LOADS. FBC,M 301.13 AND FBC 1609
  
 7. PLEASE PROVIDE DOCUMENTATION FROM RTU MANUFACTURER
 SHOWING SYSTEMS LISTED ON SCHEDULE FOR 2000 CFM WILL
 NOT PRODUCE CFM IN EXCESS OF 2000 UNDER ANY CONDITIONS.
 OTHERWISE, DUCT SMOKE DETECTORS WILL BE REQUIRED PER
 FBC,M 606.1.
  
 8. PG.EFP1 NOTE #8: THE ACTUATION OF A DUCT SMOKE
 DETECTOR SHALL ACTIVATE A VISIBLE AND AUDIBLE
 SUPERVISORY SIGNAL AT A CONSTANTLY ATTENDED LOCATION
 PER FBC,M 606.4.1. THE CPU IS SHOWN ON PLAN TO BE
 LOCATED IN THE FIRE PUMP ROOM. THIS IS NOT A CONSTANTLY
 ATTENDED LOCATION. ALSO, NOTE #5 STATES THAT AN
 ANNUNCIATOR WILL BE LOCATED AT A "NORMALLY ATTENDED"
 LOCATION. THIS IS NOT THE SAME AS A CONSTANTLY ATTENDED
 LOCATION AS THE CODE REQUIRES. IN LEIU OF THIS
 REQUIREMENT, 606.4.1 EXCEPTION 1 MAY BE USED, WHICH
 STATES: THE SUPERVISORY SIGNAL AT A CONSTANTLY ATTENDED
 LOCATION IS NOT REQUIRED WHERE THE DUCT SMOKE DETECTOR
 ACTIVATES THE BUILDING'S ALARM-INDICATING APPLIANCES.
  
 9. SCF1 IN GARDEN CENTER IS A SUPPLY AIR SYSTEM IN
 EXCESS OF 2000 CFM AND AS SUCH A DUCT SMOKE DETECTOR IS
 REQUIRED PER FBC,M 606.1.
  
 10. PG.M3 RTU AND AHU SCHEDULES: PLEASE DESIGN OUTDOOR
 AIR VENTILATION TO ASHRAE 62.1-2004 AND REFERENCE THIS
 EDITION IN THE SCHEDULES. THIS IS THE CURRENT REFERENCE
 STANDARD PER FBC,M CH.15.
  
 11. PG.GM1: PLEASE PROVIDE LISTED GREASE DUCT SPECS AND
 INSTALLATION INSTRUCTIONS. FBC 106.1.2.
  
 12. PG.GM1 EXHAUST HOOD SCHEDULE NOTE #6: PLEASE
 INDICATE WHICH UNITS ARE TO BE SHUT DOWN IN THE EVENT
 OF THE ACTIVATION OF THE ANSUL SYSTEM. RTU1 AND RTU2
 ONLY PROVIDE 1200 CFM OF MAKE-UP AIR. THE REMAINDER OF
 MAKE-UP AIR, APPROXIMATELY 3000 CFM IS COMING FROM
 OTHER AREAS OF THE STORE. WILL ALL AHUS AND RTUS SHUT
 DOWN IN THE EVENT OF AN ALARM?
  
 13. PG.GM1: WHAT IS THE HEIGHT OF THE COOKING SURFACE
 OF THE EQUIPMENT UNDER THE KITCHEN HOODS? PLAN
 INDICATES BOTTOM HEIGHT OF HOODS AT 90". THE VERTICAL
 DISTANCE BETWEEN THE LOWER LIP OF THE HOOD AND THE
 COOKING SURFACE SHALL NOT EXCEED 48" PER FBC,M 507.12.
 PG.GA3 SHOWS "ROTISSERIE" HOOD AT 7'0", BUT GIVES NO
 HEIGHT FOR "FRYER" HOOD. PLEASE CLARIFY PER FBC
 106.1.1
  
 14. R1 DETAIL 7: WHERE ROOFING MATERIALS EXTEND BENEATH
 MECHANICAL UNITS, EQUIPMENT SUPPORTS SHALL PROVIDE A
 MINIMUM CLEARANCE HEIGHT ABOVE THE ROOF SURFACE
 (FINISHED ROOF) IN ACCORDANCE WITH FBC TABLE 1509.7.
 DETAILS 5 AND 6 ON PG.S4.1 SHOW B.O.S. ELEVATIONS WHICH
 ARE NOT ADEQUATE BASED ON THE WIDTH OF THE EQUIPMENT AS
 SHOWN ON PG.R5. ALSO, THE DETAILS ON S4.1 SHOW
 ELEVATIONS FROM T.O.D. AND NOT FROM FINISHED ROOF.
  
 15. A FULL PACKAGE OF SUBMITTALS FOR ALL LISTED
 EQUIPMENT AND MATERIALS WILL BE REQUIRED FOR
 PERMITTING. FBC 106.3.5.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT:
  
 RONALD J REGUEIRO
 561.805.6719
 [email protected]