| Date |
Text |
| 2007-08-30 18:16:43 | |
| | |
| | DENIED |
| | |
| | THE FOLLOWING REVIEW COMMENTS WERE NOT ADDRESSED: |
| | |
| | |
| | 1)ENGINEERS SHALL LEGIBLY INDICATE THEIR NAME, |
| | ADDRESS, AND LICENSE NUMBER ON EACH SHEET THAT BEARS |
| | THEIR SEAL PER 61G15-23.002(2) FAC |
| | |
| | 2)AN ENGINEER PRACTICING THROUGH A DULYAUTHORIZED |
| | ENGINEERING BUSINESS SHALL INDICATE THEIR NAME AND |
| | LICENSE #, AS WELL AS THE NAME,ADDRESS AND CERTIFICATE |
| | OF AUTHORIZATION #ON EACH SHEET PER |
| | 61G15-23.002 (2) FAC |
| | |
| | ********PLEASE NOTE THAT EVERY PAGE MUST CONTAIN BOTH |
| | THE ENGINEERS LICENCE NUMBER AND THE BUSINESS OR |
| | CERTIFICATE OF AUTHORIZATION NUMBER, IN ADDITION EACH |
| | PAGE SHALL BE SIGNED AND SEALED BY SAID |
| | ENGINEER********* |
| | |
| | 6)PROVIDE SEPARATION/BARRIER BETWEEN EXISTING WOOD |
| | BEAM AND NEW CONCRETE BEAM. |
| | |
| | ********WHAT IS THE METHOD OF SEPARATION THAT WILL BE |
| | USED, BUILDING PAPER, METAL, ETC PLEASE BE |
| | SPECIFIC******* |
| | |
| | NEW COMMENTS |
| | |
| | 1)ENERGY CALC'S REQUIRE CLARIFICATION PAGE 2 SHOWS |
| | CEILING INSULATION VALUE OF R19 AND PAGE 6 SHOWS R30 |
| | ALSO NO WALL TYPE IS STATED IN THE ENERGY CALC'S FOR |
| | WOOD WITH R19 (SEE PAGE 2 GABLE END) |
| | |
| | NOTE: THE GLASS BLOCK SYSTEM THAT WAS CHOSEN IS ONLY |
| | SMALL MISSILE IMPACT RATED, ALL OPENINGS WITHIN 30 FEET |
| | OF GRADE ARE REQUIRED TO BE LARGE MISSILE RATED |
| | THEREFORE SHUTTERS WILL BE REQUIRED FOR THIS OPENING |
| | |
| | A RECORDED COPY OF THE NOTICE OF |
| | COMMENCEMENT IS REQUIRED PRIOR TO |
| | A PERMIT BEING ISSUED |
| | |
| | BLDG PLAN REVIEW |
| | ADRIAN MORSE |
| | 561-805-6716 |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |