| Date |
Text |
| 2008-02-13 11:20:51 | *** DENIED 2ND REVIEW *** |
| | |
| | ** PLEASE SEE SOME NOTES FROM PREVIOUS REVIEW ARE IN |
| | NEED OF ADDRESSING. |
| | |
| | 1) NOTE: PLEASE SEE NOTE # 5 WHICH REQUESTED FOR ITEMS |
| | ON PANEL *A* TO COORDINATE WITH THE LOAD CALCULATIONS. |
| | PLEASE SEE THE FOLLOWING FOR EXAMPLES WHICH DO NOT |
| | MATCH. |
| | GARAGE DOOR ON LOAD CALCULATIONS NOT ON EITHER PANEL |
| | SCHEDULE. |
| | RANGE HOOD ON LOAD CALCULATIONS NOT ON EITHER PANEL |
| | SCHEDULE. |
| | PLEASE VERIFY HOW THE BATH GFI CIRCUIT #16 IS BEING |
| | SHOWN AS NEW ON PLANS IS EXISTING ON PANEL SCHEDULE. |
| | PLEASE COORDINATE. NEC 220 |
| | FBC 106.1.2 |
| | |
| | 2) NOTE: PLEASE SEE PREVIOUS REVIEW NOTE #7 WHICH |
| | MENTIONED SOME COORDINATION ISSUES FROM INFORMATION |
| | SHOWN ON RISER COMPARED TO INFORMATION SHOWN ON PANELS. |
| | PLEASE SEE THE FOLLOWING FOR EXAMPLES: |
| | PLEASE SEE RISER WHICH STATES THE PANEL *B* AS A NEW |
| | 60AMP MCB PANEL. |
| | PLEASE SEE THE SAME PANEL *B* ON PANEL STATES THIS |
| | PANEL IS EXISTING AND IS A 50AMP MCB. |
| | WHICH ONE? |
| | PLEASE SEE THE PANEL SCHEDULE FOR *B* PANEL STATES THE |
| | LOAD HIGHER THAN THE LOAD ON PANEL *A* WHICH SHOWS THE |
| | SUB FEED FOR THE PANEL *B*. |
| | ONCE AGAIN PLEASE COORDINATE. |
| | |
| | ** IF THERE ARE ANY QUESTIONS PLEASE CALL TO GO OVER |
| | PLANS. |
| | |
| | * ** IMPORTANT** |
| | ONCE ALL REVIEWS ARE DONE AND PLANS ARE PICKED UP FOR |
| | CORRECTIONS, PLEASE BE SURE TO COMPLETELY REMOVE ALL |
| | OLD/VOIDED SHEETS AND ONLY INSERT NEW REVISED SHEETS |
| | INTO TWO COMPLETE SETS FOR REVIEW AND STAMPING. DO NOT |
| | LEAVE ANY OLD/VOIDED SHEETS IN SETS. |
| | PLEASE KNOW ONLY ONE SET OF THE OLD/VOIDED SHEETS |
| | SHOULD BE SUBMITTED FOR REFERENCE. |
| | THIS WILL HELP IN THE REVIEW PROCESS AND AVOID ANY |
| | DELAYS. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW II |
| | CONSTRUCTION SERVICES DEPT. |
| | CITY OF WEST PALM BEACH |
| | 561-805-6717 |
| | [email protected] |