| Date |
Text |
| 2007-06-14 11:52:37 | 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY |
| | WITH NFPA 241. |
| | |
| | 2. PLANS INDICATE THAT THE EXISTING FIRE SPRINKLER |
| | SYSTEM IS TO BE EXTENDED INTO THIS SPACE. NO FIRE |
| | SPRINKLER PLANS PROVIDED WITH DRAWINGS. |
| | |
| | 3. EXITS SHALL BE PROVIDED DURING CONSTRUCTION RELATED |
| | ACTIVITIES. |
| | |
| | 4. PLEASE ILLUSTATE ON THE PLANS WHAT IS PRESENT BEYOND |
| | THE EXIT DOORS. (EXIT DISCHARGE LOCATIONS) |
| | |
| | 5. SEPERATE PLANS AND PERMITS REQUIRED FOR ANY HOOD, |
| | DUCT, AND FIRE SUPPRESSION SYSTEMS. |
| | |
| | 6. ALL WALK-IN COOLERS AND FREEZERS ARE TO BE FIRE |
| | SPRINKLER PROTECTED. |
| | |
| | 7. THERE DOES NOT APPEAR TO ENOUGH DIRECTIONAL EXIT |
| | SIGNS OR EMERGENCY LIGHTS DISPLAYED ON THE REFLECTED |
| | CEILING PLAN. |
| | |
| | 8. PLEASE PROVIDE FLAME SPREAD DETAILS FOR THE NEW |
| | AWNING BEING PROPOSED. |
| | |
| | 9. PLEASE EXPLAIN PURPOSE OF LCP KEYPADS SHOWN ON PAGE |
| | 2.0E. |
| | |
| | 10. PLEASE PROVIDE MORE DETAILS ON WHAT FIRE ALARM |
| | MONITORING EQUIPMENT THAT THE FIRE SPRINKLER SYSTEM |
| | WILL BE CONNECTED TO. WHERE IS IT CONNECTED AND TO |
| | WHOM. |
| | |
| | 11. PLEASE EXPLAIN PURPOSE OF HANGING BEADS. WHAT |
| | MATERIAL AND WHAT FLAME SPREAD RATING. |
| | |
| | 12. COULD LOCATE ONLY ONE FIRE EXTINGUISHER ON PAGE |
| | 1.0A. PLEASE INDICATE OTHERS. |
| | |
| | 13. PLEASE INDICATE WHAT THE CROOKED LINES ON PAGE 1.0A |
| | REPRESENT. |
| | |
| | 14. OCCUPANT LOAD WILL BE DETERMINED BY FIRE RESCUE AND |
| | WILL BE REQUIRED TO BE POSTED. |
| | |
| | 15. COULD NOT LOCATE ANY EXISTING OR NEW FIRE ALARM |
| | EQUIPMENT WITHIN SPACE. PLEASE ADVISE. |
| | |
| | 16. INFORMATION SHALL BE PROVIDED REGARDING ANY |
| | PROPOSED CANDLE USE. |
| | |
| | MIKE CARSILLO, BATTALION CHIEF OF FIRE PREVENTION |
| | 804-4709 PHONE |
| | 804-4774 FAX |