| Date |
Text |
| 2007-09-08 18:00:11 | DENIED |
| | REFERENCE: FBC-2004 PLUMBING |
| | FBC-2004 FUEL GAS |
| | FBC-2004 CHAPTER 1 |
| | CITY WPB MUNICIPAL CODE |
| | FLORIDA ADMINISTRATIVE CODE |
| | FLORIDA STATUTES |
| | |
| | ****FROM PREVIOUS REVIEW: |
| | |
| | 1. OK - APPROVAL FROM R. COMPO PRIOR TO C.O. FOR |
| | REPAIRED INTERCEPTOR. |
| | |
| | 2. OK |
| | |
| | 3. SHT 3.2A GAS RISER DIAGRAM. THE FOLLOWING |
| | INFORMATION IS REQUIRED FOR A GAS PERMIT: |
| | |
| | A. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2004 |
| | FUEL GAS CODE. |
| | - MANY PIPE SIZES ARE NOT SHOWN. SHOW PIPE SIZE UP TO & |
| | INCLUDING THE SHUT OFF VALVE. INDICATE THE GAS |
| | APPLIANCE LOCATION ON THE RISER DIAGRAM TO DETERMINE |
| | PIPE SIZES. |
| | ****RESPONSE NOTED, BUT THE SIZE OF THE SHUT OFF VALVE |
| | WAS NOT INDICATED. (SEE RED LINE VALVE SIZES AND ADD TO |
| | RISER DIAGRAM). |
| | |
| | B. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| | NUMBER OF CORRUGATED STAINLESS STEEL |
| | TUBING FOR EACH PIPE SIZE IF BEING USED. |
| | - NOT ALL PIPE SIZES SHOWN. |
| | ****RESPONSE NOTED, BUT "BLACK IRON PIPE" HAS NOT BEEN |
| | INDICATED ON PLANS. |
| | |
| | C. BTU LOAD OF EACH APPLIANCE AND THE |
| | TOTAL BTU LOAD ON THE SYSTEM. REFER TO |
| | THE FBC-2004 FUEL GAS CODE SECS. 401.8 |
| | THRU 402.6.1 AND TABLES 402.4(1) THRU |
| | 402.4(33). |
| | - THE BTU LOAD SHOWN ON THE OVEN DOES NOT REFLECT THE |
| | BTU LOAD INDICATED ON THE GAS LOAD CALCULATIONS TABLE. |
| | PLEASE CLARIFY. INDICATE THE MODEL NUMBER FOR EACH GAS |
| | SUBMITTAL. |
| | ****RESPONSE NOTED, BUT THE MODEL NUMBER WAS NOT |
| | INDICATED. I HIGHLIGHTED WHAT I BELIEVED TO BE THE |
| | MODEL, BUT ONLY BY THE BTU'S INDICATED. |
| | |
| | D. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2004 FUEL GAS CODE SEC 402.2. |
| | - THE MANUF. SHEETS FOR THE CANDY STOVE HAVE NOT BEEN |
| | SUBMITTED. |
| | ****RESPONSE NOTED, BUT NO MANUF. SPECIFICATION SHEETS |
| | FOR THE CONVECTION OVEN, 140,000 BTU'S NOR THE PASTA |
| | FRYERS 110,000 BTU'S HAVE BEEN SUBMITTED. ALSO INDICATE |
| | ON THE GAS RISER ANDON THE GAS LOAD CALCULATION |
| | SCHEDULE THE MANUF. NAME OF THE APPLIANCE TO AVOID |
| | CONFUSION. (SEE STOCK POT RANGE VS. CANDY STOVE). |
| | SECTION 106.1.1. |
| | |
| | 4. OK |
| | 5. OK |
| | 6. OK |
| | 7. OK |
| | 8. OK |
| | |
| | **********NEW COMMENTS********** |
| | |
| | 1B. SECOND SHEET 1.1A WITH THE DBPR REVIEW STAMP ON IT |
| | SHALL BE SIGNED, SEALED & DATED AND INDICATE THE SHEET |
| | WILL BE FOR DBPR REVIEW STAMP ONLY. THE TWO PAGE |
| | "SPECIFICATION WORKSHEETS" SHALL BE ATTACHED TO THE |
| | DBPR STAMPED SHEET PRIOR TO APPROVAL. PLEASE MAKE SURE |
| | WORKSHEETS ARE ATTACHED. |
| | |
| | 2B. SEE ATTACHED SHEET CONCERNING THE DESIGN |
| | PROFESSIONAL AND FS 553.80(2)(B). THIS IS GIVEN AS A |
| | NOTICE ONLY AT THIS TIME. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE |
| | THE REVISION & REMOVE & REPLACE ANY |
| | PAGES AS NECESSARY. A TRANSMITTAL LETTER |
| | LISTING THE ORIGINAL REVIEW COMMENT NUMBER, |
| | WITH A DESCRIPTION OF THE REVISION |
| | MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND |
| | WILL HELP TO EXPEDITE YOUR PERMIT. REMOVE ALL VOID |
| | SHEETS FROM ALL PLANS AND PLACE ONE SET OF THEM LOOSELY |
| | ON TOP OF THE COLLATED PLANS TO BE REVIEWED. THANK YOU |
| | FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |