| 2007-09-08 12:21:26 | BUILDING PLAN REVIEW |
| | PERMIT: 07040994 |
| | ADD: 4300 NFLAGLER DR |
| | CONT: MECHANICAL INDUSTRIAL SERVICES |
| | TEL: (813)247-2868 |
| | |
| | FL BLD CODE= 2004 FLORIDA BUILDING CODE |
| | W/ 2006 FBC REVISIONS |
| | * WEST PALM BEACH AMENDMENTS |
| | |
| | 3RDREVIEW |
| | ACTION: DENIED |
| | |
| | 1)--- VERY IMPORTANT STATEMENT --- |
| | PLEASE DO NOT IGNORE! |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE |
| | THE REVISION & REMOVE & REPLACE ANY |
| | PAGES AS NECESSARY. A TRANSMITTAL LETTER |
| | LISTING THE ORIGINAL REVIEW COMMENT NUM- |
| | BER, WITH A DESCRIPTION OF THE REVISION |
| | MADE, IDENTIFYING THE SHEET OR SPECIFICA |
| | TION PAGE WHERE THE CHANGES CAN BE FOUND |
| | WILL HELP TO EXPEDITE YOUR PERMIT. THANK |
| | YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | 2-5 COMPLIED. |
| | |
| | 6A) THIRD REVIEW ,110.2* W. P. B. ADMINISTRATIVE |
| | CODE, INFORMATION THAT IS REQUIRED FOR |
| | RECORD KEEPING & FOR CERTIFICATE OF |
| | OCCUPANCY: |
| | A) THE EDITION OFTHE CODE UNDER WHICH |
| | THE PROJECT IS DESIGNED. |
| | B) THE USE AND OCCUPANCY, IN ACCORDANCE |
| | WITH THE PROVISIONS OF CHAPTER 3. |
| | C) THE TYPE OF CONSTRUCTION AS DEFINED |
| | IN CHAPTER 6, TABLE 601. |
| | D) THE OCCUPANT LOAD, SEE 1004. |
| | E) IF AN AUTOMATIC SPRINKLER SYSTEM IS |
| | PROVIDED |
| | F) WHETHER THE SPRINKLER SYSTEM IS REQUIRED. |
| | G) ANY SPECIAL STIPULATIONS & CONDITIONS |
| | OF THE BUILDING PERMIT |
| | H) FLOOD ZONE. |
| | |
| | 6B) (1) 2ND REQUEST, THE NEXT ISSUE WILL BE HOW TO |
| | CLASSIFY THE SAWDUSST THAT IS CREATED WHEN WORK IS |
| | BEING COMPLETED. THE WOOD BEFORE IT IS CUT IS A MINOR |
| | HAZARD BUT WHEN SAWDUST IS CREATED, THE SAWDUST IS VERY |
| | COMBUSTIBLE AND CREATES A HIGH HAZARD OR H-2 OCCUPANCY. |
| | TABLE 307.7(1)IS FOR THE MAXIMUM ALLOWABLE QUANITIES |
| | OF MATERIAL ALLOWED PER CONTROL AREA, THAT POSES A |
| | PHYSICAL HAZARD. WHEN YOU SCAN THE TABLE THERE IS NO |
| | CATEGORY FOR COMBUSTIBLE DUST, THERE IS FOR COMBUSTIBLE |
| | FIBERS NOT COMBUSTIBLE DUST! PLACING THE COMBUSTIBLE |
| | DUST INTO A H-2 CATEGORY. SEE 415.7 GROUP H-2 |
| | |
| | 415.7.1 COMBUSTIBLE DUSTS, GRAIN PROCESSING AND |
| | STORAGE. |
| | THE PROVISIONS OF SECTIONS 415.7.1.1 THROUGH 415.7.1.5 |
| | SHALL APPLY TO BUILDINGS IN WHICH MATERIALS THAT |
| | PRODUCE COMBUSTIBLE DUSTS ARE STORED OR HANDLED. |
| | BUILDINGS THAT STORE OR HANDLE COMBUSTIBLE DUSTS SHALL |
| | COMPLY WITH THE APPLICABLE PROVISIONS OF NFPA 61, NFPA |
| | 120, NFPA 651, NFPA 654, NFPA 655, NFPA 664 AND NFPA |
| | 85, AND THE FLORIDA FIRE PREVENTION CODE. |
| | |
| | WHEN YOU LOOK AT THE VARIOUS NFPA REQUIREMENTS ABOVE |
| | 664 IS THE STANDARD TO BE USED . NFPA 664 IS THE |
| | STANDARDFOR THE PREVENTION OF FIRE AND EXPLOSIONS IN |
| | WOOD PROCESSING FACILITIES 2007 EDITION. WE BELIEVE |
| | THAT THIS STILL CAN BE CLASSIFIED AS A F-1 FACTORY USE |
| | WITH ONE CONTROLED AREA THE WOOD SHOP AND THE DUST |
| | COLLECTION SYSTEM HAS TO TIED INTO |
| | OPERATION OF ANY EQUIPMENT THAT CREATES SAWDUST. THIS |
| | WOULDMAKE THE COLLECTION SYSTEM AND HOLDING TANK THE |
| | H-2 HAZARD ZONE. |
| | |
| | IN PREVIOUS REVIEWS A PRINTED COPY OF NFPA 664 WAS |
| | INCLUDED IN THE PLAN REVIEW. PART OF THE NFPA 664 |
| | INDICATES UNDER 4.4 THE DESIGNER BE AN ENGINEER WHO IS |
