2007-05-16 15:11:58DENIED
 REFERENCE:
 ** FBC-2004 SECTION 424, SWIMMING POOLS:
 ** FBC-2004 PLUMBING:
  
 THE FOLLOWING CORRECTIONS ARE REQUIRED FOR PLUMBING
 PLAN REVIEW TO MEET CODE COMPLIANCE FOR THE SWIMMING
 POOL AND SPA:
  
 1. SHEET SP-1.06: PLEASE CORRELATE THE PIPING SUPPORT
 DETAIL WITH THE SWIMMING POOL SCHEDULE OF EQUIPMENT. IT
 APPEARS THAT THE GUTTER DRAINS, WALL RETURN FITTINGS
 AND VACUUM FITTINGS ARE MISLABELED. PLEASE CLARIFY AND
 CORRECT ON THE RESUBMITTAL.
  
 2. SHEET SP-1.07: THE POOL WASTE LINE AIR GAP DETAIL
 IS NOT CODE COMPLIANT PER FBC-2004 PLUMBING, SECTION
 802.1.4, THE SWIMMING POOL WASTEWATER SHALL DISCHARGE
 THROUGH AN INDIRECT WASTE PIPE BY MEANS OF AN AIR GAP
 AND PER FBC-2004 PLUMBING, SECTION 802.2.1 THE AIR GAP
 BETWEEN THE INDIRECT WASTE PIPE AND THE FLOOD LEVEL RIM
 OF THE WASTE RECEPTOR SHALL BE A MINIMUM OF TWICE THE
 EFFECTIVE OPENING OF THE INDIRECT WASTE. PLEASE CORRECT
 THIS ON THE RESUBMITTAL.
  
 3. SHEET SP-2.01: PLEASE CORRELATE THE FILTER PIPING
 PLAN WITH THE SPA LINE SIZES DETAIL. IT APPEARS THAT
 THE PIPING IS MISLABELED AND SIZED ON THE FILTER PIPING
 PLAN.
 NOTE: THE FOLLOWING ARE MISLABELED AND SIZED WRONG ON
 THE FILTER PIPING PLAN.
 A. THE MAIN DRAIN LINE TO SPA COLLECTOR SHOULD BE
 LABELED AS "A", PIPE SIZING IS "OK".
 B. THE SUCTION LINE TO THE SPA FILTER PUMP SHOULD BE
 LABELED AS "D", PIPE SIZING SHOULD BE CHANGED TO
 2-1/2".
 C. THE RETURN LINE FROM THE FILTER PUMP SHOULD BE
 LABELED AS "F", PIPE SIZING IS "OK".
 D. THE SKIMMER LINE SHOULD BE LABELED AS "C", PIPE
 SIZING IS OK.
 PLEASE CORRECT THIS ON THE RESUBMITTAL.
  
 4. SHEET SP-2.01: THE HYDRO JET PIPING PLAN IS
 INCORRECTLY INDICATING THE DIRECTION OF FLOW AND THE
 HYDRO JET PIPING SHOULD BE FROM THE THERAPY PUMPS NOT
 THE SPA COLLECTOR TANKS. PLEASE CLARIFY THIS ON THE
 RESUBMITTAL.
  
 5. SHEET SP-2.01 SPA EQUIPMENT PIPING ISOMETRIC:
 PLEASE CORRELATE THE SPA EQUIPMENT ISOMETRIC WITH THE
 SPA EQUIPMENT SCHEDULE ON SHEET SP-2.02. IT APPEARS
 THAT THE FILTER, FILTER PUMP AND SPA JET PUMP ARE
 MISLABELED AS BEING PRESSURE GUAGES. PLEASE CORRECT
 THIS ON THE RESUBMITTAL.
  
 6. SHEET SP-2.03: THE SPA WASTE LINE AIR GAP DETAIL IS
 NOT CODE COMPLIANT PER FBC-2004 PLUMBING, SECTION
 802.1.4, THE SPA WASTEWATER SHALL DISCHARGE THROUGH AN
 INDIRECT WASTE PIPE BY MEANS OF AN AIR GAP AND PER
 FBC-2004 PLUMBING, SECTION 802.2.1 THE AIR GAP BETWEEN
 THE INDRECT WASTE PIPE AND THE FLOOD LEVEL RIM OF THE
 WASTE RECEPTOR SHALL BE A MINIMUM OF TWICE THE
 EFFECTIVE OPENING OF THE INDIRECT WASTE.
 PLEASE CORRECT THIS ON THE RESUBMITTAL.
  
 7. THE SUBMITTED NOTICE OF COMMENCEMENT IS EXPIRED AS
 OF 5/9/07, PLEASE SUBMIT A CURRENT NOTICE OF
 COMMENCEMENT TO BE FILED WITH THE MASTER PERMIT NUMBER
 05091425.
  
 ********IMPORTANT INFORMATION********
 IN ORDER TO EXPIDITE PLAN REVIEW: WHEN RESUBMITTING,
 PLEASE REPLACE ONLY SHEETS
 WHICH HAVE CHANGED, PLEASE INCLUDE A
 TRANSMITTAL LETTER INDICATING HOW EACH
 ITEM WAS ADDRESSED AND PROVIDE ONE COPY
 OF ALL OLD/VOIDED SHEETS FOR REFERENCE
 ONLY.
 NOTE: ONLY ONE CORRECTED DRAWING
 IN RED INK FOR REFERENCE FOR
 RESUBMITTAL.
  
 END OF COMMENTS:
  
 REVIEW BY MIKE PERSON
 PLUMBING PLANS EXAMINER
 (561) 805-6730
 FAX (561) 805-6731
 E-MAIL= [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved