| 2007-07-06 10:17:14 | ***FAILED**** PLEASE PROVIDE THE FOLLOWING: |
| | |
| | 1.PLEASE PROVIDE LATEST REVISION OF CIVIL PLANS WHICH |
| | ZACH GAMBLE REVISED PLANS IN JUNE 2007 WHILE REVIEWING |
| | STORM WATER AT 45TH STREET. |
| | 2. PLEASE PROVIDE A LATEST COPIES OF WATER QUALITY |
| | CALCULATIONS,A COPY OF SFWMD, PERMIT, & GEO-TECH |
| | REPORT |
| | 3. PLEASE PROVODE A COPY OF NOTICE OF INTENT (NOI). |
| | PLEASE APPLY AT FDEP, NPDES STORMWATER SECTION FOR |
| | NOI. |
| | YOU CAN GET NOI INFO FROM |
| | WWW.DEP.STATE.FL.US/WATER/STORMWATER/NPDES/ |
| | NOTICE OF INTENT DEP FORM 62-621.300(4)(B), |
| | EFFECTIVE MAY 1, 2003 |
| | 4. PLEASE SHOW ON DRAWINGSDUMPSTER & ITS ENCLOSURE |
| | DETAILS PER CITY OF WPB, &LOCATION ON DWG, LOCATION |
| | MUST BE ACCESSIBLE FOR PICKUP TRUCK. |
| | 5. FIRST FLOOR ELEVATION, CENTER LINE OF ROAD , |
| | SIDEWALK ELEVATION MUST MEET FLOOD ZONE AREA, & 5,10, |
| | 25, 100 YEAR FLOOD CRITERIATO DETERMINE THE FIRST |
| | FLOOR ELEVATION, MUST MEET THESE MINIMUM REQUIREMENTS. |
| | 6. PLEASE SHOW ON DRAWINGTHE SITE AREA, YOU ARE |
| | DEVELOPING FOR THIS PROJECT . PLEASE ALSO SHOW TOTAL |
| | PERVIOUS,& IMPERVIOUS AREA FOR THIS PROJECT, |
| | LAKE,SIDEWALK, PARKING,BUILDING AREA ETC. |
| | 7. HOW DO YOU CONNECT TO THE STORM WATER PIPES IN YOUR |
| | SITE? ITS DETAILS.PLEASE SHOW ALL STORM WATER PIPES |
| | AROUND YOUR SITE SO, WE CANSEE THE LAYOUT OF STORM |
| | WATER PIPES FROM ALL OTHER STORM WATER PIPES. PLEASE |
| | SHOW DETAIL OF THE CONTROL STRUCTURES WITH ELEVATIONS, |
| | NOTCHES, BLEEDING ELEVATION, ETCAND EXFILTRATION |
| | TRENCHES. |
| | 8. WATER & SEWER PLANS MUST BE APPROVED FROM 45TH |
| | STREET (MANNY G.), UTILITY DEPT BEFORE WE APPROVED |
| | 9. ALSO PLEASE SHOW ALL CATCH BASINS NEAREST,AROUND |
| | YOUR SITE FOR STORM WATER DRAIN. |
| | |
| | PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR |
| | PERMITTING PROCESS |
| | |
| | RASIK CHOKSHI805-6723 |