| 2007-06-14 13:50:26 | FAILED FOR FOLLOWING REASONS: |
| | |
| | 1. PLEASE SHOW ON DRAWINGSDUMPSTER & ITS ENCLOSURE |
| | DETAILS PER CITY OF WPB, &LOCATION ON DWG, LOCATION |
| | MUST BE ACCESSIBLE FOR PICKUP TRUCK. |
| | 2. FIRST FLOOR ELEVATION, CENTER LINE OF ROAD , |
| | SIDEWALK ELEVATION MUST MEET FLOOD ZONE AREA, & 5,10, |
| | 25, 100 YEAR FLOOD CRITERIATO DETERMINE THE FIRST |
| | FLOOR ELEVATION, MUST MEET THESE MINIMUM REQUIREMENTS. |
| | 3. PLEASE PROVIDE A COPY OF SFWMD PERMIT,, GEO-TECH |
| | REPORT AND SHOW CALCULATION FOR LENGTH OF EXFILTRATION |
| | TRENCH, & SAFETY FACTOR YOU USED IN CALCULATION OF |
| | EXFILTRATION LENGTH. |
| | 4.PLEASE SHOW STORM WATER QUALITY CALCULATIONS, WHAT |
| | CRITERIA YOU ASSUMEDFOR RUNOFF CAL.,, LIKE 1" OVER |
| | ENTIRE SITE OR2.5"CRITERIA, ETC? |
| | 5. WHAT IS THE SITE AREA, YOU ARE DEVELOPING FOR THIS |
| | PROJECT ? ALSO, WHAT IS TOTAL PERVIOUS,& IMPERVIOUS |
| | AREA, LAKE, GREEN,BUILDING,PAVEMENT/PARKING AREA ETC. |
| | FOR THIS PROJECT. |
| | 6. HOW YOU CONNECT TO THE STORM WATER PIPES IN YOUR |
| | SITE? ITS DETAILS.PLEASE SHOW ALL STORM WATER PIPES |
| | AROUND YOUR SITE SO, WE CANSEE THE BEST PIPE TO |
| | CONNECT WITH THE STORM WATERFROM ALL OTHER STORM |
| | WATER PIPES. PLEASE SHOW DETAIL OF THE CONTROL |
| | STRUCTURES WITH ELEVATIONS, NOTCHES, BLEEDING |
| | ELEVATION, ETC DID YOU USE EXFILTRATION TRENCH ? |
| | 7. POLLUTION PREVENTION DETAILS,CLOTHES USED FOR SILT |
| | ETC LOOKS OK, BUT, YOUR PLAN MUST SHOW SILT FENCE |
| | AROUND THE SITE & CATCH BASINS. PLEASE PROVIDE SOME |
| | SYMBOL/SIGNHEIGHT OF FENCE SHOULD BE HIGH ENOUGH PER |
| | FDEP TO STOP DUST & PARTICLES. |
| | 8. PLEASE APPLY & GET AN APPROVAL FROM FDEP FOR NOTICE |
| | OF INTENT (NOI), PROVIDE A COPY OF APPROVAL FROM FDEP |
| | FOR NOI. |
| | 9. WATER & SEWER PLANS MUST BE APPROVED FROM 45TH |
| | STREET (MANNY G.), UTILITY DEPT BEFORE WE APPROVED |
| | 10. ALSO PLEASE SHOW ALL CATCH BASINS NEAREST,AROUND |
| | YOUR SITE FOR STORM WATER DRAIN. |
| | |
| | PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR |
| | PERMITTING PROCESS |
| | |
| | RASIK CHOKSHI805-6723 |