| 2007-08-14 16:33:48 | REVIEW #: 2ND |
| | ACTION: DENIED |
| | |
| | FBC 2004 CODE FAMILY W/ 2005 AND 2006 AMENDMENTS |
| | FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| | |
| | THE FOLLOWING COMMENTS ARE NUMBERED TO CORRESPOND WITH |
| | PREVIOUS EVIEW COMMENTS FOR THE PURPOSE OF CONTINUITY. |
| | |
| | 1. OK |
| | |
| | 2. BUILDING RELIEF SHOULD ONLY BE USED IF A BUILDING IS |
| | UNDER AN UNUSUALLY HIGH POSITIVE PRESSURE. THIS SYSTEM |
| | IS NOT BALANCED AS SUCH. THE AIR BALANCE ON FIRST FLOOR |
| | IS NOW AT -1365 CFM. AN OVERALL NEGATIVE PRESSURE IN |
| | THE BUILDING IS NOT ALLOWED. THE MECHANICAL SYSTEM |
| | SHALL BE DESIGNED TO ASSURE THAT THE BUILDING IS |
| | PRESSURIZED WITH RESPECT TO THE OUTDOORS IN ACCORDANCE |
| | WITH FBC 13-409.1.ABC.2. PROVIDE AN OVERALL AIR BALANCE |
| | SCHEDULE FOR THE BUILDING SHOWING COMPLIANCE WITH THIS |
| | SECTION. |
| | |
| | 3. OK |
| | |
| | 4. OK |
| | |
| | 5. PLEASE SHOW HOW ONE 600 CFM TRANSFER (TD-5 ON |
| | SCHEDULE) WILL ALLOW FOR 950 CFM OF MAKE-UP AIR. ALSO, |
| | WHEN THIS COMMENT IS ADDRESSED, PLEASE TAKE INTO |
| | ACCOUNT THE ISSUE RAISED BY THE LATEST COMMENT #2. |
| | |
| | 6. OK |
| | |
| | 7. OK |
| | |
| | 8. SOME REVISIONS HAVE TAKEN PLACE IN THIS AREA ON |
| | ARCHITECTURAL PLANS. IT APPEARS THAT A FIRE DAMPER HAS |
| | BEEN UNNECESSARILY ADDED TO THE OA DUCT THROUGH THE |
| | WALL BETWEEN ROOMS 150 AND 103. ALSO, A FIRE DAMPER IS |
| | MISSING IN THE 6X6 SUPPLY DUCT WHICH TERMINATES AT THE |
| | WALL BETWEEN ROOMS 101 AND 110. AS FOR BALANCED RETURN, |
| | THERE IS NO EXCEPTION IN FBC,M 601.4 FOR DOORS WITH |
| | HOLD-OPEN DEVICES. PROVIDE BALANCED RETURN. |
| | |
| | 9. OK |
| | |
| | 10. SEE COMMENT #2. |
| | |
| | 11. THERE ARE DOORS BETWEEN ROOMS 200 AND 201. PROVIDE |
| | BALANCED RETURN PER FBC,M 601.4. |
| | |
| | 12. OK |
| | |
| | 13. OK |
| | |
| | 14. OK |
| | |
| | 15. SEE COMMENT #11. |
| | |
| | 16. OK |
| | |
| | 17. OK |
| | |
| | 18. PRODUCT APPROVAL WITH INSTALLATION INSTRUCTIONS |
| | SHALL BE ON SITE FOR INSPECTION. |
| | |
| | 19. OK |
| | |
| | 20. A) PROVIDE TWO SETS OF ENERGY CALCULATIONS, EACH |
| | WITH THE ORIGINAL SIGNATURE AND SEAL OF THE DESIGNER |
| | PER FBC 13-103.1.1.1. NO PHOTOCOPIED SIGNATURES OR |
| | SEALS WILL BE ACCEPTED. |
| | B) BUILDING OWNER OR OWNER'S ARCHITECT SHALL CERTIFY |
| | THAT THE BUILDING IS IN COMPLIANCE WITH CHAPTER 13 OF |
| | THE FBC PER FBC 13-400.3.ABC.2. |
| | C) VERIFY THAT THE TYPES OF BUILDING COMPONENTS USED IN |
| | THE INPUT DATA REPORT MATCHES THE TYPES SHOWN ON THE |
| | PLANS AND/OR THE BUILDING. EXAMPLE: THIS IS NOT A METAL |
| | BUILDING WITH R-19 BATTS AS IS SHOWN ON ENERGY |
| | CALCULATIONS. IS THE EXTERIOR OF THIS BUILDING 6" METAL |
| | STUDS WITH R-13 BATTS? |
| | |
| | 21. OK |
| | |
| | 22. PG MC-702 DETAIL 1: NOTE #9, FCU'S SHALL BE SHUT |
| | DOWN BY DUCT SMOKE DETECTOR OR AREA SMOKE DETECTOR PER |
| | FBC,M 606.2.1. |
| | |
| | 23. OK |
| | |
| | IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |
| | RONALD J REGUEIRO |
| | 561.805.6719 |