| 2007-07-27 12:39:33 | BUILDING REVIEW SECOND CHECKLIST: |
| | 1- ENERGY CALCULATIONS SUBMITTED NEED TO BE REVISED: |
| | CORRECT ENERGY CALCULATIONSFORMS NEED TO BE SUBMITTED |
| | TO THE BUILDING DEPARTMENT TO DEMONSTRATE COMPLIANCE |
| | WITH THE ENERGY CODE SECTIONBEFORE A BUILDING PERMIT |
| | IS ISSUED. SEE SEC. 13-600.3.ABC.3 OF FBC 2004. |
| | A) THIS IS A NEW SINGLE FAMILY RESIDENCE, NOT AN |
| | ADDITION. |
| | B) UNDER ATTIC AREAON ITEM #10 IS WRONG.WHERE |
| | ARETHE 1507.6S.FTAKEN FROM?. SEE PLANS. |
| | C) THERE IS NOT INFORMATION GIVEN FOR THE WATER |
| | HEATER. |
| | D) CALCULATIONS SHOWN ON PAGE TWO ARE WRONG. |
| | CALCULATIONS SHOWN ON PAGE TWO DON'T MATCH PLANS. SEE |
| | PLANS FOR TOTAL NUMBER AND ORIENTATION OF OPENINGS. |
| | ALSO,OVERHANG HEIGHT IS INCORRECT. SEE ELEVATIONS. |
| | |
| | E) PERMITTING OFFICE IS CITY OF WEST PALM BEACH, NOT |
| | PALM BEACH COUNTY. |
| | F) JURISDICTION NUMBER IS 604700, NOT 601000. |
| | |
| | 2- STORM SHUTTERS: |
| | A) NEED TO PROVIDE CURRENT PRODUCT APPROVAL AS |
| | REQUIRED BY DCA RULE 9B-72.SHUTTERS DRAWINGS |
| | SUBMITTED REFER TO FL1618.THERE ARE NOT RECORDS FOR |
| | FL1618. SEE ATTACHED COPY FROM FLORIDA PRODUCT APPROVAL |
| | WEBSITE. |
| | NEED TO PROVIDE CURRENT PRODUCT APPROVAL. |
| | B) REMEMBER THAT ARCHITECT NEEDSTO REVIEW AND |
| | APPROVEIN WRITING NEW CURRENT PRODUCT APPROVAL AS |
| | REQUIRED BY SEC. 106..3.3 CITY AMENDMENTS TO FBC 2004. |
| | |
| | C) REVISE INSTALLATION SCHEDULE: |
| | (1) TAPCON SIZE1/4D X 1 1/4 TAPCONS IS NOT GOOD. IT |
| | DOESN'T MATCHANCHORTYPE HIGHLIGHTED ON SHEET 4 OF |
| | SHUTTER DRAWINGS SUBMITTED AND 1 1/4 LONG TAPCON |
| | DOESN'T MEET THE REQUIREDMINIMUM EMBEDMENT SPECIFIED |
| | ON SHEET 4. |
| | (2) SHUTTER SPAN OF 56" DOESN'T ALLOW 3" MIN. EDGE |
| | DISTANCE. REVISE SPAN SIZE AS REQUIRED. SEE OPENING |
| | SIZE, WINDOW PRODUCT APPROVAL FOR REQUIRED OPENING SIZE |
| | AND SHUTTERS DRAWINGS TO SEE HOW THE EDGE DISTANCE IS |
| | DETERMINED. |
| | (3) WHAT DOES "HB" SPECIFIED ON SHUTTER MOUNTING |
| | CONNECTION COLUMN STANDS FOR?. |
| | |
| | 3- SOIL TEST REPORT: |
| | A)SUBMITTALS FROM ENGINEERS NEED TO HAVE ENGINEER |
| | ORIGINAL, SEAL, SIGNATURE AND DATE AS REQUIRED BY |
| | CHAPTER 471 FLORIDA STATUTES. |
| | B) SOIL TEST REPORT NEEDS TO HAVE THE ENGINEERING |
| | FIRM CERTIFICATE OF AUTHORIZATION NUMBER ON EACH SHEET |
| | AS REQUIRED BY CHAPTER 471 FLORIDA STATUTEAND SEC. |
| | 61G15-23.002 OF FLORIDA ADMINISTRATIVE CODE. |
| | |
| | 4- PROVIDE COPY OF IMPACT FEES PAID RECEIPT AS |
| | REQUESTED ON PREVIOUS CHECKLIST. |
| | |
| | 5- NOTICE OF COMMENCEMENT IS EXPIRED AFTER 90 DAYS IF |
| | WORK IS NOT STARTED.SEC. 713.13 FLORIDA STATUTE. NEED |
| | TO PROVIDE RE-RECORDED NOTICE OF COMMENCEMENT. |
| | |
| | 6-FROM PREVIOUS CHECKLIST: OWES $599.62 FOR UPDATED |
| | VALUATION AND RADON FEES. |
| | |
| | JULIO GOMEZ |
| | BUILDING PLANS EXAMINER |
| | (561)805-6712 |