| 2008-06-23 12:08:35 | PLAN REVIEW UNDER THE 2004 FLORIDA BUILDING CODE & |
| | REFERENCED CODES WITH 2007 REVISIONS, CITY OF WEST PALM |
| | BEACH AMENDMENTS TO CHAPTER 1 (W.P.B.), FLORIDA |
| | ADMINISTRATIVE CODE (F.A.C.), AND FLORIDA STATUTES |
| | (F.S.). |
| | |
| | REVISION TO MECHANICAL PLAN M.1. |
| | *** DENIED *** |
| | |
| | 1) NOTED IN LAST REVIEW 6-13-08 NOTE #1. ENERGY |
| | CALCULATION ON FILE ARE CALLING FOR 14 SEER (MIS-TYPED |
| | 13 SEER IN LAST REVIEW) A/C SYSTEMS, A/C SYSTEM #3 ON |
| | REVISED MECHANICAL PLAN IS A 13 SEER. PLEASE CORRECT |
| | (MAY NEED TO REVISE ENERGY CALCULATIONS) PER 2004 FBC |
| | 13-103.3. |
| | |
| | 2) NOTED IN LAST REVIEW 6-13-08 NOTE #2. A/C SYSTEMS 1 |
| | AND 2 MODEL NUMBERS ARE NOT CORRECT (SEE ATTACHED ARI |
| | CERTIFICATES). PLEASE SUBMIT ARI CERTIFICATES FOR A/C |
| | SYSTEMS ANDCORRECT EQUIPMENT SCHEDULE, PER 2004 FBC |
| | 106.3.5. |
| | |
| | 2A) IF THE ATTACHED ARI CERTIFICATE FOR SYSTEM 2 IS THE |
| | SYSTEM BEING INSTALLED PLEASE CORRECT THE SEER AND |
| | TOTAL COOLING BTU'S IN THE EQUIPMENT SCHEDULE ON |
| | MECHANICAL PLAN. |
| | |
| | 3) NOTED IN LAST REVIEW 6-13-08 NOTE #3. THE COOLING |
| | LOAD CALCULATIONS ON FILE (SEE ATTACHED COPY) ARE |
| | CALLING FOR 66,423 TOTAL COOLING BTU'S, THE REVISED |
| | MECHANICAL PLAN EQUIPMENT SCHEDULE TOTALS 89,800 TOTAL |
| | COOLING BTU'S, THE PLANS CAN ONLY CALL FOR 15% MORE |
| | TOTAL COOLING BTU'S THAN THE COOLING LOAD CALCULATIONS |
| | PER 2004 FBC 13-607.1.ABC.1.1. PLEASE CORRECT PLANS OR |
| | REVISE COOLING LOAD CALCULATIONS WITH ZONES FOR EACH |
| | SYSTEM. |
| | |
| | MECHANICAL PLAN REVIEW BY; |
| | TOM GORDON (561) 805-6729 |
| | E-MAIL; [email protected] |