| | KNOWLEDGEABLE OF THESE SYSTEMS AND THEIR ASSOCIATED |
| | HAZARDS, WHICH THE DESIGNER STATES THAT HE TAKES NO |
| | RESPONSIBLIITY FOR THE FOLLOWING : |
| | (1)DUCT INCORPORATED SUBMITTALS PROVIDED FOR THE THE |
| | DUST HANGER DESIGN, NOR, |
| | (2) THE AMERICAN AIR FILLER SUBMITTALS PROVIDED FOR THE |
| | WIND DESIGN CALCULATIONS OF THE DUST COLLECTION SYSTEM, |
| | NOR, |
| | (3) FLAMEX INC. DRAWINGS AS PROVIDED ON SHEET 5 FOR THE |
| | SPARK DETECTION SYSTEM. |
| | |
| | 6B) (2) NFPA 6644.6 COMPLIANCE OPTIONS ARE EITHER: |
| | 4.6..2 PREFORMANCE BASED DESIGN MEETING ALL |
| | THE REQUIREMENTS OF CHAPTER 5 OR, |
| | 4.6.3 PRESRIPTIVE-BASED DESIGN MEETING THE |
| | REQUIREMENTS OF CHAPTER 6-11. |
| | PLEASE PROVIDE THE INFORMATION REQUIRED FOR EITHER |
| | METHOD. |
| | |
| | 6C) A NEW COMMENT SINCE THE FIRST REVIEW AND SECOND |
| | REVIEW PE J F SHANNON WAS TAKING RESPONSIBILITY FOR THE |
| | STRUCTURAL DESIGN AND FOUND IT IN COMPLIANCE WITH THE |
| | 2004 FBC AND 2005/ 2006 SUPPLEMENTS. |
| | THIS REVIEW NOW HAS DOCUMENTS FROM THE UNIFORM BUILDING |
| | CODE ATTESTING TO THE 140 MPH WIND ZONE! PLEASE PROVIDE |
| | SIGNED AND SEALED DOCUMETS, CALCULATIONS TO RESIST THE |
| | MOMENT OF OVER-TURNINGIN A 140MPH 3 SECOND GUST WITH |
| | A COSTAL EXPOSURE. ALSO PROVIDE THE HEIGHT FACORS OF |
| | THE BUILDING THAT THIS SYSTEM WILL BE NEXT TO AND ALSO |
| | INVESTIGATE IF THE LOCATION OF THE DUST COLLECTOR IS IN |
| | AN END ZONEOR IF THE CLOSENESS OF THE EQUIPMENT WILL |
| | CREATE A VORTEX OR ADDITIONAL FLUTTERING WHICH WOULD |
| | NEED TO BE CONSIDERED AS PART OF THE WIND DESIGN. A |
| | REGISTERD FLORIDA PE WILL NEED TO SUBMIT 2 ORIGINAL |
| | SIGNED AND SEALED SETS OF PLANS FOR ATTACHEMENT OF DUST |
| | COLLECTOR AND CALCULATIONS. |
| | |
| | 1609.6.4 MAIN WIND FORCE RESISTING SYSTEM (MWFRS). |
| | ALL ELEMENTS AND CONNECTIONS OF THE MWFRS SHALL BE |
| | DESIGNED FOR VERTICAL AND HORIZONTAL LOADS BASED ON THE |
| | COMBINED LEEWARD AND WINDWARD WALL PRESSURES AND ROOF |
| | PRESSURES DETERMINED FROM TABLE 1609.6A . PRESSURES |
| | SHALL BE APPLIED IN ACCORDANCE WITH THE LOADING |
| | DIAGRAMS SHOWN IN FIGURE 1609.6A TO THE END ZONE AND |
| | INTERIOR ZONE AS SHOWN IN FIGURE 1609.6B . THE BUILDING |
| | SHALL BE DESIGNED FOR ALL WIND DIRECTIONS. FOR |
| | BUILDINGS HAVING FLAT ROOFS, A RIDGE LINE NORMAL TO THE |
| | WIND DIRECTION SHALL BE ASSUMED AT THE MIDLENGTH |
| | DIMENSION OF THE ROOF FOR ALL DIRECTIONS CONSIDERED. |
| | EACH CORNER SHALL BE CONSIDERED IN TURN AS THE WINDWARD |
| | CORNER. |
| | |
| | 6D) AGAIN IF THE PRESCRIPTIVE METHOD OF COMPLIANCE IS |
| | SELECTED REQUIREMEENTS OF CHAPTER 11 WITH EMPLOYEE |
| | TRAING PROGRAM WILL NEED TO BE SUBMITTED. |
| | |
| | |
| | 102.1* WHERE, IN ANY SPECIFIC CASE, DIFFERENT SECTIONS |
| | OF THIS CODE SPECIFY DIFFERENT MATERIALS, METHODS OF |
| | CONSTRUCTION OR OTHER REQUIREMENTS, THE MOST |
| | RESTRICTIVE SHALL GOVERN. WHERE THERE IS A CONFLICT |
| | BETWEEN A GENERAL REQUIREMENT AND A SPECIFIC |
| | REQUIREMENT, THE SPECIFIC |
| | REQUIREMENT SHALL BE APPLICABLE. |
| | |
| | BUILDING PLAN REVIEW |
| | JIM WITMER C. B. O. |
| | BUILDING PLAN REVIEW II |
| | |
| | |
| | |
| | |
| | |
| | TEL: (561)805-6715 |
| | FAX: (561)659-8026 |
| | E-MAIL: [email protected] |
| | |
| | |
| | |
| | |
| | |
| | |
| | |