| Date |
Text |
| 2007-04-23 09:37:52 | *** DENIED *** |
| | 1) ENERGY CALCULATIONS NEED TO BE SIGNED BY OWNER/AGENT |
| | ALSO, SEE 2004 FBC 13-600.3.ABC.2. |
| | |
| | 2) SHOW ON PLANS TOTAL AND SENSIBLE BTU'S. OF COOLING |
| | EQUIPMENT. |
| | |
| | 3) BUILDING PLANS ON FILE SHOW 8 FOOT HIGH CEILINGS, |
| | COOLING LOAD CALCULATIONS SUBMITTED SHOW 10 FOOT HIGH |
| | CEILINGS, PLEASE CORRECT COOLING LOAD CAL'S. |
| | |
| | 4) BUILDING PLANS ON FILE SHOW A POCKET DOOR BETWEEN |
| | THE FAMILY ROOM AND THE MASTER SUITE ( M.BED, M.BATH, |
| | M.CLOSET) THEIR FOR THE 12" RETURN AIR TRANSFER DUCT |
| | FROM THE MASTER BEDROOM TO THE FAMILY ROOM NEEDS TO BE |
| | 16", SEE 2004 FBC/R M1602.4 (C) EXCEPT, PLEASE |
| | CORRECT. |
| | |
| | 5) THE 8" RETURN AIR TRANSFER DUCT FROM BEDROOM #3 TO |
| | THE HALL NEEDS TO BE 10", SEE 2004 FBC/R M1602.4 (A), |
| | PLEASE CORRECT. |
| | |
| | *** 2004 FBC/R M1602.4. BALANCED RETURN AIR MAY BE |
| | ACHIEVED BY. |
| | (A)TRANSFER DUCTS MAY ACHIEVE THIS BY INCREASING THE |
| | RETURN TRANSFER ONE AND ONE HALF TIMES THE CROSS |
| | SECTIONAL AREA (SQUARE INCHES) OF THE SUPPLY DUCT |
| | ENTERING THE ROOM OR SPACE IT'S SERVING AND THE DOOR |
| | HAVING AT LEAST AN UNRESTRICTED 1 INCHUNDERCUT TO |
| | ACHIEVE PROPER RETURN AIR BALANCE. |
| | (C)HABITABLE ROOMS ONLY SHALL BE REQUIRED TO MEET |
| | THESE REQUIREMENTS FOR PROPER BALANCED RETURN AIR |
| | EXCLUDING BATHROOMS, CLOSETS, STORAGE ROOMS AND LAUNDRY |
| | ROOMS, EXCEPT THAT ALL SUPPLY AIR INTO THE MASTER SUITE |
| | SHALL BE INCLUDED. PER 2004 FBC/R M1602.4 . |
| | |
| | MECHANICAL PLAN REVIEW BY; |
| | TOM GORDON (561) 805-6729. |