Plan Review Notes
Plan Review Notes For Permit 07050385
Permit Number 07050385
Review Stop P
Sequence Number 2
Notes
Date Text
2007-09-08 18:00:11DENIED
 REFERENCE: FBC-2004 PLUMBING
 FBC-2004 FUEL GAS
 FBC-2004 CHAPTER 1
 CITY WPB MUNICIPAL CODE
 FLORIDA ADMINISTRATIVE CODE
 FLORIDA STATUTES
  
 ****FROM PREVIOUS REVIEW:
  
 1. OK - APPROVAL FROM R. COMPO PRIOR TO C.O. FOR
 REPAIRED INTERCEPTOR.
  
 2. OK
  
 3. SHT 3.2A GAS RISER DIAGRAM. THE FOLLOWING
 INFORMATION IS REQUIRED FOR A GAS PERMIT:
  
 A. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2004
 FUEL GAS CODE.
 - MANY PIPE SIZES ARE NOT SHOWN. SHOW PIPE SIZE UP TO &
 INCLUDING THE SHUT OFF VALVE. INDICATE THE GAS
 APPLIANCE LOCATION ON THE RISER DIAGRAM TO DETERMINE
 PIPE SIZES.
 ****RESPONSE NOTED, BUT THE SIZE OF THE SHUT OFF VALVE
 WAS NOT INDICATED. (SEE RED LINE VALVE SIZES AND ADD TO
 RISER DIAGRAM).
  
 B. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE IF BEING USED.
 - NOT ALL PIPE SIZES SHOWN.
 ****RESPONSE NOTED, BUT "BLACK IRON PIPE" HAS NOT BEEN
 INDICATED ON PLANS.
  
 C. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 THE FBC-2004 FUEL GAS CODE SECS. 401.8
 THRU 402.6.1 AND TABLES 402.4(1) THRU
 402.4(33).
 - THE BTU LOAD SHOWN ON THE OVEN DOES NOT REFLECT THE
 BTU LOAD INDICATED ON THE GAS LOAD CALCULATIONS TABLE.
 PLEASE CLARIFY. INDICATE THE MODEL NUMBER FOR EACH GAS
 SUBMITTAL.
 ****RESPONSE NOTED, BUT THE MODEL NUMBER WAS NOT
 INDICATED. I HIGHLIGHTED WHAT I BELIEVED TO BE THE
 MODEL, BUT ONLY BY THE BTU'S INDICATED.
  
 D. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2004 FUEL GAS CODE SEC 402.2.
 - THE MANUF. SHEETS FOR THE CANDY STOVE HAVE NOT BEEN
 SUBMITTED.
 ****RESPONSE NOTED, BUT NO MANUF. SPECIFICATION SHEETS
 FOR THE CONVECTION OVEN, 140,000 BTU'S NOR THE PASTA
 FRYERS 110,000 BTU'S HAVE BEEN SUBMITTED. ALSO INDICATE
 ON THE GAS RISER ANDON THE GAS LOAD CALCULATION
 SCHEDULE THE MANUF. NAME OF THE APPLIANCE TO AVOID
 CONFUSION. (SEE STOCK POT RANGE VS. CANDY STOVE).
 SECTION 106.1.1.
  
 4. OK
 5. OK
 6. OK
 7. OK
 8. OK
  
 **********NEW COMMENTS**********
  
 1B. SECOND SHEET 1.1A WITH THE DBPR REVIEW STAMP ON IT
 SHALL BE SIGNED, SEALED & DATED AND INDICATE THE SHEET
 WILL BE FOR DBPR REVIEW STAMP ONLY. THE TWO PAGE
 "SPECIFICATION WORKSHEETS" SHALL BE ATTACHED TO THE
 DBPR STAMPED SHEET PRIOR TO APPROVAL. PLEASE MAKE SURE
 WORKSHEETS ARE ATTACHED.
  
 2B. SEE ATTACHED SHEET CONCERNING THE DESIGN
 PROFESSIONAL AND FS 553.80(2)(B). THIS IS GIVEN AS A
 NOTICE ONLY AT THIS TIME.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE
 THE REVISION & REMOVE & REPLACE ANY
 PAGES AS NECESSARY. A TRANSMITTAL LETTER
 LISTING THE ORIGINAL REVIEW COMMENT NUMBER,
 WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND
 WILL HELP TO EXPEDITE YOUR PERMIT. REMOVE ALL VOID
 SHEETS FROM ALL PLANS AND PLACE ONE SET OF THEM LOOSELY
 ON TOP OF THE COLLATED PLANS TO BE REVIEWED. THANK YOU
 FOR YOUR ANTICIPATED COOPERATION.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 805-6731
 E-MAIL [email protected]