| Plan Review Notes For Permit 07040695 |
| Permit Number |
07040695 |
|
| Review Stop |
ENG |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2007-09-18 13:34:50 | ***** FAILED ***** | | | | | | PLEASE PROVIDE THE FOLLOWING INFO: | | | | | | 1.YOUR STORM WATER MANAGEMENT SYSTEM REPORT SUBMITTED | | | TO US DOES NOT EXPLAIN HOW DID YOU DETERMINE FLOOR | | | ELEVATION.FIRST FLOOR ELEVATION MUST MEETFLOOD ZONE | | | AREA, & 5,10, 25, 100 YEAR FLOOD CRITERIATO DETERMINE | | | THE FIRST FLOOR ELEVATION, MUST MEET THESE MINIMUM | | | REQUIREMENTS. PLEASE SHOW CROWN OF THE ROADS | | | ELEVATIONS, SIDEWALK ELEVATIONS TOO. | | | 2.PLEASE SHOW IN YOUR STORM WATER QUALITY CALCULATIONS, | | | WHAT CRITERIA YOU ASSUMEDFOR RUNOFF CAL.,, LIKE 1" | | | OVER ENTIRE SITE OR2.5"CRITERIA, ETC? | | | 3. WHAT IS THE SITE AREA, YOU ARE DEVELOPING FOR THIS | | | PROJECT ? PLEASE SHOW ON DRAWINGS, ALSO, WHAT IS TOTAL | | | PERVIOUS,& IMPERVIOUS AREA FOR THIS PROJECT. THESE SITE | | | AREA MUST BE SAME AS SHOWN IN DRAWINGS AND WATER | | | QUALITY CALS. | | | 4.PLEASE SHOW ALL STORM WATER PIPES AROUND YOUR SITE | | | SO, WE CANSEE THE BEST PIPE TO CONNECT WITH THE STORM | | | WATERFROM ALL OTHER STORM WATER PIPES. | | | 5. WATER & SEWER PLANS MUST BE APPROVED FROM 45TH | | | STREET (MANNY G.), UTILITY DEPT BEFORE WE APPROVED | | | 6. ALSO PLEASE SHOW ALL CATCH BASINS NEAREST,AROUND | | | YOUR SITE FOR STORM WATER DRAIN. | | | | | | PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR | | | PERMITTING PROCESS | | | | | | RASIK CHOKSHI805-6723 |
|